OT Survey Adjustment
06-03-2007
  • Outline
  • Survey technique at present
  • what has been done and what there is to do
  • issues to complete OT alignment before pilot run
  • possible optimizations
  • long-term maintainance

2
Open Position
Modules
Bridge
C-frame OT
Cryo-Platform
Table Cable Trays
3
C Frames
Distribution of cooling and gas
Front-End Electronics Boxes
Detector Modules
Distribution of LV,HV, ECS/TFC, etc.
4
C-Frame Survey
Survey Points 2(X/U) x 2(T/B) x 9 Per point two
targets for position distance 1 day per C-frame
5
C-Frame Adjustment
Long Beams (IPE 300)
Transversal Beams
C-Frame Rails
Wheeled Support, Alignment, and Stop-and-Lock
Blocks
6
Survey Work
All data available at http//www.nikhef.nl/pub/ex
periments/bfys/lhcb/outerTracker/Installation/Surv
ey/Overview.html
7
Achieved so far
8
Problems to be solved
  • Completion of OT alignment before pilot run
  • Close OT or at least come into the region of the
    alignment blocks
  • access magnet area for survey
  • access top dowel pins for survey target
    installation
  • access alignment mechanism to adjust C-Frame
    position
  • Maintain the OT alignment (long-term)
  • access magnet area for survey
  • access top dowel pins for survey target
    installation
  • create possibility of survey from the A side
  • A side survey point outside the detector
  • C side survey point between A and C halves

9
Optimize the survey targets
  • Currently used
  • gives good resolution in position and distance
  • only one available (plus few spares)
  • needs two accesses per dowel pin (distance and
    position)
  • does not fit between two C-Frames
  • Alternative 1
  • gives acceptable resolution in position and
    distance
  • can make 2 x 9
  • needs one access per dowel pin
  • does not fit between two C-Frames
  • Alternative 2
  • gives good resolution in position and distance
  • can make many (432??)
  • needs no access
  • fits between two C-Frames
  • needs two survey stations in the magnet
    (triangulation)

10
Reduce the number of survey points
  • Completion of OT alignment before pilot run
  • must have all points (2 x 2 x 9 per C-Frame)
  • after adjustment can measure less points (1 x 2
    x 5 per C-Frame)
  • Maintain the OT alignment (long-term)
  • can use a reduced set of points (1 x 2 x 5 per
    C-Frame)

11
Side Survey
  • Target Alternative 3 (side view)
  • gives good resolution in distance and acceptable
    in position
  • can make 18
  • needs one access per dowel pin
  • does not fit between two C-Frames
  • needs survey platforms to be made
  • create possibility of survey from the A side
  • A side survey point outside the detector
  • C side survey point between A and C halves