Title: GBSQSS recommendation updates for offshore transmission networks


1
GBSQSS recommendation up-dates foroffshore
transmission networks
  • GBSQSS Sub Group
  • OTEG 1st November 2006

2
Contents
  • Clarification notes
  • Diversified versus non-diversified wind farm
    output
  • Single and multiple wind farm connections
  • Recommendation updates
  • Further work plan
  • Scope of Grid Code review
  • Issues for OTEG consideration

3
Clarification notes power output
Diversified
Non - Diversified
Individual wind turbines
Wind farm B
Wind farm A
  • Assumes wind speed for single wind turbine
  • Calculates turbine power output based on wind
  • speed
  • Calculates wind farm total output based upon
  • single turbine output X turbines in the wind
    farm
  • Wind farm spend more time at extremes
  • i.e. maximum output and zero
  • Assumes wind speed will never be uniform across
  • the foot print of the wind farm
  • Calculates turbine power output based on
    variable
  • wind speed across area of wind farm
  • Wind farm spends less time at extremes
  • i.e. maximum output and zero

4
Clarification notes
  • Single and multiple wind farms single and
    multiple user connections

250MW user A Power station Y
250MW user A Power station X
250MW user B Power station Y
250MW user A Power station X
Multiple user connection
Single user connection
Local offshore platform
Single 500MW circuit
Single 450MW circuit
Shoreline
Onshore grid entry point
Onshore grid entry point
Figure 1 Connection of a single wind farm
Figure 2 connection of multiple wind farms
5
Recommendation up-dates
  • Specification of transformer platform capacity
    Installation of low voltage cable capacity as an
    option
  • Clarification of single and multiple wind farm
    connections
  • Further issues for sub-group and OTEG
    consideration

ownership of these LV cables requires
consideration
6
Further work plan
  • November
  • Review of security for demand connections
  • Review of security for generation with higher
    annual capacity factor
  • Review of connection of generation to islands in
    Scotland
  • Timescales to be advised
  • Voltage limits for offshore transmission
  • Feed into, if requested, Embedded Transmission
    discussions
  • Feed into, if requested, Access Rights and
    Compensation discussions

7
Scope of Grid Code Review (1)
  • Modifications to the Grid Code and STC are
    required
  • Relevant assumptions and conclusions made by the
    GBSQSS Sub-group will be taken into consideration
  • Consideration will be given to the outcome of
    Embedded Transmission discussions

8
Scope of Grid Code review (2)
  • 1) Review Grid Code technical requirements on
    Generators wishing to connect to offshore
    Networks
  • 2) Identify technical requirements on offshore
    TOs connecting to the onshore System.
  • 3) Identify the consequential STC modifications
    that capture the GBSO /offshore TO interface

9
Further issues for OTEG consideration
  • Ownership of low voltage cables providing
    transmission capacity

500MW Offshore TS
Entry Point
500MW
Offshore TS Entry Point
Offshore Transmission circuits
Shoreline
Onshore substation (existing or new)
10
Further issues for OTEG consideration
  • Grid Code working group formation
  • Option (a) Review GBSQSS sub-group membership and
    invite new members as appropriate
  • Option (b) Formation of new Grid Code Sub-group
  • GBSQSS sub-group recommendation extend
    invitation to GB Grid Code Review Panel members
  • Terms of Reference for Grid Code sub-group
  • Timescales and progress plan for Grid Code review
    work
Write a Comment
User Comments (0)
About PowerShow.com