Halcom Consulting llc - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

Halcom Consulting llc

Description:

Halcom Consulting llc. Sustainability. Consulting ... 0. General Procedures NIBS & ASHRAE. 1. HVAC & R Systems ASHRAE. 2. Structural Systems ASCE ... – PowerPoint PPT presentation

Number of Views:54
Avg rating:3.0/5.0
Slides: 15
Provided by: mikeh53
Category:

less

Transcript and Presenter's Notes

Title: Halcom Consulting llc


1
Halcom Consulting llc Sustainability
Consulting Commissioning 2917 Carlisle NE
Suite 109 Albuquerque, New Mexico p.
505-872-0990 f. 505-872-0728
2
Halcom Consulting llc
  • BUILDING COMMISSIONING WHAT IS IT?
  • -The systematic process of ensuring that
    building systems (e.g. HVAC, lighting, etc.) are
    designed, built and operated as intended
  • (and/or as necessary for current use)?
  • - A total quality management (TQM) approach to
    the building construction process, where enforced
    processes lead to overall reduced costs and
    better performance

3
(No Transcript)
4
Objectives of Building Commissioning
  • New comprehensive documentation of
  • owners project requirements
  • basis of design decisions and strategies
  • tests to verify system performance
  • training for building operation and maintenance

5
Total Building Commissioning
  • to ensure that the performance of the facility
    and its systems meet the functional and
    operational needs of the owner and occupants.

6
Owners Project Requirements
  • Owners functional requirements for the building.
    Includes budgets, limitations,schedules and owner
    directives.
  • Begins with owner's goals and less tangible
    needs.
  • Boiled down to qualitative and quantitative
    statements.

7
Basis of Design (BOD)
  • Implementation of OPR rationale and assumptions
    for calculations, decisions, schemes and systems.
  • Written Narrative General approach and pro's and
    con's of options.
  • Rationale Safety factors, diversities and
    technical specifications.

8
Commissioning Plan
  • Communications Tool
  • Overview of the project
  • Roles and Responsibilities
  • Communication Protocols
  • Outline the Cx Process
  • Schedule

9
Commissioned Systems
  • 0. General Procedures NIBS
    ASHRAE
  • 1. HVAC R Systems ASHRAE
  • 2. Structural Systems ASCE
  • 3. Enclosure Systems NIBS
  • 4. Interior Systems

10
Commissioned Systems
  • 5. Plumbing Systems ASPE
  • 6. Lighting Systems IES
  • 7. Electrical Systems NECA
  • 8. Fire Protection Systems NFPA
  • 9. Telecommunications Systems

11
Pre-Functional Tests
  • Static inspection and procedures that confirm
    that systems and equipment are ready for
    operation.
  • This is where the point to point checkout of the
    control system is initiated.

12
Functional Tests
  • Dynamic testing of systems and equipments, under
    operating conditions.
  • Tests sequence of operation, responses and
    interlocks with other systems.
  • Documentation of results.

13
Training
  • O M Manuals and warranties
  • Training, Training and Training
  • Training Scope
  • Training documentation
  • Tailored to the audience
  • Enhanced Training

14
Halcom Consulting llc Sustainability
Consulting Commissioning 2917 Carlisle NE
Suite 109 Albuquerque, New Mexico p.
505-872-0990 f. 505-872-0728
Write a Comment
User Comments (0)
About PowerShow.com