ARR - PowerPoint PPT Presentation

About This Presentation
Title:

ARR

Description:

GRIDCO proposes a sum of Rs.677.01 crore to be passed on to tariff under this ... Commission need not consider the ROE of Rs. 60.62 crore as proposed by the licensee. ... – PowerPoint PPT presentation

Number of Views:203
Avg rating:3.0/5.0
Slides: 26
Provided by: MSP46
Learn more at: https://www.orierc.org
Category:
Tags: arr | crore

less

Transcript and Presenter's Notes

Title: ARR


1
ORISSA ELECTRICITY REGULATORY COMMISSION
Together, let us light up our lives.
  • ARR Price Proposal
  • of
  • GRIDCO For FY 2007-08 and Views of
    Stakeholders
  • February 15, 2007

2
  • GRIDCOs
  • ARR PRICE APPLICATION
  • FOR
  • FY 2007-08

3
Demand for and Sale of Power
  • GRIDCO has filed ARR Price application for
    2007-08 for its bulk supply activity.
  • GRIDCO and DISTCOs have furnished the following
    projections regarding demand and sale of power

Avg. of the
GRIDCO's
OERC
DISTCOs'
Actual from
Projection
Item
Approval
Projection
4/06 to 10/06
2006-07
2007-08
2007-08
SMD (MVA)
2226.76
3193.88
2400.00
2290.95
Sale to DISTCOs (MU)
14683.00
17549.30
16000.00
8674.65
120.00
Sale to CGPs (MU)
10.00
1.15
-
-
-
Export (MU)
Total Sale (DISTCOs
14803.00
16010.00
8675.80
CGP) (MU)
4
Distco-wise Demand for and Sale of Power
  • Distco-wise breakup of demand for and sale of
    power as projected by Distcos and Gridco are
    furnished in the table below

SMD (MVA) SMD (MVA) Sale to DISTCOs (MU) Sale to DISTCOs (MU)
Distcos Projection Gridcos Projection Distcos Projection Gridcos Projection
CESU 962.00 791.12 5225.00 5060.00
NESCO 768.00 588.14 5119.00 4110.00
WESCO 1142.54 716.86 5300.06 4925.00
SOUTHCO 321.34 303.88 1905.25 1905.00
All Distcos 3193.88 2400.00 17549.31 16000.00
  • Discrepancies between Gridcos and Distcos
    projections may be explained.

5
Transmission Loss and Power Procurement
  • GRIDCO projects transmission loss of 5.00 for
    2007-08 based on first six months of 2006-07.
  • A total energy procurement of 16,852.63 MU for
    the ensuing year has been considered.
  • 16801.22 MU shall be drawn from both State and
    Central generators.
  • The shortfall of 51.41 MU shall be met from
    outside the State _at_ 600 P/U.
  • Total power purchase and the costs thereof have
    been projected as follows

Year OERC Approval (2006-07) Actual from 4/06 to 10/06 GRIDCOs Proposal (2007-08)
Power Purchase (MU) 15414.79 9554.03 16801.22
Power Purchase Costs (Rs. Crore) 1756.84 1054.24 2164.46
6
Revenue Requirement, 2007-08
  • GRIDCOs proposal of Revenue Requirement for
    2007-08 along with those of approved ones for
    2006-07 are presented in the table below

(Rs. Crore)
Item OERC Approval 2006-07 GRIDCOs Projection 2007-08
A. Power Purchase Cost 1756.84 2164.46
B. Uncovered Expenses 480.12 677.01
Proposal for pass through of past losses towards repayment of principal 480.12 497.49
Arrear fixed cost charges of TTPS after adjustment of Tariff revision of TSTPS FSTPS 103.93
NTPCs claim towards arrear Income tax 26.28
Amount paid/payable to OPGC during 2006-07 39.36
Differential Fixed Costs of TTPS for 2006-07 (Rs195.01 cr revised Fixed Costs minus Rs185.06 cr as approved by OERC) 9.95
C. Total of other expenses ( Interest, Employee, AG Cost etc.) 209.06 187.16
Interest Cost 204.34 180.72
Other Cost (Employee, AG Cost etc.) 4.72 6.44
D. Return on Equity - 60.62
Total Revenue Requirement (A B C D) 2446.02 3089.25
  • Clarification may be given whether GRIDCOs
    Projection of Power Purchase Cost at Rs. 2164.46
    cr includes export figures. Further ROE of Rs
    60.62 cr is claimed in the absence of equity base.

7
Pass through of past losses and uncovered
expenses
  • The accumulated loss of GRIDCO as on 31.03.2006
    stands at Rs1002.20 Cr as per audited balance
    sheet.
  • GRIDCO proposes a sum of Rs.677.01 crore to be
    passed on to tariff under this head during
    2007-08.

