CAMD PROGRAM UPDATE - PowerPoint PPT Presentation

About This Presentation
Title:

CAMD PROGRAM UPDATE

Description:

Canister. Currently the predominant sampler in the Speciated Trends Network (STN) ... Modified SASS Canister. Filter (Particulate) Acid Impregnated Filter ... – PowerPoint PPT presentation

Number of Views:44
Avg rating:3.0/5.0
Slides: 16
Provided by: USE846
Category:

less

Transcript and Presenter's Notes

Title: CAMD PROGRAM UPDATE


1
CAMD PROGRAM UPDATE

June 21-22 2007
NACAA/EPA Ambient Air Monitoring Steering
Committee Clean Air Markets Division, OAP
2
Topic Summary
  • CASTNET Network Status
  • Multi-pollutant Contract
  • Modified denuder and filter pack
  • Ozone monitoring upgrade
  • NADP passive ammonia monitoring
  • Mercury monitoring

3

Network Site Status
4
CASTNET budget in the near future
  • 25 Reduction in FY08 EPA CASTNET budget
  • Translates to 8-10 sites shutting down
  • Continuing reduction at NPS
  • Anticipate shutting down 8 sites over 5 years
  • Impact on Funding to NADP
  • Reduce Site Audit Program
  • Eliminate support for 10 sites
  • For 2008, 86 ? 69 sites
  • 45 EPA sites
  • 24 NPS sites
  • Facing 280K per yr Ozone QA cost
  • Conversion may be delayed

?
5

Multi-Pollutant Instrument Contract
  • Initiated a performance-based instrument
    procurement contract for 3.4 Million to identify
    a high resolution, multi-pollutant instrument to
    replace current CASTNET technology
  • Contractor must meet specific performance goals
    specified in the contract
  • - RFP issued March 8th
  • - Proposals due April 20th
  • - Technical Evaluation Panel (TEP) convened
    and currently writing the report
  • - Award Date July 1st (up to two contractors)
  • Contract Breakdown (July 2007- July 2012)
  • - Initial Demonstration Period (30 days)
  • - Development Period (12 months)
  • - Final Demonstration Period (30 days)
  • - Option to Purchase, Deploy and Operate
    Additional Instruments (remaining 2 years)

6
Contract Breakdown
Anticipated award of contract is July 2007
  • Base Period (2 months)
  • 2 instruments delivered within 90 days of award
  • 30 day demonstration period
  • Must meet 75 of contract performance goals
  • Option Period I (12 months)
  • 12 month development period
  • Continued evaluation of progress toward contract
    performance goals
  • Option Period II (2 months)
  • 30 day demonstration period
  • Administered by a third-party (i.e., ETV Program)
  • Must meet all of the contract performance goals
  • Option Period III-IV (Remaining 2 Option years
    2009-12)
  • Exercise option to procure and deploy additional
    instruments
  • Exercise option to operate instruments

7
Modifying the CASTNET Filterpack
Concurrently exploring a more traditional
alternative to online multi-pollutant analyzers
  • Filterpack Strengths
  • Long-term Consistent Record
  • p-SO42-
  • Total NO3- (p-NO3- HNO3)
  • Base Cations
  • Cost
  • Potential Improvements
  • Temporal Resolution (daily)
  • Add Ammonia (NH3)
  • p-NO3-/HNO3 Uncertain
  • Ammonium (p-NH4) Bias
  • chemistry on Teflon filter

Airflow
8
Met One Instruments SASS Ambient Chemical
Speciation Sampler
Currently the predominant sampler in the
Speciated Trends Network (STN) The STN samplers
collect 24-hour every 3rd day.
The SASS can be easily modified to collect
sequential daily samples. The sampling method
can also be modified to incorporate desired
improvements.
Canister
9
Modified SASS Canister
  • Acid Impregnated Filter

Ammonium from the Nylon Filter
Filter (Particulate)
Nylon Filter analyzed for particulate SO42-,
NO3-, NH4, Cl-, K, Na, Mg2, and Ca2
Denuder (2)
Denuder (2) analyzed for NH3
Denuder (1)
Denuder (1) analyzed for SO2 HNO3
Inlet
Rectifies p-NO3-/HNO3 Ammonia (NH3) yes
Removes Ammonium (p-NH4) bias 24-hour samples
10
Rural CASTNET Ozone Monitoring
11
Ozone Monitoring Upgrades
  • 57 EPA CASTNET Ozone Analyzers
  • 37 units need replacement
  • 15 units on order

Current models are no longer supported by the
manufacturer
40 CFR Part 58, Ozone Monitoring
Requirements by O3 season 2008? AIRNow and AQS
by O3 season 2008?
12
Ozone Monitor Upgrades
13
Proposed NADP Passive Ammonia Network
  • Purpose To determine actual costs of network,
    sampling variability and other considerations
  • Bi-Weekly measurements
  • Core network of 10 EPA-sponsored sites
  • Triplicate Radiello devices field blank
  • Collocated with denuder or continuous ammonia
    monitoring
  • Ongoing evaluation of data will be used to
    determine if frequency of field blanks and
    replicates may be reduced
  • 7700 per site
  • QAPP SOPs to be prepared
  • Total program cost 225K over two years
  • Additional sites may be added at 5k/site

14
Radiellos had very promising results
  • Best accuracy compared to denuder measurements
  • Best reproducibility
  • Lowest detection limits

Triplicate measurements
From Gay and Kenski
From Gay and Kenski
15
Proposed passive ammonia sites
Write a Comment
User Comments (0)
About PowerShow.com