Title: BRAC 2005 SAME 4 November 2005
1BRAC 2005SAME4 November 2005
BRAC Division Assistant Chief of
Staff Installation Management (ACSIM) Headquarters
, Department of the Army (703) 601-1911 / DSN
329-1911 / Pentagon / Crystal City Robert.Derrick_at_
hqda.army.mil
2BRAC Division Mission
Effectively and efficiently implement the
congressionally approved BRAC recommendations,
while maintaining the well-being of Army
Soldiers, civilians and their families, and
considering impacts to the Armys primary mission
and to local communities.
GWOT Mission
Time Phasing
Local Communities
Quality of Life
3Legacy BRAC Rounds
1988 77 Closures 6 Realignments 1991
5 Closures 6 Realignments 1993 2
Closures 4 Realignments 1995 32 Closures
11 Realignments 116 Closures 27
Realignments 143 Installations w/ 260,352 Excess
Acres 2001 Added 14 AMC Ammunition
Plants 115,869 Additional Excess Acres
41/3 of the Army on the Move
Germany
Korea
Ft Lewis
1. Transformation to a Modular Force 2. Return
from Overseas 3. Base Realignment and Closure
Rock Island
Ft Carson
Ft Knox
Ft Riley
Ft Lee
Ft Eustis
Ft Campbell
Ft Irwin
Pope AFB
Ft Sill
Ft Bragg
Shaw AFB
Ft Benning
Ft Rucker
Ft Bliss
Ft Polk
Italy
Ft Wainwright
Ft Hood
Ft Richardson
Schofield Barracks / Ft Shafter
160K SMs Moving
5BRAC Analysis Included
- Transformation to Army Modular Force
- Brigade Combat Teams
- Integrated Global Presence Basing Strategy
(IGPBS) - Return 70,000 Soldiers and 100,000 Family Members
- Installation Military Value
- Ranked 1 to N for all Installations
- Doctrinal Efficiencies
- Ft Leonard Wood, MO. MANSCEN Like Initiatives
(Engr, MPs, Chem) - Joint Initiatives
- Common Base Operations, Joint Training Locations,
efficient logistics - National Guard and Army Reserves
- Multi-Service and Component Facilities Air Guard
and Naval Reserves
6804 Directed BRAC Moves76 Installations Touched
by BRAC
AMF Activations IGPBS Moves
- 17 Installations with AMF Actions
- 19 Installations with IGPBS Units Inbound
- 5 Installations AMF and IGPBS, but no BRAC
- Ft Drum, Ft Polk, Ft Stewart, Ft Irwin, Schofield
Barracks
- 53 Installations Realignments
- 50 Active Installations
- 3 Reserve Garrisons
- 8 Leased Facilities Closed
- 125 New Armed Forces Reserves Centers
- 13 Full Closures
- 5 HQ Installations
- 3 Chemical Depots
- 4 Ammunition Plants
- 1 Reserve Garrison
- 211 Guard Closures
- 175 Reserve Closures
7BRAC Process Overview
Must Realign and Close by 15 Sept 2011
15 Sept 05 List from President to Congress 6 Year
Clock has started
13 May 05 List Became Public
2006 2007 2008 2009 2010 2011
M J J A S O N D
Realignment Closure Activities
9 Nov 05 List becomes Binding BRAC Law
Phase II
Phase I
Commission
Planning
Phase III Concurrent
Transfer Excess Surplus Property ASAP
8BRAC Process Details
15 Sept 05 6 Yr Clock Started
Realigned, Closed in 6 years
J
A
S
O
N
J
M
BRAC ACTIVITIES
NEPA MILCON
Close
Commission
M o v e
Realign Only Continue Mission
Planning
Transfer Excess Surplus property ASAP
Analyze
Screen
Negotiate
Transfer
13 May 05 Recommendations to Commission
9 Nov 05 List becomes Binding
9Property Screening
Determining the Recipient
- 13 May SECDEF Recommendations to Congress
- 8 Sept Commission present list to President
- 15 Sept President send list to Congress
TBD BRAC Law, approx. 9 Nov 05
Federal Screening
State / Local Screening
- Determination of Surplus (DOS)
ScreeningStart
Screening Start
DeterminationofSurplus
Screening Done
D 6 months 1 week NLT May 06
DOS 22 months NLT March 08
D Day Nov 05
10Ft Knox Complexity
HumanResourcesCmd
Hoffman Bldgs
IGPBS
Access Cmd Cadet Cmd
Ft Knox
BCT
RC
Ft Monroe
Armor School
Ft Benning
11Joint and Multi-Component
HumanResourcesCmd
APG
Hoffman Bldgs
IGPBS
Ord School
Ft Eustis
Access Cmd Cadet Cmd
Ft Knox
TRADOC
BCT
TC School
RC
Ft Lee
Ft Monroe
Munitions Missiles Ctr
Armor School
Culinary Arts
Ft Jackson
AF
AF
Chaplains Schools
Navy
Redstone
Navy
Drill Sgt
Ft Benning
Ft LWood
Drill Sgt
12Banded Priorities
Operational Army First
ADA Schl to Ft Sill Armor Schl to Ft
Benning TC Schl to Ft Lee Ord Schl to Ft
Lee Msl Schl to Ft Lee
NEPA
MILCON
NEPA
MILCON
NEPA
MILCON
NEPA
MILCON
ATEC to APG HRC to Ft Knox IMA to Ft
Sam CIDC to Quantico SDDC to Scott AFB 1st
Army to Rock Island 3rd Army to Shaw
AFB Accessions to Ft Knox USARC to Pope AFB
MILCON
NEPA
NEPA
MILCON
NEPA
MILCON
NEPA
MILCON
NEPA
MILCON
NEPA
MILCON
NEPA
MILCON
MILCON
NEPA
FORSCOM to Pope AFB TRADOC to Ft Eustis AMC
to Red Stone
MILCON
NEPA
MILCON
NEPA
MILCON
NEPA
Build 125 ea AFRCs
13Construction Synchronizationfor each Installation
Requirements Time Phasing
Notional
14Close / Dispose Environmental Work for Disposal
ECP Environmental Condition Of Property Ph I
(Ph II As needed) draft FOST / FOSET Completed
Army Environmental Ctr
AEC Do In house
AEC will 1. Write the ECP (w/CERFA) or 2. Do
minor work then write ECP or 3. Write SOW (w/ IGE
Schedule) for BRACD to contract for ECP
PER Programmatic Environmental Review (Draft Gap
Analysis)
PER Complete
Environmental Charrette
NEPA Questionnaire Complete
Disposal NEPA NST PMs Manage and Report to BRAC
Div
BRACD contract to Mobile District NEPA Spt
Team (NST)
Mobile District
NST will produce draft
NEPA Prep What must be done to do the Disposal
NEPA?
SOW for the NEPA (w. IGE Schedule)
DOPAA Description of the Proposed Action and
Alternatives
Environmental Condition of the Property (ECP)
Environmental Baseline Survey (EBS requirements
needed to do FOST / FOSET) what is needed to do
property disposal (UXO/MMRP Asbestos
Cultural Natural Resources Lead Paint)
15MILCON TransformationComponent Construction
16Questions?SAME4 November 2005
BRAC Division Assistant Chief of
Staff Installation Management (ACSIM) Headquarters
, Department of the Army (703) 601-1911 / DSN
329-1911 / Pentagon / Crystal City Robert.Derrick_at_
hqda.army.mil