Title: ENVISAT Validation using the DLR Falcon 20 Research Aircraft
1ENVISAT Validation using the DLR Falcon 20
Research Aircraft
- Overview over the Validation Activities
Prepared by Andreas Fix, 04/11/02
2The Falcon 20 D-CMET
3ENVISAT Validation activities of the Falcon
- 2 Different Missions with different Payloads and
Objectives
4SCIA-VALUE(SCIAMACHY Validation and Scientific
Utilisation Experiment)
Objectives Validation of SCIAMACHY level-2
data products O3, N2O, NO2, BrO, ClO, H2O,
OClO, and cloud and aerosol optical properties
Working Groups University of Heidelberg,
Germany T. Wagner, K.-P. Heue, U. Platt,
University of Bremen, Germany H. Küllmann, A.
Kleinböhl, K. Künzi, A. Richter, M. Bruns, P.
Wang, J.P. Burrows German Aerospace Center
(DLR) A. Fix, G. Ehret
5SCIA-VALUE Falcon Payload
6SCIA-VALUE Falcon Payload
Falcon 20 equipped with the three remote sensing
instruments ASUR, AMAXDOAS, and OLEX for
air-borne validation of SCIAMACHY data products
O3, N2O, NO2, BrO, ClO, H2O, OClO, and cloud and
aerosol optical properties
7SCIA-VALUE Flight Tracks
- 2 Main Campaigns( 100 flight hours)
- 6-28. September 2002 successfully performed
- Feb/Mar 2003 (planned)
8Summary of SCIAMACHY overpasses during the
September 2002 campaign
9Falcon passing Kilimanjaro, Kenia
10MIPAS-VAL
- Objectives
- The measurement of water vapour and aerosol
profiles using the airborne H2O-DIAL of DLR as
the core instrument and the comparison of these
data to the respective MIPAS Level 2-products. - Intercomparison with the remote and in-situ
GEOPHYSIKA instruments measuring water vapour and
aerosol (i.e. MIPAS-STR,SAFIRE-A, FISH, FLASH,
MAL, MAS, FSSP, ABLE) - Measurement of small-scale structures in the
tropopause region, the comparison of these
results with the ENVISAT products and model
results of climate and climate-chemistry models. - Campaign
- Joint campaign with the GEOPHYSIKA mid-latitude
validation activities (Forli, Italy (October
2002))
11MIPAS-VAL Falcon Payloadall instruments
operated by DLR (PI Andreas Fix)
12Summary of MIPAS overpasses during the Forli
2002 campaign (14-28/10/02)
8 Falcon Flights total (25.5 h) 4 Flights
co-ordinated with GEOPHYSIKA ) 4 flights at
daylight 4 flights at night-time
13Summary
- 2 Falcon Missions
- SCIA-VALUE
- 2 main measurement campaigns (50 flight hours
each) - First campaign succesfully performed (Sep. 2002)
- Second campaign scheduled for Feb/Mar 2003
- No need to change flight plan or instrumentation
- MIPAS-VAL
- Validation campaign (Forli 2002, 25 flight
hours) successfully performed - No further campaign activity within this mission