  • Power Point from community meetings.
  • AD/ED All day every day kindergarten
  • FTE Full time equivalency
  • K-5 Kindergarten through 5th grade
  • MS Middle School
  • HS High School
  • EC Early Childhood
  • IRC Itasca Resource Center

2
ISSUES
  • ALL DAY/EVERY DAY KINDERGARTEN
  • REALIGNMENT

3
Additional staffing needed for AD/ED
  • 5.5 FTE (includes prep time) - 467,000
  • Additional space needed
  • 5 rooms

4
Realignment
  • Approximately 125 students moved each spring
  • Affecting students, families, teachers

5
Current Space Available
  • Forest Lake 16 classrooms
  • Murphy 15 classrooms
  • Southwest 13 classrooms
  • Cohasset 14 classrooms

6
of Sections (classrooms needed)
  • Uses 06-07 numbers
  • K - 10
  • 1 - 10
  • 2 - 9
  • 3 - 9
  • 4 - 8
  • 5 - 8

7
Special Ed classroom needs with grade level
buildings
  • Grades 1-2 - 1 classroom
  • Grades 3-4 - 3 classrooms

8
Option A AD/ED with same K-5 buildings
  • Pros
  • Maintains neighborhood schools
  • Maintains family cohesiveness K-5
  • Family transportation convenience
  • Maintains current PTC structure
  • Cons
  • Additional space
  • Remodel at Forest Lake
  • Remodel at Cohasset
  • 2 additional new construction rooms needed at
    Murphy
  • Cannot begin until fall of 2008 due to
    construction
  • Realignment issues continue
  • Cost (see next slide)

9
Option A Cost
  • Build 2 classrooms - 400,000
  • Remodeling - 80,000
  • Total Cost Option A - 480,000

10
Option B AD/ED grade level buildings (K-5)
  • Pros
  • No realignment issues
  • Title I services
  • Cost savings in curriculum, materials, staff
    development
  • Cons
  • Additional space needed
  • Remodeling
  • Cost (see next slide)
  • Some current walkers need transportation
  • Unable to begin until fall of 2008
  • Cohasset students not in cohort

11
Option B Cost
  • K-1 - Forest Lake
  • 2-3 - Murphy 14 classrooms 2 additional rooms
    needed 300,000
  • 4-5 Southwest 1 additional room needed
    135,000
  • Remodeling costs in all buildings 80,000
  • Total Cost Option B -
    515,000

12
Option C AD/ED with grade level buildings
(EC-4)5th grade to MS 8th grade to HS
  • Pros
  • Start fall of 2007
  • Could be out of IRC
  • Realignment issue goes away
  • Cost savings in materials, curriculum, and staff
    development
  • Title I services
  • Academic access
  • Minimizes special ed. programming concerns
  • Cons
  • Some current walkers need transportation
  • Estimate some cost
  • Cohasset students not in cohort

13
Option C Cost
  • EC/K Southwest - remodel 3 bathrooms in
    existing classrooms - 100,000
  • 1-2 Murphy
  • 3-4 Forest Lake
  • Total cost Option C -
    100,000

14
Academic Access
  • State is moving mandatory Algebra to 8th grade
  • A fifth year of World language has long been
    desirable for IB Diploma candidates
  • Increased elective offerings for 8th graders

15
Option D AD/ED with K-4 buildings 5th grade to
MS 8TH grade to HS
  • Pros
  • Start fall 2007
  • Limited remodeling
  • Academic access
  • Cons
  • Realignment issues continue

16
Option D Cost
  • Limited remodeling costs

17
Option E AD/ED - reopen Riverview for
additional 5 classroom need
  • Pros
  • District already owns
  • playground
  • Cons
  • Additional costs to bring building up to par
  • Additional support staff needed
  • Yearly maintenance costs
  • Determining what 5 classrooms would go into this
    building?

18
Option E Cost
  • Bring Riverview up to status as other elementary
    buildings - 1,500,000
  • Annual operating costs - 285,000
  • Total cost Option E - 1,785,000

19
Other Options (referendum required)
  • 1 large new elementary E-5
  • Approximate cost - 25,000,000
  • 2 new elementaries (north-south)
  • Approximate cost - 27,300,000

20
Another referendum option
  • Run an operating levy referendum
  • 500,000 to add 6-7 additional sections
  • AND
  • Run a building referendum to put additions on all
    the elementaries
  • 2,000,000 to add 11-12 classrooms

21
Critical considerations
  • Room for additional classrooms if monies to lower
    class sizes becomes available
  • Potential for growing enrollment

22