Title: 526th ICBM Systems Wing


1
526th ICBM Systems Wing
2
PROJECTED REQUIREMENTS
  • Program Oxygen Regeneration Unit (ORU)
  • Scope Replace existing ORU
  • Schedule FY07
  • Budget 1.5M Type MSD (3400)
  • POC 526 GSSG/Ms Pat Iverson/(801) 777-2876/
  • pat.iverson_at_hill.af.mil
  • Acquisition Strategy Competitive

3
PROJECTED REQUIREMENTS
  • Program Chemical, Bacteriological, Radiological
    (CBR) Filter
  • Scope Replace existing CBR Filter
  • Schedule FY07
  • Budget 1.0M Type MSD (3400)
  • POC 526 GSSG/Mr Gary Beech/(801) 777-4261/
  • gary.beech_at_hill.af.mil
  • Acquisition Strategy Competitive

4
PROJECTED REQUIREMENTS
  • Program Explosive Set Circuitry Test Set
  • Scope Replace/Improve Govt. furnished Equip
  • Schedule FY07
  • Budget 22.031M Type BP2200 (3020)
  • POC 526 FSSG/Ms Carrol Dandoy/(801) 586-5468/
  • carrol.dandoy_at_hill.af.mil
  • Acquisition Strategy Sole Source to ICBM Prime
    Contractor

5
PROJECTED REQUIREMENTS
  • Program ICBM Cable Replenishment
  • Scope Modernization and manufacture of the cable
    assemblies used for the Minuteman III Weapon
    System and test equipment
  • Schedule FY06 FY2020
  • Budget 20M (1M - 1.5M in FY06) Type MSD
    (3400)
  • POC 526 FSSG/Mr Craig Thurgood/(801) 777-9242/
    craig.thurgood _at_hill.af.mil
  • Acquisition Strategy Competitive

6
PROJECTED REQUIREMENTS
  • Program Peacekeeper Post Boost Propulsion System
    Phase 1 Disposal
  • Scope Conduct Phase 1 disposal of Peacekeeper
    PBPS liquid Stage 4 rocket motor by removing
    hazardous fuel and oxidizers.
  • Schedule FY06 through FY11
  • Budget 10.8M Type MSD (3400)
  • POC 526 FSSG/Ms An Tran/(801) 777-4350/
    Truong-An.Tran_at_hill.af.mil
  • Acquisition Strategy Sole Source to NASA White
    Sands

7
PROJECTED REQUIREMENTS
  • Program Minuteman III PSRE Test Set 1 Interface
    Upgrade
  • Scope Update test to perform Aging Surveillance
    testing
  • Schedule FY06
  • Budget 650K Type BP2100 (3020)
  • POC 526 FSSG/Ms An Tran/(801) 777-4350/
    Truong-An.Tran_at_hill.af.mil
  • Acquisition Strategy Sole Source to Advanced
    Testing Technologies, Inc (ATTI)

8
PROJECTED REQUIREMENTS
  • Program Guided Missile Test Station Engineering
    Support
  • Scope Provide engineering support to the 526
    ICBM System Wing and the 309 Maintenance Wing in
    replacing existing Guided Missile Test Stations
  • Schedule FY06
  • Budget 1.5M Type BP2100 (3020)
  • POC 526 FSSG/Mr Cody Cagle/(801) 775-2152/
    cody.cagle_at_hill.af.mil
  • Acquisition Strategy Sole Source to ICBM Prime
    Contractor

9
PROJECTED REQUIREMENTS
  • Program Minuteman III Support Spares
  • Scope Provide spare nozzles, igniters, gas
    generators, and other miscellaneous spare parts
    for newly manufactured Minuteman III rocket
    motors.
  • Schedule FY06 through FY09
  • Budget up to 40M Type BP2500 (3020)
  • POC 526 FSSG/Mr Cody Cagle/(801) 775-2152/
    cody.cagle_at_hill.af.mil
  • Acquisition Strategy Sole Source to ATK

10
PROJECTED REQUIREMENTS
  • Program Minuteman Flight Control Hardness
    Surveillance Program
  • Scope Conduct yearly hardness testing of the
    Minuteman missile Flight Controls
  • Schedule FY08
  • Budget 6.1M Type BP2200 (3020)
  • POC 526 FSSG/Mr Rick Hodson/(801) 775-2589/
    rick.hodson_at_hill.af.mil
  • Acquisition Strategy Sole Source to ICBM Prime
    Contract

11
PROJECTED REQUIREMENTS
  • Program Land Based Strategic Deterrent (LBSD)
  • Scope Provide strategic deterrence and precision
    strike capabilities replacing MMIII weapon system
  • Schedule
  • Analysis of Alternatives Complete
  • Jan 08 - Milestone A decision
  • FY18 - Initial Operational Capability
  • Budget 821M, FY08-FY13 Type RDTE (3600)
  • POC 526 AQG/Mr Dan Gomez/DSN 777-1263/
  • dan.gomez _at_hill.af.mil
  • Acquisition Strategy Competitive

12
PROJECTED REQUIREMENTS
  • Program
  • ICBM Demonstration/Validation (DEM/VAL)
    Application Programs
  • Scope
  • Maturation of technology for current MM III
    weapon system
  • Technology development for future strategic
    systems
  • Maintain/develop ICBM industry research and
    development skills base
  • Schedule FY06 Contract Awards
  • Budget Approx 58M/yr thru 2011 Type RDTE
    (3600)
  • POC 526AQG/Mr. Steve Tidball/(801) 777-1744
  • steve.tidball _at_hill.af.mil
  • Acquisition Strategy
  • Current IPIC/directed subs
  • Competitive

13
PROJECTED REQUIREMENTS
  • Program Prompt Global Strike (PGS)
  • Scope Provides the capability to strike
    globally, precisely and rapidly with kinetic
    effects against high-payoff, time-sensitive
    targets in a single or multi-theater environment,
    even when US and Allied forces have no permanent
    military presence or only limited infrastructure
    in a region and regardless of anti-access
    threats.
  • Schedule
  • FY06/FY07 PGS Joint Svc (AF lead) - Analysis of
    Alternatives
  • FY08 PGS Potential program initiation
  • FY15 CAV Initial Operational Capability
  • FY20 PGS Initial Operational Capability
  • Budget 163M, FY08-FY11 (CAV PE) Type RDTE
    (3600)
  • POC 526 AQG/Lt Col Smellie/(801) 586-5367/
  • douglas.smellie _at_hill.af.mil
  • Acquisition Strategy Competitive

14
SUMMARY
  • Will award over 600 actions in FY06
  • Will spend 1.1B total operating budget in FY06
  • Acquisition Strategy both Sole Source and
    Competitive