VSI output signals - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

VSI output signals

Description:

11/20/09. 1. Technical. VSI output signals. Gas injector opens 1 msec later ... With or without Bosch connectors for petrol ... steered coolant flow ... – PowerPoint PPT presentation

Number of Views:78
Avg rating:3.0/5.0
Slides: 12
Provided by: joepla
Category:
Tags: vsi | coolant | output | signals

less

Transcript and Presenter's Notes

Title: VSI output signals


1
VSI output signals
Petrol injector starts
Petrol injector closes
Gas ECU calculating ti_b
Ti-gas(ti-b x RCoffset) x LPG_correction
Gas injector closes
Gas injector opens 1 msec later
2
Synchronise LPG inj with petrol inj
Offset
Petrol injector
LPG injector
RC
Fuel flow gr/sec
Injection time msec
3
VSI corrections
  • Start enrichment.
  • Warm up enrichment.
  • Full load enrichment.
  • System pressure.
  • LPgas temperature.
  • Emission correction.

4
New cable harness
  • Integrated injector simulator!
  • 2 cable harness versions
  • With or without Bosch connectors for petrol
    injector interruption.
  • Colour text identification for matching petrol
    gas injector.
  • Smaller wire diameter for injector interruption
    cables (0.35mm²).
  • Less wires to connect.
  • May 2005

5
New injection module
  • No more petrol injector plus interruption!
  • Only interruption of the minus wire of each
    injector.
  • Integrated injection time measuring wires, less
    wires to connect.
  • During gas mode, the petrol injector is now
    switched off by current reduction. (in series
    simulation)
  • Part number of injector module on cable harness
    is equal to spare part number.
  • May 2005

6
Current injection module
7
New injection module
8
Fuel switch
  • In house development.
  • In switch integrated beeper.
  • Programmable for Hall or resistive indicator.
  • Thickness increased with only 2mm compared to the
    old switch.
  • Reduced amount of wires 7 in stead of 8.
  • Connector housing separate delivered on both
    cable
  • harness and switch side!

9
Tank sender / indicator
  • Measures contactless tank content, so robust and
    reliable.
  • Measures tank content in 5 levels
  • 80 60 40 20 and low level

10
Future developments
  • Feasibility study LPG system for direct injected
    petrol engines.
  • R115 certification of the VSI system, expected
    2006.
  • Gas temperature steered coolant flow regulation.
  • Possibility for plastic version of 2 5 cylinder
    injector rail.
  • VSI-II.

11
VSI-II
  • In ECU integrated injection simulation.
  • Cylinder selective switching.
  • In ECU integrated timing advance processor for
    CNG applications.
  • Multi-use RPM input, for handling of Hall-,
    inductive- and ignition coil pulses.
  • Feasibility of wide range lambda sensor read
    out.
  • Communication with petrol ECU via OEM data bus
  • Beginning of 2006.
Write a Comment
User Comments (0)
About PowerShow.com