Collaborative Projects - PowerPoint PPT Presentation

1 / 1
About This Presentation
Title:

Collaborative Projects

Description:

Midwest Coalition for Comprehensive Design Education: Purdue University, Butler ... Left Rear Wheel, Right Rear Wheel, Rear Axle and Brake System ... – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 2
Provided by: gran108
Category:

less

Transcript and Presenter's Notes

Title: Collaborative Projects


1
Collaborative Projects
The Cart Project
  • The Projects
  • The projects are developed in a collaborative
    environment
  • Completed projects
  • The Drill Project
  • Radio Flyer project
  • Guitar project
  • Future project
  • The Cart project
  • The Cart Project
  • The cart is divided into five sub assemblies
    according to functionality.
  • Left Front Wheel, Right Front Wheel, Steering
    Wheel and Driver
  • Left Rear Wheel, Right Rear Wheel, Rear Axle and
    Brake System
  • Engine, Exhaust Pipe, (Gear Box) and Fuel Tank
  • Chassis, Floor, Front End, Rear End and Pedals
  • Roll Cage and Seat
  • This shows the force applied on the four wheels
    of the kart when it met obstacles of different
    height.
  • Reverse Engineering of a Drill
  • Product 3/8" 7.2V Cordless Drill, KRAFT tech,
    type CDP02CN-1
  • Three subassemblies were modeled
  • Switch and batteries - Solid Works
  • Power train UGS NX
  • Housing CATIA

An Example of Dynamic Analysis (ADAMS) The
simulation of what is happening during the ride
in between the cart and different sized obstacles
Step 1 Work Separately with Mutual Communication
2
1
3
Future Research Platform
5
4
  • Structure Analysis with FEA method (the impact on
    driver in crash the strength testing of key
    components)
  • Mechanism and Dynamic Analysis (the force applied
    on tire in different road condition driver
    comfort related to the vibration)
  • Maintenance Analysis (reliability of key parts)
  • Manufacturability Analysis (Improve the part
    design from the perspective of manufacturing)
  • Mechatronics and control system (speed meter or
    monitor of other performance indexer engine
    speed control with microprocessor solar cell
    instead of gas engine )

Step 2 Assemble
Step 3Manufacturing
  • The final assembly has been made in Solid Works
    , UGS and CATIA. STEP neutral exchange format has
    been used for data exchange. IGES data exchange
    format created some errors in geometry
    conversion. The housing has been manufacturing
    by using rapid prototyping.
Write a Comment
User Comments (0)
About PowerShow.com