Rs. Crore
Sl. No.
GRIDCOs Proposal
Item
1
Proposal for pass through of past losses towards
repayment of principal
497.49
2
Arrear fixed cost charges of TTPS after
adjustment of Tariff revision of TSTPS FSTPS
103.93
3
NTPCs claim towards arrear Income Tax
26.28
Amount paid / payable to OPGC during 2006-07
4
39.36
Dirrerential Fixed Costs of TTPS for 2006-07 (Rs
195.01 cr revised fixed Costs minus Rs. 185.06
cr as approved by OERC
5
9.95
TOTAL
677.01
8
Other Expenses
  • GRIDCOs proposal relating to interest and
    establishment costs are presented in the table
    below

Rs. Crore
GRIDCO's
Sl.
Particulars
Proposal for
No.
2007-08
1
Interest Cost
180.72
Other Costs
2
a
Employee Cost
3.09
b
2.03
AG Cost
c
ERLDC, NLDC fees and SLDC
1.32
Scheduling Charges
Sub-Total - Other Costs
6.44
Total (12)
187.16
9
Expected Revenue from Charges, 2007- 08
  • GRIDCOs proposal for net total revenue receipts
    for 2007-08 at the existing rates (along with the
    approved figures for 2006-07) are presented in
    the table below

(Rs. Crore)
GRIDCO's
OERC Approval
Proposal
Item
(2006-07)
(2007-08)
1. Revenue from Demand Charges
534.42
864.00
2. Revenue from Energy Charges
1240.02
2221.95
3. Misc. Other Receipts
167.06
3.30
- Sale to CGPs
36.96
3.30
- Export
-
-
- Unscheduled Interchange
-
-
- Receivable from DISTCOs
110.10
-
- Receivable from outside States
20.00
-
4. Net Total Receipts (12-3)
1941.50
3089.25
10
Tariff Proposal, 2007-08
  • GRIDCOs proposal for demand and energy charges
    for 2007-08 are presented in the table below

Year Demand Charges (Rs/ KVA) GRIDCOs Proposal for Energy Charges (P/U)
2007-08 300 138.87
Average Energy Charge 192.87
Rise over current average energy charge_at_120.88 P/U 59.56
11
Views of Stakeholders
12
Views of Stakeholders
  • Legal Issues
  • The ARR application filed by GRIDCO for
    determination of price is not tenable as the
    Commission has no authority under law and more
    particularity u/s 62 of E. Act. 03, to determine
    tariff on the application of a non-licensee i.e.
    GRIDCO.
  • Functioning of GRIDCO as trading company/
    licensee is unnecessary that too in the absence
    of competition.
  • Notice so published inviting objections does not
    conform to the requirements.
  • The procedure/method adopted by the Commission
    should be made simple and inexpensive to enable
    the public to participate.
  • The Commission may kindly examine whether the
    licensee has complied with the directions,
    conditions of licensee etc. issued by the
    Commission?

13
Views of Stakeholders
  • Energy Availability
  • Some stakeholders put the total power
    availability at 18,815 MU as compared to 16,801
    MU projected by GRIDCO.
  • It is pointed out that GRIDCO has not
    independently assessed the availability of hydro
    power for 2007-08, but has merely accepted the
    figure submitted by OHPC based on design
    energy.
  • Availability of power from hydel stations should
    be considered on the basis of the reservoir
    levels of the stations in the current year and
    their generation performance levels in the first
    seven months of FY 07.

14
Views of Stakeholders
  • Energy Availability Cont
  • Some stakeholders have taken into account the
    design energy of the hydel plants, their
    performances in the earlier years and the
    reservoir levels on the 1st day of October 2006
    for computing hydro power availability.
  • They submit that the availability of power from
    State hydro stations would be 7128 MU in FY 08 as
    against GRIDCOs proposal of 5856 MU.
  • GRIDCO should schedule for higher capacity
    availability from OHPC through suitable
    incentives.
  • Some estimate the availability from CGPs at 630
    MU as against GRIDCOs proposal of 540 MU.

15
Views of Stakeholders .. Contd.
  • Demand Energy Requirement
  • OERC should scrutinize the projections given by
    DISTCOs and GRIDCO and arrive at actual
    requirement of power and approve the same.
  • One objector has agreed to the DISTCOs
    projection of SMD and energy requirement as
    opposed to those projected by GRIDCO.
  • The quantum of energy estimated by GRIDCO for
    sale to Distcos may not be considered as the
    Distcos have submitted their requirement in their
    respective ARR. The drawl of energy submitted by
    the Distcos may be considered.

