Summary Mr. Rust Project STEP December 17, 2004 - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

Summary Mr. Rust Project STEP December 17, 2004

Description:

subway. Light rail. Roads. Distance. Costs. Lowest Cost use all roads $82.9 million. Highest Cost use all subways $811 million. Engineering Concepts. Design ... – PowerPoint PPT presentation

Number of Views:55
Avg rating:3.0/5.0
Slides: 9
Provided by: eng3
Category:

less

Transcript and Presenter's Notes

Title: Summary Mr. Rust Project STEP December 17, 2004


1
Summary Mr. RustProject STEPDecember 17,
2004
2
Design
Residential 1 (1.5,7.0)
Lake
Downtown (5.0,3.0)
Center (1.5,3.5)
Radius 1.0 miles
Industrial (6.5,2.4)
Residential 2 (5.2,2.0)
Airport (1.5,1.0)
(100,0)
(0,0)
(100,0)
Residential
Industrial
Downtown
Airport
3
Approval Ratings
4
Approval Ratings
  • Highest Rating
  • 75
  • Lowest Rating
  • 44.6

5
Costs
6
Costs
  • Lowest Cost use all roads
  • 82.9 million
  • Highest Cost use all subways
  • 811 million

7
Engineering Concepts
  • Design
  • Working with constraints
  • Multiple approaches
  • Iterative process
  • Problem solving
  • Written communication
  • Oral communication

8
Bus fix made, but only to Feb. 1 Transit agency
still considering cuts
  • Article in todays Enquirer
  • December 16, 2004
  • SORTA has proposed two solutions to their current
    budget problems
  • A fare increase effective Feb. 1.
  • Metro fares in Cincinnati would increase to a
    flat 1 (previously was 50-80 cents)
  • Cut bus service on Sundays