website www'turbocor'com - PowerPoint PPT Presentation

1 / 32
About This Presentation
Title:

website www'turbocor'com

Description:

2 stage, direct drive, hermetic centrifugal compressor. Inlet Guide Vanes ... 250 Ton R-12 McQuay Centrifugal. Some Project Facts. Project Duration 10 Days ... – PowerPoint PPT presentation

Number of Views:425
Avg rating:3.0/5.0
Slides: 33
Provided by: anne98
Category:

less

Transcript and Presenter's Notes

Title: website www'turbocor'com


1
Gene Smithart, V. P. Sales and Marketing
website -- www.turbocor.com
2
Vision
3
U.S. EPA
4
Emissions
Energy Efficiency
5
Oil-Free
Best Efficiency
Computer that thinks its a Compressor
6
EXCITEMENT
  • 33 better operating efficiencies, especially at
    part load.

7
Chiller Part Load Comparisons
8
EXCITEMENT
  • 33 better operating efficiencies, especially at
    part load.
  • Oil-Free, with maintenance cost 50 less than
    oiled compressors.
  • So quiet, that with typical background noise,
    you cant hear it run.
  • Only weighs 1/5 that of a typical screw or recip
    compressor.
  • Redefines soft-start, pulling less than 2 amps
    vs. the 500 to 600 amps of a typical screw.

9
The Turbocor Compressor at a Glance
10
Magnetic Bearing System
Magnetic bearings and sensors keep the shaft
properly centered and positioned at all times.
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
  • Turbocor Compressors
  • Already proven in hundreds of installations
    with
  • Over 3,000,000 hours of field operation

16
  • Here are just a few

17
University of Ontario Institute of
Technology -Toronto
18
(No Transcript)
19
Axima - Germany
20
The Sinclair Building Pasadena, CA
  • 6,400 lbs was replaced with 265 lbs, Two 40
    Worthingtons
  • Converted to One Turbocor
  • 80 Ton VFD 134a Centrifugal
  • R22 Built up DX system converted to R134a

21
US Navy San Diego
  • Carrier 23XL screw chiller
  • Retrofit Conversion to
  • 3 Turbocor VFD Centrifugal
  • Compressors

22
(No Transcript)
23
250 Ton R-12 McQuay Centrifugal
24
(No Transcript)
25
(No Transcript)
26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
(No Transcript)
30
(No Transcript)
31
Some Project Facts
  • Project Duration 10 Days
  • Field Measured Kw/Ton Pre-Conversion
  • .68 Kw/Ton to .90 Kw/Ton
  • Field Measured Kw/Ton Post-Conversion
  • .35 Kw/Ton to .55 Kw/Ton

32
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com