Title: OT Survey
1OT Survey Adjustment
06-03-2007
- Outline
- Survey technique at present
- what has been done and what there is to do
- issues to complete OT alignment before pilot run
- possible optimizations
- long-term maintainance
2Open Position
Modules
Bridge
C-frame OT
Cryo-Platform
Table Cable Trays
3C Frames
Distribution of cooling and gas
Front-End Electronics Boxes
Detector Modules
Distribution of LV,HV, ECS/TFC, etc.
4C-Frame Survey
Survey Points 2(X/U) x 2(T/B) x 9 Per point two
targets for position distance 1 day per C-frame
5C-Frame Adjustment
Long Beams (IPE 300)
Transversal Beams
C-Frame Rails
Wheeled Support, Alignment, and Stop-and-Lock
Blocks
6Survey Work
All data available at http//www.nikhef.nl/pub/ex
periments/bfys/lhcb/outerTracker/Installation/Surv
ey/Overview.html
7Achieved so far
8Problems to be solved
- Completion of OT alignment before pilot run
- Close OT or at least come into the region of the
alignment blocks - access magnet area for survey
- access top dowel pins for survey target
installation - access alignment mechanism to adjust C-Frame
position
- Maintain the OT alignment (long-term)
- access magnet area for survey
- access top dowel pins for survey target
installation - create possibility of survey from the A side
- A side survey point outside the detector
- C side survey point between A and C halves
9Optimize the survey targets
- Currently used
- gives good resolution in position and distance
- only one available (plus few spares)
- needs two accesses per dowel pin (distance and
position) - does not fit between two C-Frames
- Alternative 1
- gives acceptable resolution in position and
distance - can make 2 x 9
- needs one access per dowel pin
- does not fit between two C-Frames
- Alternative 2
- gives good resolution in position and distance
- can make many (432??)
- needs no access
- fits between two C-Frames
- needs two survey stations in the magnet
(triangulation)
10Reduce the number of survey points
- Completion of OT alignment before pilot run
- must have all points (2 x 2 x 9 per C-Frame)
- after adjustment can measure less points (1 x 2
x 5 per C-Frame)
- Maintain the OT alignment (long-term)
- can use a reduced set of points (1 x 2 x 5 per
C-Frame)
11Side Survey
- Target Alternative 3 (side view)
- gives good resolution in distance and acceptable
in position - can make 18
- needs one access per dowel pin
- does not fit between two C-Frames
- needs survey platforms to be made
- create possibility of survey from the A side
- A side survey point outside the detector
- C side survey point between A and C halves