ITUT SG19 Activites Mobile telecommunication networks - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

ITUT SG19 Activites Mobile telecommunication networks

Description:

ITU-T SG19 Activites. Mobile telecommunication networks. Hideo KOMORI. Rapportuer of IMT&FWA ... Convergence of mobile and fixed networks ... – PowerPoint PPT presentation

Number of Views:144
Avg rating:3.0/5.0
Slides: 18
Provided by: Fuji186
Category:

less

Transcript and Presenter's Notes

Title: ITUT SG19 Activites Mobile telecommunication networks


1
ITU-T SG19 ActivitesMobile telecommunication
networks
Hideo KOMORI Rapportuer of IMTFWA Komori.hideo_at_jp
.fujitsu.com
2
ITU-T SG19
  • Responsible for studies relating to
  • Network aspects of mobile telecommunications
    networks
  • IMT-2000 and beyond
  • wireless Internet
  • Mobility management
  • Convergence of mobile and fixed networks
  • Lead study group on mobile telecommunication
    networks and for mobility

3
IMT-2000 Standards Framework
IMT-2000 Family
ITU-T(SG19), ITU-R(WP8F)
ARIB Association of Radio Industries and
Businesses ATIS Alliance for Telecommunications
Industry Solution CCSA China Communications
Standards Association ETSI European
Telecommunications Standards Institute TIA
Telecommunications Industry Association TTA
Telecommunications Technology Association TTC
Telecommunication Technology committee
4
ITU-T SG19 - Management Team
  • Chairman
  • Mr. John VISSER (Nortel Networks, Canada)
  • Vice Chairman
  • Mr. Maurice GHAZAL (MPT, Lebanon)
  • Mr. Kiritkumar P. LATHIA (Siemens Mobile, Italy)
  • Mr. Motoshi TAMURA (NTT DoCoMo, Japan)
  • Mr. Bruno RAMOS (ANATEL, Brazil)
  • Mr. Konstantin TROFIMOV (NIIR, Russia)
  • Mr. Young Kyun KIM (Samsung Electronics, Korea)
  • Mr. Patrick F. MASAMBU (Communications
    Commission, Uganda)

5
ITU-T SG19 Structure
SG 19 would not create Working Parties but would
simply have the five allocated Questions report
directly to the plenary.
  • Q1 Service and network capability
  • requirements and network architecture
  • Q2 Mobility management
  • Q3 Identification of existing and evolving
  • IMT-2000 systems
  • Q4Preparation of a handbook on IMT-2000
  • Q5Convergence of evolving IMT-2000
  • networks with evolving fixed networks

6
ITU-T SG19 Recommendations
Service and network architecture for Systems
Beyond IMT-2000
Long-term Vision
Capability
Architecture
Information Flow
Sup. 52
Q.MMR
Mobility management
Q.MM1
NNI MM Requirements
Q.MM2
Q.MMF
MM Framework
Q.MM3
FMC (Fixed Mobile Convergence)
Q.1761
Q.FMCstg2
Existing and evolving IMT-2000 Systems
Release4
Release5
Release6
Release7
Release99
Q.1741.1
Q.1741.2
Q.1741.3
Q.1741.4
Q.1741.5
3GPP
Q.1742.1
Q.1742.2
Q.1742.3
Q.1742.4
Q.1742.5
3GPP2
7/2003
1/2004
12/2004
12/2002
7
The 2nd ITU-T SG19 Meeting
  • Date 3-6 May 2005
  • Venue ITU Montbrillant, Geneva, Switzerland
  • Attendee 40 (15 Countries)
  • Documents
  • White Contribution 1
  • Delayed Contributions 11(7 from Asia Pacific
    region countries)
  • Temporary Documents 87

8
The 2nd SG19 meeting Executive Summary(1/2)
  • A draft Recommendation Q.FNAB Functional
    Network Architecture for Systems Beyond IMT-2000
    version 3.0 was produced. It was scheduled to
    complete by 4Q 2005.
  • The meeting agreed to introduce a new chapter
    Functional Information Flows into Q.MMF
    Mobility Management Framework and Functional
    Architecture for the Systems Beyond IMT-2000.
    The new version of Q.MMF was developed.
  • A new document Q.MMR Mobility Management
    Requirements for Systems Beyond IMT-2000 was
    introduced as a way to capture any new
    requirements. It was scheduled to complete by 1Q
    2006.

