Title: EPA NPDES Storm Water Construction


1
EPA NPDES Storm Water Construction
  • Rick Gitar, Water Regulatory Specialist
  • Fond du Lac Office of Water Protection

2
EPA NPDES
  • Clean Water Act Section 402
  • National Pollutant Discharge Elimination System
    (NPDES)
  • Promulgated Rules
  • Permit System Point Non-Point
  • State/Tribe Authorization
  • Storm Water Construction

3
EPA Authorization/Retention
  • EPA can authorize a state to administer the NPDES
    program
  • Minnesota is authorized (MPCA)
  • EPA retains authority on Indian Reservations
    Indian Country
  • State does NOT have jurisdiction on Indian
    Reservations

4
(No Transcript)
5
Storm Water Construction Program
  • Phase 1
  • Construction sites impacting 5 acres or more
    (termed large construction sites)
  • General and Individual Permits
  • Tribes not subject to Rule
  • Effectively replaced by Phase II

6
Storm Water Construction Program
  • Phase II
  • Construction sites impacting 1-5 acres (small
    sites) and 5 or more acres (large sites)
  • General and Individual Permits
  • Tribes subject to Rule
  • Began March 2003

7
Storm Water Construction General Permit
  • Construction General Permit
  • CGP 2003 (On-going sites covered until 2010)
  • CGP 2008 (New dischargers only until 2010)
  • CGP 2010 (will include Effluent Limitation
    Guidelines)
  • Discharges to Waters of the United States or to
    an MS4

8
Discharges
  • Discharges associated with large and small
    construction sites
  • Discharges from support activities
  • Batch plants, staging yards, storage areas,
    borrow sites, excavation disposal areas, etc.
  • Discharges co-mingled with discharges allowed
    under another NPDES permit

9
Allowable Non-Storm Water Discharges
  • Fire fighting/fire hydrant flushing
  • Non-detergent vehicle wash water
  • Water for dust control
  • Potable water/water line flushing
  • Non-detergent building wash down water
  • Pavement wash water (no toxic substances)
  • Uncontaminated air conditioning condensate
  • Uncontaminated ground water/spring water
  • Foundation/footing drains
  • Uncontaminated excavation dewatering
  • Landscape irrigation

10
Control Measures and Practices
  • Sediment Controls
  • Sediment basins/sediment traps
  • Off-Site Sediment Tracking Dust Control
  • Construction entrances/water spraying
  • Runoff Management
  • Divert flows or retain/detain flows
  • Erosive Velocity Control
  • Velocity dissipation devices at outfalls/channels

11
Control Measures and Practices
  • Post-Construction Storm Water Management
  • Permanent BMPs sediment/infiltration basins
  • Construction Waste Materials
  • Control/collect/dispose wastes
  • Non-Construction Wastes
  • Strom water from concrete or asphalt batch plants
  • Erosion Control Stabilization
  • Stabilize disturbed areas/protect existing veg

12
Control Measures and Practices
  • Spills/Releases in Excess of Reportable
    Quantities
  • Report spills of 5 gallons or more to the
    National Response Center 1-800-424-8802
  • Within 7 days submit report description or
    release, circumstances of release, date, measures
    to prevent reoccurance.

13
Other Measures
  • Maintenance of Controls
  • Employee Training
  • Site Inspections
  • Applicable State, Tribal, or Local Programs
  • State/Tribal Conditions FdL conditions
  • SWPPP submitted 30 days prior to NOI submit
  • No discharges to ORRWs
  • NOI NOT submitted at same time as EPA
  • Additional conditions (see CGP 2008 Part
    10.C.1.a)

14
Requirements
  • Prepare a Storm Water Pollution Prevention Plan
    (SWPPP) prior to NOI
  • Submit a Notice of Intent (NOI) to EPA
  • FOLLOW THE SWPPP!!!
  • Document inspections/changes/work
  • Submit a Notice of Termination (NOT) to EPA upon
    project completion

15
Inspection Requirements
  • Frequency 7 days or 14 days w/ 24 hr, 0.5 in
  • Waiver frozen conditions or all stabilized
  • Who? Qualified Personnel
  • Scope all disturbed areas storage areas
  • What BMP install, effective, maintain
  • Report date, who, weather, discharges, BMPs
    (maintenance, replace, needed, corrective
    actions)

16
SWPPP Contents
  • Construction Site Operators
  • All Operators identified/area responsible
  • Nature of Construction Activity
  • Function of project
  • Soil disturbance activities sequence/timing
  • Excavation/grading/borrow/fill identified
  • General location map

17
SWPPP Contents (continued)
  • Site Map (legible showing entire site)
  • Flow directions slopes anticipated after
    grading
  • Areas of soil disturbance undisturbed areas
  • Location of all major BMPs identified in SWPPP
  • Location of all stabilization areas
  • Storage areas (waste, borrow, equip) off-site
  • Location of all Waters of U.S. including wetlands
  • Location of all storm water discharges
  • Location where final stabilization achieved

18
SWPPP Contents (continued)
  • Construction Waste Materials/Storage
  • Other Industrial Storm Water Discharges
  • Description of Control Measures
  • Non-Storm Water Discharges
  • Endangered Species Documentation
  • Total Maximum Daily Load (TMDL)
  • Copy of Permit, NOI, NOT

19
SWPPP Contents (continued)
  • Documentation of Inspections
  • Certification/Signature
  • Corporations Responsible Corporate Officer
  • Sole Proprietor/Partnership Owner or Partner
  • Agency Executive Officer or Ranking Elected
    Official

20
Additional Requirements
  • SWPPP must be maintained and updated
  • SWPPP, Permit, NOI, Acknowledgement Letter at
    Site or other access location
  • Site Entrance Sign copy of NOI and SWPPP
    location identified

21
Notice of Intent
  • Submit to EPA prior to beginning any construction
    activity
  • Permit coverage begins 7 days after NOI
    acknowledgement posted on EPAs website
  • Acknowledgement letter also sent
  • No website posting must wait for letter (may be
    required to correct NOI or submit SWPPP or
    Individual Permit required)

22
Notice of Termination
  • Submit the NOT when
  • Final stabilization achieved in all areas, or
  • Other Operator has assumed control of site, or
  • Coverage under other NPDES permit obtained, or
  • Residential Only Temporary stabilization
    achieved and property transferred to owner.
  • Must be submitted within 30 days of any of the
    above condition being met.

23
For Further Information
  • Go to EPAs Construction General Permit website at
  • http//cfpub.epa.gov/npdes/stormwater/cgp.cfm
  • NOIs and NOTs can be submitted by mail or can be
    submitted electronically

24
Questions?
  • Contact Info
  • Rick Gitar, Water Regulatory Specialist
  • Fond du Lac Reservation
  • Office of Water Protection
  • 1720 Big Lake Road
  • Cloquet, Minnesota 55720
  • Phone 218-878-8022 Fax 218-878-8030
  • Email richardgitar_at_FDLREZ.com