Title: HM


1
HME StandardizationExCommWorking Group One
11 DECEMBER 2006
2
Mission
  • Establish standardization mechanisms and
    incentives to be used during acquisition phase
  • Promote HME standardization for the acquisition
    of new systems during new construction
  • Apply HME policy, processes, and approaches in
    new construction contracts

3
HME Standardization WG 1 Members New
Construction
4
30 120 Day Update
  • Completed items last 30 days
  • Hosted SHAPM / NAVICP / Shipbuilder (NGSS, BIW,
    NGNN) Standardization Road Ahead Meeting (8 Nov).
  • Obtained list of DDG 1000 material from parts
    catalogue.
  • Drafted award fee event language for insertion
    into DDG 1000 contract.
  • Confirmed and identified the existence of two
    standardization NAVSEA C clauses in the SEA 02
    database.
  • Next 120 days
  • Determine metrics and goals for standardization
    within DDG 1000 and CVN 21 programs.
  • Analyze DDG 1000 Class Common Equipment list and
    report associated standardization metrics.
  • Extract detail design material lists from CPC for
    DDG 1000. Analyze this list for metrics
    development and to optimize NAVICP commodity
    contracts.
  • Conduct follow up reviews with NAVICP, Shipyards,
    and new construction PMs to investigate use of
    supply system for commodity buys.
  • Include award fee event in DDG 1000 detailed
    design contract.
  • Identify design specs that drive up equipment
    cost.
  • Investigate LCS 3 and 4 standardization
    opportunities

5
HME Standardization WG 1 Members Action
Plan
6
Standardization at the Shipbuilders
  • NGSS
  • For the LHD 8 Program, a standardization program
    was established for equipment designers which
    requires them to perform a standardization review
    prior to vendor selection
  • Requires a review of
  • Hull, Mechanical and Electrical Equipment Data
    Research System (HEDRS)
  • Supportable Equipment Lists (SELs)
  • Ship-specific Allowance Parts Lists (APLs) and
    Coordinated Shipboard Allowance Lists (COSALs)

Analyze Designand Performance Requirements
Develop Procurement Spec and TPR/SOW
Accomplish Logistic Standardization Reviews
Forward to Potential Bidders
Receive/Review Supplier Proposals, Complete
Logistics Supplier Evaluations
Determine Equipment/ Component and Supplier
Selection
Develop Purchase Order Ensure Standardization
Requirements
Transmit to Supplier
7
Standardization as a Specification
  • For the DDG 1000 Program, Standardization has
    been contractually mandated within the Design,
    Build and Process Specification (DBPS 080
    Support System)
  • The requirement to have standardization for DDG
    1000 has been invoked since the initial stages of
    the program
  • Language is common with spec language on CVN-21
    contract

8
Promoting Standardization through Class Common
Equipment
  • DDG 1000 has a CCE list of 119 items
  • Ensures that equipment will be common at both
    shipyards for these items
  • List includes items known to be standardization
    offenders
  • Pumps
  • Motors
  • Valves
  • Load centers and switchboards
  • Includes items unique to DDG 1000
  • Propellers
  • Advanced Degaussing
  • Steering Gear
  • Includes high cost items
  • LV and HV Ships Service power
  • Auxiliary Gas Turbine Generator

Design Requirements, COTS and New Technology
Drives the Use of Some Non-standard Parts
9
CVN 21 Standardization
  • Goal Reduce TOC
  • Key features of CVN 21 Program
  • Use common fleet-wide systems/equipment/components
    where practicable
  • Use existing logistic support products vice
    development of new technical data
  • Non Standard COTS must be approved by WBS 2.8
    Team before using
  • Embedded in CVN 21 Supportability Plan
  • Requirements established by Program Office
  • Implemented by Shipbuilder (WBS Working Groups)
  • Quarterly review of LDY (NGNN) Proposed
    equipment/component standardization lists against
    HEDRS
  • Formal meetings with LDY to ameliorate differences

