Title: GBSQSS recommendation updates for offshore transmission networks
1GBSQSS recommendation up-dates foroffshore
transmission networks
- GBSQSS Sub Group
- OTEG 1st November 2006
2Contents
- Clarification notes
- Diversified versus non-diversified wind farm
output - Single and multiple wind farm connections
- Recommendation updates
- Further work plan
- Scope of Grid Code review
- Issues for OTEG consideration
3Clarification notes power output
Diversified
Non - Diversified
Individual wind turbines
Wind farm B
Wind farm A
- Assumes wind speed for single wind turbine
- Calculates turbine power output based on wind
- speed
- Calculates wind farm total output based upon
- single turbine output X turbines in the wind
farm - Wind farm spend more time at extremes
- i.e. maximum output and zero
- Assumes wind speed will never be uniform across
- the foot print of the wind farm
- Calculates turbine power output based on
variable - wind speed across area of wind farm
- Wind farm spends less time at extremes
- i.e. maximum output and zero
4Clarification notes
- Single and multiple wind farms single and
multiple user connections
250MW user A Power station Y
250MW user A Power station X
250MW user B Power station Y
250MW user A Power station X
Multiple user connection
Single user connection
Local offshore platform
Single 500MW circuit
Single 450MW circuit
Shoreline
Onshore grid entry point
Onshore grid entry point
Figure 1 Connection of a single wind farm
Figure 2 connection of multiple wind farms
5Recommendation up-dates
- Specification of transformer platform capacity
Installation of low voltage cable capacity as an
option - Clarification of single and multiple wind farm
connections - Further issues for sub-group and OTEG
consideration
ownership of these LV cables requires
consideration
6Further work plan
- November
- Review of security for demand connections
- Review of security for generation with higher
annual capacity factor - Review of connection of generation to islands in
Scotland - Timescales to be advised
- Voltage limits for offshore transmission
- Feed into, if requested, Embedded Transmission
discussions - Feed into, if requested, Access Rights and
Compensation discussions
7Scope of Grid Code Review (1)
- Modifications to the Grid Code and STC are
required - Relevant assumptions and conclusions made by the
GBSQSS Sub-group will be taken into consideration - Consideration will be given to the outcome of
Embedded Transmission discussions -
8Scope of Grid Code review (2)
- 1) Review Grid Code technical requirements on
Generators wishing to connect to offshore
Networks - 2) Identify technical requirements on offshore
TOs connecting to the onshore System. - 3) Identify the consequential STC modifications
that capture the GBSO /offshore TO interface -
9Further issues for OTEG consideration
- Ownership of low voltage cables providing
transmission capacity
500MW Offshore TS
Entry Point
500MW
Offshore TS Entry Point
Offshore Transmission circuits
Shoreline
Onshore substation (existing or new)
10Further issues for OTEG consideration
- Grid Code working group formation
- Option (a) Review GBSQSS sub-group membership and
invite new members as appropriate - Option (b) Formation of new Grid Code Sub-group
- GBSQSS sub-group recommendation extend
invitation to GB Grid Code Review Panel members - Terms of Reference for Grid Code sub-group
- Timescales and progress plan for Grid Code review
work