USER COMMUNITY NAVIGATION TRANSITION PLAN - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

USER COMMUNITY NAVIGATION TRANSITION PLAN

Description:

Northwest Airlines. PARTICIPANTS. Aircraft Owners & Pilots Association ... VNAV for all existing non-precision instrument approach procedures at Part 139 airports ... – PowerPoint PPT presentation

Number of Views:54
Avg rating:3.0/5.0
Slides: 14
Provided by: frankal
Category:

less

Transcript and Presenter's Notes

Title: USER COMMUNITY NAVIGATION TRANSITION PLAN


1
USER COMMUNITY NAVIGATION TRANSITION PLAN
19TH ANNUAL FAA/JAA INTERNATIONAL CONFERENCE June
3-7, 2002 Phoenix, Arizona
Presented by Frank Alexander Northwest Airlines
2
PARTICIPANTS
  • Aircraft Owners Pilots Association
  • Air Transport Association of America
  • United States Air Force (DoD)
  • National Business Aircraft Association
  • Regional Airline Association

3
PHASE I II DOMAINS
  • APPROACH
  • TERMINAL
  • EN ROUTE AT ABOVE FL 290
  • EN ROUTE BELOW FL290
  • OCEANIC

4
PHASE III DOMAINS
  • APPROACH
  • TERMINAL
  • EN ROUTE AT ABOVE FL 180
  • EN ROUTE BELOW FL 180
  • OCEANIC

5
TRANSITION TIMELINE
2015
2002
2005
2025
PHASE I
PHASE II
PHASE III
6
Transition Timeline
2000
2005
2025
2015
PHASE 1
PHASE 2
PHASE 3
7
PHASE I
  • APPROACH
  • VNAV for all existing non-precision instrument
    approach procedures at Part 139 airports
  • All new approach procedures NOT ILS will be RNAV
    (with a few exceptions)
  • FAA will support industry initiatives for RNP
    procedures for RNP
  • TERMINAL
  • Continue expansion of RNAV procedures
  • Basic accuracy is RNP 2 

8
PHASE I
  • EN ROUTE
  • IMPLEMENTATION OF RNAV ROUTES
  • BASIC ACCURACY RNP-4
  • ALTERNATE MEANS OF NAVIGATION REQUIRED
  • OCEANIC
  • EXPAND RNP-10 AND INTRODUCE RNP-4
  • USE CNS APPLICATIONS TO REDUCE SEPARATION
    STANDARDS

9
PHASE II
  • APPROACH
  • RNAV MINIMA BASED ON GLS (WAAS)
  • RNP
  • RF SEGMENTS ADDED TO RNAV APPROACHES
  • PROVIDED IN ADDITION TO STRAIGHT LEG TRANSITIONS
  • PUBLIC LAAS APPROACHES INTRODUCED
  • POSSIBLE SUPPORT FOR CAT II/III
  • TERMINAL
  • RNP-1 ACCURACY REQUIRED FOR ALL CLASS B AIRSPACE
    FOR IFR OPERATIONS
  • SURVEILLANCE MAY BE DEPENDENT OR INDEPENDENT
  • RNP-X RNAV INTRODUCED FOR PUBLIC PROCEDURES BUT
    WILL REQUIRE SPECIAL AUTHORIZATION

10
PHASE II
  • EN ROUTE BELOW FL290
  • RNP-4 WILL BE PRIMARY NAV ACCURACY VALUE
  • VICTOR AIRWAYS TO BE PHASED OUT CONCURRENT WITH
    BUILD DOWN OF NAV AIDS
  • A/C NOT FILING RNAV MUST HAVE AN ALTERNATE MEANS
    OF NAV
  • AT THE END OF PHASE II, RNAV SYSTEMS MEETING
    RNP-4 ACCURACY WILL BE MANDATORY
  • EN ROUTE AT ABOVE FL290
  • RNP-4 WILL BE PRIMARY NAV ACCURACY VALUE
  • JET AIRWAYS WILL BE PHASED OUT CONCURRENT WITH
    BUILD DOWN OF NAV AIDS
  • ADDITIONAL ROUTING FLEXIBILITY TIED TO EXPANDED
    USE OF CONTROLLER DECISION SUPPORT

11
PHASE II
  • OCEANIC
  • RNP-4 RNAV WITHIN U.S. FIRS
  • RNP-2 RNAV FOR WATRS, CARIBBEAN, GULF OF MEXICO
  • SOME REQUIREMENTS MAY NOT BE APPLICABLE TO STATE
    AIRCRAFT

12
PHASE III
  • APPROACH
  • RNAV APPROACH PROCEDURES MANDATORY
  • LANDING MINIMA BASED ON RNP RNAV/BARO VNAV OR GLS
    (WAAS/LAAS)
  • WHERE GROUND BASED NAV AIDS REMAIN, THOSE NAV
    AIDS MAY SUPPORT INSTRUMENT APPROACHES
  • TERMINAL
  • RNP-1 RNAV MANDATORY IN CLASS B AIRSPACE
  • RNP 0.3 RNAV MAY BE USED WHERE ADVANTAGEOUS
  • SURVEILLANCE MAY BE DEPENDENT OR INDEPENDENT

13
PHASE III
  • EN ROUTE BELOW FL180
  • RNP RNAV AVAILABLE BUT NOT MANDATORY
  • PUBLISHED RNAV ROUTES REMAIN
  • FREE FLIGHT AVAILABLE IF REQUESTED
  • EN ROUTE AT ABOVE FL 180
  • RNP-2 RNAV MANDATORY FOR ALL AIRCRAFT
  • FREE FLIGHT AVAILABLE CONTINGENT ON OPERATING
    ENVIRONMENT
  • FREE FLIGHT MANDATORY AT THE END OF PHASE III
Write a Comment
User Comments (0)
About PowerShow.com