Title: SIMULATION


1
Kosta Karachristos
SIMULATION OF CHESIRE DIRECT CONVEYOR SYSTEM
Ralph Minaya
2
OVERVIEW
  • Introduction
  • Background
  • System Description
  • Scope
  • Assumptions
  • Data Collection
  • Model Behavior
  • Current Proposed
  • Verify Validate
  • Conclusions Recommendations

3
INTRODUCTION
  • Orders Shipped in 24 Hrs
  • Designer Merchandise Received
  • Merchandise Processed for Stock
  • Loaded Onto Auto Conveyor
  • Currently Bottlenecks Occur On Conveyor
  • Merchandise Stocked for Consumer Orders

4
GOAL
  • Establish Correct Work Load Between Receiving
    Stock
  • Minimize Conveyor Bottlenecks

5
BACKGROUND - Receiving
  • Prepped In Bin Boxes
  • Loaded On To Conveyor
  • Readily Available

PREP AREA
CONVEYOR
6
BACKGROUND - CONVEYOR
Conveyor
  • Once Loaded Barcode Directs Bin Box
  • Bin Box Dim. (1 x 2 x 1) ft

Bar Scanner
Bin Box
7
BACKGROUND - Stock Put Away
  • Bin Boxes Loaded On Shelves
  • 3 Put Away Persons

Stock Locations
Bin Boxes
8
SCOPE DATA COLLECTION
  • Receiving
  • Readily Available
  • Mean .55 Bins/Min
  • Distribution Based on 18 Production Weeks
  • Weibull Distribution
  • Conveyor
  • 714 ft in Length
  • 122 ft/min
  • Capacity 357 bin boxes
  • (contd)

9
SCOPE DATA COLLECTION
  • Stock Put-Away
  • 3 Personnel
  • Mean 1 Bin/Min
  • Distribution Based on 18 Production Weeks
  • Weibull

10
VERIFY VALIDATE
  • Met with Cheshire Direct Management Personnel
  • IE Manager
  • Receiving Manager
  • Stock Manager
  • Receiving Stock Personnel
  • Time Study Results
  • 55 min in entire system
  • 5 min conveyor time
  • Current Model Results
  • 56.48 min in entire system
  • 5.97 min conveyor time

11
CONCLUSIONS RECOMMENDATIONS
  • Communication Must Improve Between Stock
    Receiving Personnel