Description:

Old Navy Building. 6. Looks like the building will be 200-220K Gross Square Feet (GSF) ... Wean Hall = 290K (We have about ) NSH = 155K ... – PowerPoint PPT presentation

Number of Views:42
Avg rating:3.0/5.0
Slides: 43
Provided by: guyble
Learn more at: http://www.cs.cmu.edu
Category:
Tags: center | gates | navy | old

less

Transcript and Presenter's Notes

Title: Gates Center


1
Gates Center
  • Faculty Lunch Jan. 19, 2005

2
Outline
  • Location, Size and Massing
  • Architect Selection/Timeline
  • The Interior Space What do we want?

3
SCS Building Committee
  • Small committee
  • Guy Blelloch (Chair)
  • Randy Bryant
  • Sharon Burks
  • Peter Lee
  • Jim Skees
  • Manuela Veloso
  • ???
  • Everyone is encouraged to give input.

4
Proposal Design
5
A Hiccup
West Campus
6
  • Looks like the building will be 200-220K Gross
    Square Feet (GSF)
  • Original Proposal 150K
  • Wean Hall 290K (We have about ½)
  • NSH 155K
  • With 220K we would still have to keep about 30K
    of Wean Hall. With 150K we would have to keep
    about 100K.
  • Note Assignable Square Feet (ASF) .6 GSF

7
  • Exactly what parts of SCS move into the new
    building has not yet been decided

8
Deciding on the Massing
9
Some Constraints
Maintain Alignment and create pathway
10
Some Constraints
Preserve view of Oakland??
11
Some Goals
Create a SCS quad with greenspace
12
Some Goals
Indoor above grade Connection to NSH
13
Some Goals
Easy Connection to the Cut
14
Some Goals
Visitors entrance on Forbes
15
Some Goals
Underground Parking
16
Some Constraints
Accessible undergraduate core
17
Some Constraints
Lots of light and nice views
18
Example Design
bridge
Terrace even with cut (3 floors below)
19
Connections
20
Undergraduate core
21
Greenspace and views
22
Selecting an Architect
  • A Committee Headed by Christina Gabriel
  • SCS Peter Lee, Randy Bryant, Guy Blelloch
  • Trustees Lucian Caste, Oscar Harris
  • Architecture Gerard Damiani, Laura Lee
  • FMS Paul Tellers
  • Request for Qualifications (sent and received)
  • Select final 3-5 by February

23
Original Timeline
Jan 05
Jan 06
Jan 07
Jan 08
Jan 09
completion
architect selected
schematic design
construction docs
groundbreaking
our input into the design
fundraising
Probably a month or two behind
24
Interior Organization
  • Many Questions
  • Special Wishes
  • Grouping
  • Types of common spaces
  • Conference room features and sizes
  • Undergraduate/Research connecitivity
  • Time Critical How do these affect the layout

25
UC Berkeley
5 Levels of Detail
26
Function
27
Groups
28
Rectangles
29
Sketch
30
Floor Plan
31
(No Transcript)
32
(No Transcript)
33
UW Allen Center
34
(No Transcript)
35
UCSD
UCSD
36
(No Transcript)
37
(No Transcript)
38
(No Transcript)
39
(No Transcript)
40
Stata Center (MIT) Student Street
41
(No Transcript)
42
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com