Title: Energy and Environemntal Alert 25' 5' 2006
1Energy and Environemntal Alert - 25. 5.
2006 Monika Pribylová
2Presentation Structure
- Areas of regulation harmonization with EU
legislation - Start up of activities in the CR project
preparation related env. requirements - Regulation of commercial activities (small
polluters) - Air, water, waste, energy
- Support tools EMS, Eco-label
- Regulation of production activities
- IPPC
- Media based regulation
- Env. reporting
- New/expected legislation
3Areas of environmental regulation
Land use Nature protection NATURA
Waste management Contaminated land
EMS EIA Environmental Reporting IPPC
Energy Efficiency Air pollution Emissions
Trading Noise
Water pollution Dangerous substances management
Accident prevention
4Project preparation related env. requirements
3 stages procedure
Construction permit
5Env. requirements in land use permit
- compliance with local land use plan
- relevant policies/plans (air emission
minimisation plan, regional waste management
plan) - EIA, EIA statement (act no.100/2001 Coll.
ammended by 93/2004 Coll.) - category I. (always full EIA) - public hearing
- category II (screening env. authority decide on
need for EIA) - Authorised persons for EIA
- NATURA 2000 European network of protected areas
and species - - bird areas - 9 of the CR area
- - other species protected areas 8 of the CR
area
6Env. requirements in land use permit cont.
NATURA 2000
- Act no. 218/2004 Coll.,
- Requirement to assess impact of any intention
(project) or plan if potential significant impact - NATURA statement part of EIA
- In case there is identified impact or its not
possible to exclude significant impact - EIA is
needed, even if not listed in EIA legislation
7www.natura2000.cz
8Env. requirements in construction permit
Examples
- IPPC permit for large polluters incl. heavy
industry, landfills, food industry, farms - Permit for construction of air pollution sources
based on categorisation division Small - lt 0,2
MW, Medium - 0,2 MW - 5 MW, Large 5 MW 50
MW, Extra large gt 50 MW - requirements on elimination of dust during
construction - Water intake, waste water release statement from
River basins (in case of direct intake/release)
or Water management authority - Noise requirements during construction and
operation
9Env. requirements in operational permit
Examples
- Air pollution permit, operational rules for
extra large sources of air pollution, monitoring
after testing operation - Water pollution permit in case of direct release
to river or in case of presence of hazardous
substances in waste water, - Accident prevention plan for water protection
- Waste management plan
- Accident prevention plan (depends on type and
scope of used chemicals) - Noise study upon stabilisation of operations
10Regulation of commercial activities
- Air pollution requirements regulation of
boilers gt 50kW small source of air pollution
authorised emission measurement 1x2 years
(possibility for exception), fees 500 5000
CZK/year - Water in case of municipal water and waster
water system fees are agreed in the contract
with Vodovody a kanalizace company. - Construction companies - required to ensure water
supply and discharge, prevent/eliminate pollution
of discharge - Waste management hierarchy requirements
prevent, reuse, recycle, dispose in practice
participation in municipal waste management
system (fees), sorting of plastic, paper, glass
free of charge, hazardous and high volume waste
special waste collection places.
11Regulation of commercial activities
- Take-back of selected products
- electronic and electric waste - from 13.8.2005
the producer/importer/ distributor - 60 days to
apply for registration on the Register (MoE) and
to cooperate with respect to the financing of
WEEE - annual report about fulfilling the obligation -
collection, treatment and disposal of WEEE
individually or together with another
producer/distributor or in a joint scheme - (SMEs using PCs are treated households waste
collection place or exchange on shop) - Oils, el. accumulators, batteries, tires
12Support environmental tools
- EMAS/EMS ISO 14000 register of environmental
aspects, continuous improvement - Eco-label national and EU
- Product categories e.g. Textile, PC/NB,
- Tourist accommodation (hotels), camps
- Eco-label criteria stimulation for savings on
energy, water, waste, air fees and add care value
for guests
13Where you get information?
- advice from
- the Czech Competent Body
- www.ekoznacka.cz
- From Websites
- www.europa.eu.int/ecolabel
- www.eco-label-tourism.com
- From infomaterial
- brochures, fact sheets
14Regulation of industry - IPPC system
- EC Directive 96/61/EC, Integrated Pollution
Prevention and Control , in CR Act no. 76/2002
Coll. - 750 companies/plants in the CR
- requirements to obtain integrated permit
- - for new activities or reconstruction since
2003 - - for existing activities till 30.10. 2007
- Scope air, water, waste, noise, energy
efficiency, BAT, accident prevention, monitoring,
decommissioning
15Motivation for energy efficiency increase
Air protection
Monitoring Targeting
Climate protection
IPPC
Competitive ability
16Positive Aspects of IPPC
- Financial benefits Minimising the use of
energy, water materials and the production of
waste will deliver cost savings. - Health and safety Switching to less harmful raw
materials improves working environments. - Environment - Reduced emissions will improve the
quality of habitats and living space, often
occupied by site workers, in the surrounding
area. - Reduced liabilities Good environmental
management will reduce the potential for legal
action and increase attraction to investors. - Improved stakeholder relationships Better
environmental performance can improve
relationships with regulators and the local
community, and encourage buy-in by site
employees.
17Key Elements of a PPC Application
Process Description
B A T
Inventory of Emissions
Resource efficiency Accident preventionEMS
Environmental Impact Assessment
Confirm BAT for Significant Impacts
Demonstration of Compliance
18Regulation of industry media approach
- Air protection requirements for large, medium
and small sources of air pollution, compliance
with ELVs, monitoring, reporting, fees - Water discharge requirements based on
characteristics of waste water (requirements for
pre-treatment and WWT, ELV), accident plan,
monitoring, reporting - Waste treatment permit, waste management plan,
waste reporting - Energy audit
- Noise measurements compliance with limit values
- Odour requirements
19Integrated Pollution Register
- Based on EC decision on EPER, E-PRTR
- Integration of media based registers (water, air,
waste) - Government decision no. 368/2003 Coll. sets
- - list of 72/88 pollutants, which are
reported on one form to one register - - reporting thresholds
- 1st reporting period 2004
- www.irz.cz
20New legislation - EPBDirective
- Act no. 177/2006 Coll. (amendment of the energy
management act no. 406/2000 Coll.)
transposition of directive 2002/91/ES - Secondary legislation under preparation
- New requirements for energy certification of
buildings (new and existing) - Energy performance certificate since 1.1.2009
for - - all new buildings,
- - major reconstructions over 1000 m2,
- - all public buildings
21Contact Monika Pribylová Enviros
s.r.o. mpribylova_at_enviros.cz tel 284 007