Title: CII and Benchmarking for Construction Industry
1ELET 6100 Seminar
CII and Benchmarking for Construction Industry
Sang-Hoon (Shawn) Lee, Ph.D. College of
Technology University of Houston March 1, 2004
2Construction Industry Institute
- A consortium of leading owners, contractors,
suppliers, and academia that is interested in
improving the constructed project and the capital
investment process.
3CII Owner Members
- Colectric Partners
- ConocoPhillips
- Dofasco
- Dow Chemical
- DuPont
- Eastman Chemical
- ExxonMobil
- GSA
- General Motors
- GlaxoSmithKline
- Intel
- International Paper
- 3M
- Abbott Labs
- Air Products Chemicals
- Allegheny Energy Supply
- Anheuser-Busch
- Aramco Services
- BP America
- Bovis Lend Lease
- CITGO
- Cargill
- Celanese
- ChevronTexaco
4CII Owner Members
Solutia Southern Company Sunoco TVA U.S. Air
Force Research Lab U.S. Army Corps of
Engineers U.S. Dept. of Commerce/NIST U.S. Dept.
of Energy U.S. Dept. of Health Human Serv. U.S.
Dept. of State U.S. Steel Weyerhaeuser Company
- Eli Lilly and Company
- Marathon Oil
- NASA
- NAVFAC
- Ontario Power
- Petrobras
- Pfizer
- Praxair
- Procter Gamble
- Rohm and Haas
- Shell Oil
- Smithsonian Institution
5CII Contractor Members
CH2M HILL CSA Group Chicago Bridge Iron Day
Zimmermann Dick Corporation Dillingham
Construction Holdings Eichleay Engineers
Constructors Emerson Process Management Fluor
Daniel Foster Wheeler USA Graycor Fru-Con
Construction Hatch Associates
- ABB Lummus Global
- ALSTOM Power
- AZCO Inc.
- BEK
- BMW Constructors
- Baker Concrete
- Bechtel Group
- Black Veatch
- Burns McDonnell
- Burns and Roe
- Butler Manufacturing
- CCC Group
- CDI Engineering
6CII Contractor Members
Rust Constructors SB Shaw Group Siemens
Westinghouse Stevens Painton Structural
Group Technip USA Turner Construction Walbridge
Aldinger Washington Group Williams Group Zachry
Construction Zurich North America
- Hilti
- Honeywell International
- Jacobs
- J. A. Jones
- Johnson Controls
- Kellogg Brown Root
- Kiewit Construction
- Kværner
- M. A. Mortenson
- PSEG
- Parsons Energy Chemicals
- Primavera Systems
7Universities Active in CII Research
- Arizona State
- Auburn
- Cal-Berkeley
- Cincinnati
- Clemson
- Colorado-Boulder
- Florida
- Georgia Tech
- Kentucky
- North Dakota State
Oregon State Polytechnic Purdue San Diego
State Stanford Texas Texas AM Virginia
Tech Washington Wisconsin-Madison
8CII Membership Trends
9CII Organization
10CII Core Processes
11Benchmarking Metrics Program
- Objectives
- Establish common definitions.
- Establish metric norms.
- Determine the value of best practices.
- Provide member companies a basis for
self-analysis.
12Benchmarking Metrics Database
Number of Projects in Database
International 246
- 1112 projects
- Represents gt58 billion.
Domestic 866
13Benchmarking Metrics Database
Contractor 509
Owner 603
14Project Locations
15What do we measure?
16What do we measure?
Practice Use
Performance Metrics
Statistical Analyses
Cost Performance Schedule Performance Safety
Performance Change Performance Rework
Performance Const. Productivity Eng. Productivity
Pre-Project Planning Constructability Project
Change Mgmt. Automation/Integration Tech. Team
Building Safety Practice Planning for
Startup Materials Mgmt. Quality
Mgmt. Alignment Design Effectiveness
Value of Best Practices
17Performance Metrics
18Performance Metrics
19Practice Use Metrics
20Practice Use Metrics
21Value of Best Practices
Practice Use
Performance
Correlations
Value of Practice Use
22Value of Best Practices
Theoretical Relationship
23Value for Cost Performance
24Value for Schedule Performance
25Value for Performance Index
26Cost Savings
27Cost Savings
- 10.9MM Cost of average building
-
- x 8.5 Cost growth savings
- 926K Expected savings for typical
- project
28Schedule Reductions
29Schedule Reductions
- 28 Month Duration of average building
-
- x 31.7 Schedule growth savings
- 8 Month Expected savings for typical
- project
30Practice Use Categorization
31Performance Prediction Software
The DFA Program
- User-friendly interface
- For project managers
- For field engineers
- Multiple projects analysis
- Built-in database
- Classification
- Tips for improvement
32Project Cost Performance - Owners
(Project Cost Growth)
33Practice Use - Owners
(Standardized Practice Index)
34The Bottom Line
- Increased use of best practices.
- Better project performance.
- The ability to quantify the savings through the
CII Benchmarking program.
35Benchmarking Reports
- Data Report
- Key Reports
- Safety Report
- Value of Best Practices
- Summary Report
- Funded Studies
36Benchmarking Thoughts
Measurement is the first step that leads to
control and eventually to improvement.
-
Harrington
If you are not keeping score, youre only
practicing.
- Schneiderman
A thimble of data is worth more than a ocean
of opinion!
- Slaughter
37What gets measured, gets improved!
When you are average, you are just as close to
the bottom as you are the top. - Unknown