HCAL Frontend Electronics - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

HCAL Frontend Electronics

Description:

Front End Electronics. Principal components: QIE (charge integrator and encoder) Fermilab ASIC ... Front-end electronics are on schedule ... – PowerPoint PPT presentation

Number of Views:62
Avg rating:3.0/5.0
Slides: 12
Provided by: dang5
Category:

less

Transcript and Presenter's Notes

Title: HCAL Frontend Electronics


1
HCAL Front-end Electronics
  • HCAL Front-end Electronics Report
  • November, 2002

2
FE/DAQ Electronics

3
Front End Electronics
  • Principal components
  • QIE (charge integrator and encoder)
  • Fermilab ASIC
  • CCA (channel control ASIC)
  • Fermilab ASIC
  • GOL (gigabit optical link)
  • CERN ASIC
  • L4913 (rad hard voltage regulator)
  • STC ASIC from CERN specifications
  • HFE419X-521 (connectorized VCSEL diode)
  • Honeywell standard 2.5 Gbit/sec device

4
6 channel FE TB Module

5
CMS QIE Production Schedule
  • Production QIE
  • QIE modified to work at 40MHz
  • 2 wafers arrived in early Oct 02
  • Production hold on remainder of wafers
  • ASIC tester verifies 40MHz operation
  • Tested parts should be in hand Feb 03

6
CCA Status
  • Engineering/Production chip submitted March 02
  • Wafers back
  • Two wafers were packaged
  • Used successfully in testbeam
  • Remainder of wafers out for packaging
  • CCA ASIC tester ready

7
GOL
  • Gigabit Optical Link (GOL) Configuration
  • 32 bit mode 1.6 Gb/s Gigabit Ethernet Protocol
  • Engineering fab order submitted
  • FNAL to help in production of ASIC tester
  • Untested parts in hand Jan 03

8
Testbeam Plots
  • 300 GeV pions
  • Sourcing

9
Front End Timeline

10
Summary
  • Front-end electronics are on schedule
  • CERN supplied parts, GOL and L4913, are a
    schedule concern
  • Infrastructure at SX5 for burn-in and slice tests
    could also be a schedule risk
  • Steady Progress
  • QIE development/bench studies begin 1999
  • 2 channel card June 01
  • 2 channel card w/HPD Aug 01
  • 6 channel card w/HPD March 02
  • 144 Channels in the test beam Aug 02
  • 6 channel 40MHz card Nov 02

11
Future Focus
  • Development of a low-noise cable and connector
    configuration for the HF photomultipliers.
  • Grounding studies to reduce system noise.
  • Board level radiation testing for SEE and SEL.
  • Ramping up the nested production, test and
    assembly lines for readout modules.
  • 200 card Pre-production run to be completed early
    03 for 2003 Testbeam.
  • Full Production to start July/Aug 03.
Write a Comment