Earthmoving Evaluation - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

Earthmoving Evaluation

Description:

Investigate mature products that incorporate GPS and/or laser technology to ... Investigation of Tow behind scrapers. Product. Description ... – PowerPoint PPT presentation

Number of Views:53
Avg rating:3.0/5.0
Slides: 7
Provided by: travi8
Category:

less

Transcript and Presenter's Notes

Title: Earthmoving Evaluation


1
Evaluation of Earthmoving Technology
Travis A. Mann Airfields and Pavements
Branch Geotechnical and Structures Laboratory
FY03 FY04 232K 100K
2
Project Description
  • Objective
  • Determine the requirements for an enhanced
    earthmoving system that will meet contingency
    airfield construction efficiency goals by
    evaluating available systems under realistic
    airfield construction conditions.
  • Scope
  • Investigate mature products that incorporate GPS
    and/or laser technology to provide survey/grade
    control during airfield construction projects.

3
Plan/Progress/Approach
  • Tasks
  • Evaluate Enhanced Earthmoving Systems
  • Productivity
  • Accuracy
  • Manpower Requirements
  • Situational Awareness
  • Determine Accuracy Requirements for Contingency
    Airfield Construction
  • New Construction
  • Repair/Upgrade
  • Ensure System/Software Compatibility
  • Site Selection
  • Design

4
Plan/Progress/Approach
  • Currently Available Systems
  • Caterpillars Computer Aided Earthmoving System
    (CAES) (Mar-Apr 01)
  • Trimbles Site Vision GPS (Oct-Dec 02)
  • Trimbles Blade Pro 3-D (Oct-Dec 02)
  • Topcons 3D-GPS (FY04)

5
Plan/Progress/Approach
  • Additional Efforts
  • Visit to Caterpillar to view upgrades and changes
    to the Computer Aided Earthmoving System (CAES)
  • Purchase of Trimble RTK GPS Reference Station
    with Site Calibration Kit
  • Investigation of Tow behind scrapers

6
Product
  • Description
  • Prioritized list of proposed system requirements
    with specifications
  • Written documentation of each systems evaluation
  • Connectivity to other Work Units
  • Receives information from Site Selection and
    Design processes
  • Transition Medium
  • Input for Operational Requirements Document(s)
    (ORD)
  • Evaluation reports
Write a Comment
User Comments (0)
About PowerShow.com