Performance Test Planning Part 3 - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Performance Test Planning Part 3

Description:

... breakpoint testing, which determines EDS' maximum throughput, is separate ... tests will include submissions to an EDS credit engine that returns an LP ... – PowerPoint PPT presentation

Number of Views:48
Avg rating:3.0/5.0
Slides: 10
Provided by: brian662
Category:

less

Transcript and Presenter's Notes

Title: Performance Test Planning Part 3


1
Performance Test Planning Part 3
CS 4803 EPR
Distributed Computing Performance Engineering
2
Lecture Overview
  • Performance Test Planning Part 3
  • Scenarios
  • Workloads
  • System
  • Enterprise
  • Test environments
  • Assumptions
  • Risks
  • Case Studies and White Papers
  • Student Presentations 4

3
Scenarios
  • Performance vernacular
  • Different than UML definition
  • Combination of scripts
  • Tool-specific paradigm
  • Other vernacular
  • Scenario sometimes analogous to Test Cases (i.e.
    UPS)

4
Scenarios (contd)
  • Scenario analogous to a particular experiment
    or test run

5
Workload
  • Two types of Workload Distributions
  • System
  • Distribution of component workloads
  • Scope limited to components of an autonomous
    system
  • Enterprise
  • Distribution of system workloads

6
Workload (contd)
7
Test Environments
  • Detail technology stack
  • Detail HW configurations
  • Production environment diagram
  • Performance environment diagram
  • Machine names
  • IP addresses
  • Interfaces

8
Assumptions
  • List all Assumptions!
  • For example
  • All performance testing will be done by ISS in an
    environment that supports LP production
    configuration and volume levels.
  • LP breakpoint testing, which determines EDS
    maximum throughput, is separate testing conducted
    outside of the project performance testing and is
    not within the scope of performance testing
    detailed in this test plan.
  • LP.com, LP Inside, LP Classic and System-System
    all share a common Framework for credit services.
    The common Framework will be tested at volume
    levels that support concurrent transactions from
    all LP products.
  • Performance tests will include submissions to an
    EDS credit engine that returns an LP Feedback
    Certificate (i.e., submission cannot result in a
    processing error).
  • Distribution of File Import versus Macro Import
    (One-way) is 70/30, based on market share
    analysis.
  • Mortgagebot will not be doing performance testing
    with us so we will need to find a way to stub
    the pricing transactions to simulate a response
    from Mortgagebot.
  • The pricing call transactions should be a mix of
    price and lock transactions.

9
Risks
  • List all issues that present any potential
    jeopardy to the performance project, i.e.
Write a Comment