Title: Accelerator Support


1
Accelerator Support
  • Engineering and Fabrication Department Meeting
  • 28 January 2003

2
Proton Source (current)
  • Booster pulsed extraction septum
  • One done
  • Balance in production
  • 400 MeV Lambertson
  • Done
  • EDWA dipoles
  • Done
  • Gradient magnet measurements
  • Starting up after waiting for power

3
Proton Source (future)
  • Injection ORBUMPS
  • Undefined, speculative
  • Extraction Dog Legs
  • Undefined, speculative
  • Air core trims
  • Undefined, speculative

4
Main Injector (1)
  • Additional spare quadrupoles (IQC, IQD)
  • Core stacking done
  • Coil winding going well
  • Still refining potting tooling, process
  • New glass tape vendor
  • Quadrupole rebuilding (IQB, IQD)
  • Will do after new IQC, IQD magnets
  • Refurbish B2 into BDM
  • Will do with related NuMI work

5
Main Injector (2)
  • QXR
  • Installed
  • Vertical trim dipoles
  • Procurement
  • Trim quadrupoles from MRTI
  • Prototype tested
  • Balance due in spring
  • Spare Main Injector Lambertsons
  • Deferred, but may do a little as fill-in work
  • 7.5 MHz RF cavity
  • Deferred

6
Recycler
  • New trim quads from MRTI
  • As for Main Injector
  • Flying wire system
  • Installed
  • Windowless vacuum system
  • Installed

7
P-Bar Source (magnets)
  • MDCF rebuild
  • Done except for shimming, water hoses
  • Spare sextupole magnets
  • Paperwork
  • Trim dipole magnets
  • Paperwork

8
P-Bar Source (aperture)
  • AP2/Debuncher aperture definition
  • Under way
  • Debuncher quad magnet mover
  • Just started thinking
  • Stochastic cooling tank design
  • On hold

9
Tevatron (spare magnets)
  • Spool evaluation, repairs
  • On going, low profile
  • Dipole evaluation, repairs
  • On going, low profile
  • Quad evaluation, repairs
  • On going, low profile

10
Tevatron (new upgraded magnets)
  • Corrector lead upgrades (conning towers)
  • On hold in tunnel
  • Torlon issues need resolution
  • High temperature lead spools
  • Prototype two more done
  • Balance deferred
  • Ionization profile monitor magnets
  • Early discussions with BD/Instrumentation

11
Tevatron (other)
  • Kicker PFLs (Pulse Forming Lines)
  • Half done, on hold
  • Cheap choke rebuild
  • Done
  • Electrostatic separators
  • Done, except conditioning deferred
  • RF structure analysis
  • On going
  • Add heaters to IDx beam tubes
  • Installed

12
NuMI (refurbishing)
  • B2 Dipoles more magnets new water, power
    connections
  • Magnets from tunnel this shutdown
  • Parts in hand
  • 3Q120 quadrupoles more magnets
  • Magnets from tunnel this shutdown
  • 200-turn bump magnets new need
  • Magnets from tunnel this shutdown

13
NuMI (new construction)
  • Trim dipoles more magnets new specs
  • Parts in hand for modifications
  • Procurement for new construction
  • Extraction kicker magnets
  • BD completing engineering
  • Not clear whether they still want us to do this

14
Shutdown assistance
  • Huge crew distributed around the rings working on
    a variety of projects, including supervision and
    inspection