10
CVN 21 Standardization
  • The CVN 21 approach to standardization is based
    on fostering intra-Navy and intra-ship
    commonality of systems, equipment, and components
  • The CVN 21 Standardization Program requirements
    invoked during concept development and design
    phase and will be administered during
    construction in accordance with the CVN 78
    Specifications and Special Provisions of the
    Contract. These include
  • Maximizing the use of standard equipment for
    similar functions in the ship (intra-ship
    standardization)
  • Attaining the optimal level of commonality and
    standardization of systems/equipment/components
    by maximizing the use of items already installed
    in operational carriers (intra-class
    standardization)
  • Achieving optimal standardization of
    systems/equipment/components by maximizing the
    use of items already installed in ships of the
    fleet (intra-navy standardization)
  • By-products of standardization include reduction
    of unique technical data, and increased
    transferability of operational and maintenance
    skills

11
Summary
  • New construction PMs are including
    standardization requirements in contracts
  • Shipbuilders are improving established
    standardization processes
  • DDG 1000 offers opportunity to demonstrate
    improved standardization process, with CVN-21 to
    follow

12
Backup
13
Ship Delivery Schedule through 2015
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
J
A
J
O
J
A
J
O
J
A
J
O
J
A
J
O
J
A
J
O
J
A
J
O
J
A
J
O
J
A
J
O
J
A
J
O
J
A
J
O
DDG 1000/100105-12
DDG 100201-14
DDG 100307-15
LCS 10/1103-11
LCS 22/2303-13
LCS 26/2709-13
LCS 3403-15
LCS 5/608-09
LCS 7/803-10
LCS 14/1509-11
LCS 18/1906-12
LCS 30/3106-14
LCS 37/3809-15
LCS 106-07
LCS 906-10
LCS 311-08
LCS 403-08
LCS 12/1306-11
LCS 16/1703-12
LCS 20/2109-12
LCS 24/2506-13
LCS 28/2903-14
LCS 32/3309-14
LCS 35/3606-15
LCS 211-07
DDG 10109-06
DDG 10411-07
DDG 10607-08
DDG 10801-09
DDG 10909-09
DDG 11211-10
DDG 10012-06
DDG 10301-08
DDG 10511-08
DDG 10707-09
DDG 11007-10
DDG 10203-07
DDG 11104-10
LPD 18 12-06
LPD 1903-07
LPD 2012-07
LPD 2104-08
LPD 2206-10
LPD 2310-10
LPD 2403-11
LPD 2510-11
LHD 812-07
LHA 612-11
CVN 7811-08
CVN 7909-15
SSGN 72712-06
SSGN 72909-07
SSN 77603-07
SSN 77706-08
SSN 77804-09
SSN 77904-10
SSN 78004-11
SSN 78104-12
SSN 78204-13
SSN 78304-14
SSN 78404-15
KEY
BIW Delivery
NGSS Delivery
Shipbuilder TBD (NGSS/BIW)
Other
14
NAVSEA 02 Standardization C Clause
  • HQ C-2-0052 STANDARDIZATION (NAVSEA) (SEP 1990)
  • Subject to meeting the requirements of the
    specifications, the Contractor shall utilize
    equipments and components identical to those of
    the ___ Class Ships. Where equipments or
    components are not available, the Contractor
    shall select hull, mechanical, and electrical
    components in the following order
  • (a) Equipment which meets the requirements of
    the specifications and is identical to equipments
    and components of the ___ Class Ships.
  • (b) Equipment which meets the requirements of
    the specifications and which appears in NAVSEA
    Standard Components List for Hull, Mechanical and
    Electrical Equipment, NAVSEA S 0300 A PLL OO O
    (standard equipment).

15
DDG 1000 Parts Standardization Process
No
Start Catalog Activities
Process Activities
Submit Parts to NGSS for Concurrence in TcC log
BIW PSB NGSS PSB Catalog Group
Yes
Approved
Identify Std Parts
Pull From TcC log, Review Parts at NGSS for
Concurrence Submit decision to log
No
Create DDG 1000 applic. part in CPC Add cat No to
TcC log,
Create CPC equivalency Notify completion in TcC
log
Exist?
Make applic to DDG 1000 Add Cat No to TcC log,
Yes
Determine if Catalog item exists
Systems/Data
CPC Enovia TcC Log 2nd Shipyard
Outputs
16
Standardization of Submarine Programs