Target Store in Silverthorne

Description:

The dock area slopes down toward the doors; the snow blows and drifts creating ... The Target Project began October 1, 2002 and was completed December 31, 2002. ... – PowerPoint PPT presentation

Number of Views:168
Avg rating:3.0/5.0
Slides: 17
Provided by: willt
Category:

less

Transcript and Presenter's Notes

Title: Target Store in Silverthorne


1
Target Store in Silverthorne
  • Radiant Snowmelt of Truck Dock and Entry Areas

2
Here in Colorado, we have beautiful snow.
3
Target asked us to do a snowmelt project for
their new Silverthorne store.
4
The dock area slopes down toward the doors the
snow blows and drifts creating an operational
challenge as well as a potential safety hazard.
5
The snowmelt system operates with hot water made
by these boilers.
6
Large diameter supply and return lines carry the
hot water to and from the boilers.
7
The first step is insulating the slab from the
ground.
8
Distribution manifold boxes are set strategically.
9
Here the main supplies and returns route the hot
water to and from the field circuits.
10
The field circuits are attached to steel mesh.
11
A sensor (right, low center) reads the
temperature and moisture and activates the system
ahead of the snowfall.
12
Shown here is the main store entry area ready for
the concrete slab to be poured.
13
Accessible sidewalks are also snowmelted.
14
Snow And Ice-Free Loading Dock
Snow and Ice-Free Loading Dock
15
Snow and Ice-Free Entry Area
16
The Target Project began October 1, 2002 and was
completed December 31, 2002. Click here to