16
Views of Stakeholders .. Contd.
  • Demand Energy Requirement Cont
  • There would be surplus of energy during 2007-08
    to the extent of 213 MU (as against a deficit
    projection of 51.41 MU by GRIDCO) which may be
    sold through UI at the peak hours.
  • For Simultaneous Maximum Demand, OERC may accept
    GRIDCOs figure as DISTCOs figures can not be
    correct.
  • The average SMD as proposed by NESCO, WESCO
    SOUTHCO are 673 MVA, 950 MVA and 300 MVA
    respectively and the same may be taken for
    computation of Revenue of GRIDCO.

17
Views of Stakeholders .. Contd
  • Transmission Losses
  • Most objectors are critical of GRIDCOs
    projection of transmission loss at 5.
  • The Licensee has miserably failed to arrest the
    high transmission loss.
  • The average transmission loss in the OPTCL system
    has been taken as 5 which contradicts the
    recommendations of the High Power Committee.
  • The method of transmission loss computation
    adopted by GRIDCO is not acceptable to the three
    reliance companies.
  • GRIDCO should examine with OPTCL and determine
    the sections of transmission lines where higher
    transmission loss is occurring.

18
Views of Stakeholders .. Contd.
  • Pass Through of Past Losses Uncovered Expenses
  • All losses of erstwhile OSEB and subsequently of
    GRIDCO from retail sale were kept in GRIDCOs
    book and distribution privatized with zero loss.
  • Past losses now suggested to be passed on to the
    consumers, are due to un-prudent expenditure by
    GRIDCO which was in excess of the amount approved
    by OERC.
  • GRIDCO has also requested for pass through of all
    the past losses to the extent of repayment of
    loans and liabilities which the Commission may
    examine.

19
Views of Stakeholders .. Contd.
  • Pass Through of Past Losses Uncovered Expenses
    Cont
  • Past losses are mostly on account of the
    licensees inefficient operation and are,
    therefore, not payable.
  • GRIDCO should pray for a central subsidy to wash
    off all past losses. Incidentally a major part of
    these losses went as gains to central generating
    companies.
  • The Commission should reject treatment of past
    loss and direct GRIDCO to adjust the same against
    its earnings from ABT and power trading.

20
Views of Stakeholders .. Contd.
  • Revenue Requirement Tariff
  • Commission may decide the status of GRIDCO and
    then say whether GRIDCO is authorized to file an
    ARR instead of charging only 4 margin.
  • Revenue receipt will increase due to sale of
    additional power as assumed by GRIDCO.
  • Revenue expenses on transmission will decrease as
    consumers should not pay the interest on bonds on
    account of arrear energy charges.
  • Expenditure will decrease if pass through claims
    of GRIDCO are critically scrutinized by OERC.
  • The cost of procurement of power will decrease
    substantially if the factors determining the cost
    of power are scrutinized.

21
Views of Stakeholders contd.
  • Revenue Requirement Tariff Cont
  • There is no justification in proposing any
    increase in Bulk Supply Price for FY 2007-08 by
    GRIDCO.
  • OERC allowed increase in BST during 2006-07 which
    encouraged GRIDCO to inflate its claims.
  • The Commission should scrutinize the Application
    of GRIDCO and reduce the BST for the FY 2006-07.
  • The prices should be differentiated for peak and
    off-peak supply and the tariff should include
    variable cost of generation at actual levels and
    reasonable compensation for capacity charges.
  • GRIDCOs proposal for a steep increase in BST, if
    accepted, will only help to close many industries
    and deny power to many households.

22
Views of Stakeholders contd.
  • GRIDCO should avail of cheaper loans to pay back
    costlier loans taken earlier.
  • Interest allowed in ARR for NTPC Bond may be
    trued up.
  • Similar principles may be followed while
    approving the interest cost for 2007-08.
  • Interest towards securitization as well as
    capital of securitization should not be passed on
    to the ARR.
  • Commission need not consider the ROE of Rs. 60.62
    crore as proposed by the licensee.
  • OPTCL may be directed to limit the transmission
    losses to a figure less than the approved loss of
    4 for 2006-07.

23
  • VIEWS OF GRIDCO/STAKE HOLDERS REQUESTED ON THE
    FOLLOWING ISSUES

24
Issues in BSP 2007-08
  • Projection of a rise of 7.65 in consumption for
    the year 2007-08.
  • Hefty rise in demand projected needs attention.
  • GRIDCOs projection of transmission loss of 5.
  • Latest reservoir levels in hydel stations and
    maximization of drawl.
  • Justification of allocation of power from KhSTPS.
  • Maximization of drawl from CGPs.
  • Justification of claim of past losses uncovered
    expenses to the tune Rs. 677.01 crore.
  • Interest cost of Rs 180.72 crore.

25
Thank You
Write a Comment
User Comments (0)
About PowerShow.com