Energy and Environemntal Alert 25' 5' 2006 - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

Energy and Environemntal Alert 25' 5' 2006

Description:

Areas of regulation harmonization with EU legislation ... in case of municipal water and waster water system fees are agreed in the ... – PowerPoint PPT presentation

Number of Views:53
Avg rating:3.0/5.0
Slides: 22
Provided by: andream51
Category:

less

Transcript and Presenter's Notes

Title: Energy and Environemntal Alert 25' 5' 2006


1
Energy and Environemntal Alert - 25. 5.
2006 Monika Pribylová
2
Presentation Structure
  • Areas of regulation harmonization with EU
    legislation
  • Start up of activities in the CR project
    preparation related env. requirements
  • Regulation of commercial activities (small
    polluters)
  • Air, water, waste, energy
  • Support tools EMS, Eco-label
  • Regulation of production activities
  • IPPC
  • Media based regulation
  • Env. reporting
  • New/expected legislation

3
Areas of environmental regulation

Land use Nature protection NATURA
Waste management Contaminated land
EMS EIA Environmental Reporting IPPC
Energy Efficiency Air pollution Emissions
Trading Noise
Water pollution Dangerous substances management
Accident prevention
4
Project preparation related env. requirements
3 stages procedure
Construction permit
5
Env. requirements in land use permit
  • compliance with local land use plan
  • relevant policies/plans (air emission
    minimisation plan, regional waste management
    plan)
  • EIA, EIA statement (act no.100/2001 Coll.
    ammended by 93/2004 Coll.)
  • category I. (always full EIA) - public hearing
  • category II (screening env. authority decide on
    need for EIA)
  • Authorised persons for EIA
  • NATURA 2000 European network of protected areas
    and species
  • - bird areas - 9 of the CR area
  • - other species protected areas 8 of the CR
    area

6
Env. requirements in land use permit cont.
NATURA 2000
  • Act no. 218/2004 Coll.,
  • Requirement to assess impact of any intention
    (project) or plan if potential significant impact
  • NATURA statement part of EIA
  • In case there is identified impact or its not
    possible to exclude significant impact - EIA is
    needed, even if not listed in EIA legislation

7
www.natura2000.cz
8
Env. requirements in construction permit
Examples
  • IPPC permit for large polluters incl. heavy
    industry, landfills, food industry, farms
  • Permit for construction of air pollution sources
    based on categorisation division Small - lt 0,2
    MW, Medium - 0,2 MW - 5 MW, Large 5 MW 50
    MW, Extra large gt 50 MW
  • requirements on elimination of dust during
    construction
  • Water intake, waste water release statement from
    River basins (in case of direct intake/release)
    or Water management authority
  • Noise requirements during construction and
    operation

9
Env. requirements in operational permit
Examples
  • Air pollution permit, operational rules for
    extra large sources of air pollution, monitoring
    after testing operation
  • Water pollution permit in case of direct release
    to river or in case of presence of hazardous
    substances in waste water,
  • Accident prevention plan for water protection
  • Waste management plan
  • Accident prevention plan (depends on type and
    scope of used chemicals)
  • Noise study upon stabilisation of operations

10
Regulation of commercial activities
  • Air pollution requirements regulation of
    boilers gt 50kW small source of air pollution
    authorised emission measurement 1x2 years
    (possibility for exception), fees 500 5000
    CZK/year
  • Water in case of municipal water and waster
    water system fees are agreed in the contract
    with Vodovody a kanalizace company.
  • Construction companies - required to ensure water
    supply and discharge, prevent/eliminate pollution
    of discharge
  • Waste management hierarchy requirements
    prevent, reuse, recycle, dispose in practice
    participation in municipal waste management
    system (fees), sorting of plastic, paper, glass
    free of charge, hazardous and high volume waste
    special waste collection places.

11
Regulation of commercial activities
  • Take-back of selected products
  • electronic and electric waste - from 13.8.2005
    the producer/importer/ distributor - 60 days to
    apply for registration on the Register (MoE) and
    to cooperate with respect to the financing of
    WEEE
  • annual report about fulfilling the obligation -
    collection, treatment and disposal of WEEE
    individually or together with another
    producer/distributor or in a joint scheme
  • (SMEs using PCs are treated households waste
    collection place or exchange on shop)
  • Oils, el. accumulators, batteries, tires

12
Support environmental tools
  • EMAS/EMS ISO 14000 register of environmental
    aspects, continuous improvement
  • Eco-label national and EU
  • Product categories e.g. Textile, PC/NB,
  • Tourist accommodation (hotels), camps
  • Eco-label criteria stimulation for savings on
    energy, water, waste, air fees and add care value
    for guests

13
Where you get information?
  • advice from
  • the Czech Competent Body
  • www.ekoznacka.cz
  • From Websites
  • www.europa.eu.int/ecolabel
  • www.eco-label-tourism.com
  • From infomaterial
  • brochures, fact sheets

14
Regulation of industry - IPPC system
  • EC Directive 96/61/EC, Integrated Pollution
    Prevention and Control , in CR Act no. 76/2002
    Coll.
  • 750 companies/plants in the CR
  • requirements to obtain integrated permit
  • - for new activities or reconstruction since
    2003
  • - for existing activities till 30.10. 2007
  • Scope air, water, waste, noise, energy
    efficiency, BAT, accident prevention, monitoring,
    decommissioning

15
Motivation for energy efficiency increase
Air protection
Monitoring Targeting
Climate protection
IPPC
Competitive ability
16
Positive Aspects of IPPC
  • Financial benefits Minimising the use of
    energy, water materials and the production of
    waste will deliver cost savings.
  • Health and safety Switching to less harmful raw
    materials improves working environments.
  • Environment - Reduced emissions will improve the
    quality of habitats and living space, often
    occupied by site workers, in the surrounding
    area.
  • Reduced liabilities Good environmental
    management will reduce the potential for legal
    action and increase attraction to investors.
  • Improved stakeholder relationships Better
    environmental performance can improve
    relationships with regulators and the local
    community, and encourage buy-in by site
    employees.

17
Key Elements of a PPC Application
Process Description
B A T
Inventory of Emissions
Resource efficiency Accident preventionEMS
Environmental Impact Assessment
Confirm BAT for Significant Impacts
Demonstration of Compliance
18
Regulation of industry media approach
  • Air protection requirements for large, medium
    and small sources of air pollution, compliance
    with ELVs, monitoring, reporting, fees
  • Water discharge requirements based on
    characteristics of waste water (requirements for
    pre-treatment and WWT, ELV), accident plan,
    monitoring, reporting
  • Waste treatment permit, waste management plan,
    waste reporting
  • Energy audit
  • Noise measurements compliance with limit values
  • Odour requirements

19
Integrated Pollution Register
  • Based on EC decision on EPER, E-PRTR
  • Integration of media based registers (water, air,
    waste)
  • Government decision no. 368/2003 Coll. sets
  • - list of 72/88 pollutants, which are
    reported on one form to one register
  • - reporting thresholds
  • 1st reporting period 2004
  • www.irz.cz

20
New legislation - EPBDirective
  • Act no. 177/2006 Coll. (amendment of the energy
    management act no. 406/2000 Coll.)
    transposition of directive 2002/91/ES
  • Secondary legislation under preparation
  • New requirements for energy certification of
    buildings (new and existing)
  • Energy performance certificate since 1.1.2009
    for
  • - all new buildings,
  • - major reconstructions over 1000 m2,
  • - all public buildings

21
Contact Monika Pribylová Enviros
s.r.o. mpribylova_at_enviros.cz tel 284 007
499 www.enviros.cz