9
The 2nd SG19 meeting Executive Summary(2/2)
  • The meeting approved inputs of ARIB, ATIS, CCSA,
    ETSI and TTC for draft new Recommendation IMT
    2000 References to Release 6 of GSM evolved UMTS
    Core Network. It was scheduled to propose for
    AAP Consent at the 3rd SG19 meeting.
  • The meeting clarified that the scope for Fixed
    Mobile Convergence in draft new Recommendation
    Q.FMC stage 2 is limited to the use of wired and
    wireless access technologies in conjunction with
    IMS-based Core Networks.

10
The 3rd ITU-T SG19 Meeting
  • Date 5-9 September 2005
  • Venue ITU Montbrillant, Geneva, Switzerland
  • Attendee 40 (20 countries)
  • Documents
  • Delayed Contributions 12(8 from Asia Pacific
    region countries)
  • Temporary Documents 68

11
Approval of Draft Recommendation
  • The following Recommendation was consented for
    AAP (Alternative Approval Process) in accordance
    with the rules of Recommendation A.8
  • Q.1741.4 IMT 2000 References to Release 6 of
    GSM evolved UMTS Core Network

12
Key Results of Q.1
  • Q.1 Service and network capability requirements
    and network architecture
  • Key results
  • The meeting agreed to support moving network
    function on the Systems Beyond IMT-2000 based on
    the contributions and discussions at the meeting.
  • The draft Recommendation Q.FNAB version 4.0 was
    developed to include the above function and other
    modification.
  • Its completion date is postponed from 4Q 2005 to
    3Q 2006 because the current draft is not mature
    for proposed to AAP Consent at next SG19 meeting.

13
Key Results of Q.2
  • Q2 Mobility management
  • Key result
  • The draft Q.MMR was enhanced in the areas of
    mobility management features and the requirements
    for inter-CN and inter-AN and intra-AN mobility
    management. A requirement was added on support of
    private IP address domains. Mobility definitions
    have been harmonized with Q.6/13.
  • The draft Q.MMF was enhanced in the areas of
    Location Update, Registration, Query and Reply. A
    new section was added on Paging Management.

14
Key Results of Q.3
  • Q.3 Identification of existing and evolving
  • IMT-2000 systems
  • Key result
  • A draft new Recommendation entitled IMT 2000
    References to Release 6 of GSM evolved UMTS Core
    Network was consented for AAP as a ITU-T
    Recommendation Q.1741.4.
  • The following new draft Recommendations is planed
    to be proposed for AAP Consent in the next SG19
    meeting to be held 23-27 January 2006.
  • Q.1742.5 IMT 2000 References (approved as of 30
    June 2005) to ANSI-41 evolved Core Network with
    cdma2000 Access Network

15
Key Results of Q.4
  • Q.4Preparation of a handbook on IMT-2000
  • Key result
  • The meeting reviewed input contribution and
    agreed to introduce a new chapter on emergency
    communications into the second Edition of
    Handbook on IMT-2000.
  • The completion of the second edition of Handbook
    is scheduled for 2Q2006.

16
Key Results of Q.5
  • Q5Convergence of evolving IMT-2000
  • networks with evolving fixed networks
  • Key result
  • The draft Q.FMC stage 2 was extended with new
    sections on high level principles and support for
    Voice Call Continuity. An annex was added that
    provides an Enterprise Role Model as the basis
    for identification of the prime inter-domain
    interfaces for FMC.
  • The mobility management and FMC related sections
    of the 8th FG NGN meeting output documents were
    reviewed. The meeting agreed to send a liaison
    response to the FG NGN.

17
Future meeting
  • SG19
  • 23-27 January 2006 in Geneva
  • Q1/19
  • Electronic meeting 8 - 22 November 2005
  • Terms of Reference to progress the work on Q.FNAB
Write a Comment
User Comments (0)
About PowerShow.com