Title: Bioreactor Demonstration Project Update
1Bioreactor Demonstration Project Update
2Vertical Injection Well Clusters 134 wells in 45
clusters
3Vertical Injection Well Clusters Leachate
Recirculation
4Vertical Injection Well Clusters Leachate
Recirculation at present
5Vertical Injection Well Clusters Leachate
Recirculation at present
Majority of leachate has been recirculated in
anaerobic zone
6Leachate Recirculation
7(No Transcript)
8(No Transcript)
9MTG Sensor Data
- MTG sensor data being collected continuously
- Data providing adequate knowledge about spatial
moisture distribution - Moisture content (MC) value assessment
methodology from MTG sensors being developed
10Calibration Curve for MC
16.0 mS/cm in process
11Moisture Content Plots
Data April 28, 2004
12Differential MC Plots
Data April 04 Oct 03
13Temperature Plots
Data April 28, 2004
14Data Interpretation
- MC plots made using 8.0 mS/cm calibration curve
- Precise MC value can be evaluated after
application of higher eC value - MC increased by approximately 10 (w/w) since
beginning of injection using statistical average - This MC increase is equivalent to the addition of
2.9 million gallons - Temperature has increased 0.5oC
15New River Regional Landfill
Alachua CountySouthwest Landfill
Polk CountyNorth Central Landfill
16ACSWL
- Began receiving waste in the 1970s
- A composite lined landfill unit was constructed
in 1988 - 27 acres, constructed in two phases
- Disposed on the order of 300 tons per day of MSW
- Closed in 1999
17Research at ACSWL
- Research has been ongoing at the site since 1988
- Professor W. Lamar Miller
- Funding by Alachua County Public Works
Department, Florida Center for Solid and
Hazardous Waste Management and US EPA - Research into leachate recirculation and
accelerated waste stabilization began in 1990.
18(No Transcript)
19(No Transcript)
20(No Transcript)
21(No Transcript)
22(No Transcript)
23(No Transcript)
24Horizontal Injection
- Horizontal injection trenches were constructed in
the northern half of the landfill beginning in
1992.
25(No Transcript)
26(No Transcript)
27(No Transcript)
28(No Transcript)
29(No Transcript)
30(No Transcript)
31ACSWL Cross-Section Showing Injection Laterals
32Pond System
HIL System
LeachateRecirculationResumes
Operating Years
33Current Activities at the Site
- No major leachate recirculation activities after
1996. - Landfill was closed and capped in 1998/1999.
- The system was recently modified to recirculate
leachate underneath the cap. - A gas-to-energy system has been installed at the
site.
34(No Transcript)
35(No Transcript)
36(No Transcript)
37Current Activities Recirculation Under the Cap
38(No Transcript)
39(No Transcript)
40Gas is converted to green energy
41Gas to Energy
- Power generation system
- Three CAT, 825 KW, 16-cylinder modified diesel
engines - Take 45-58 CH4, and approx. 325 scfm each
- Total maximum generation is 2.4 MW (approx.)
- Gas Collection system
- 40 Hp adjustable frequency drive(AFD) blowers,
two in all - Blowers have 0.1 micron filters
- Maximum 80 H2O vacuum per blower
42Polk County North Central Landfill
- Currently constructing and permitting a
bioreactor - Installing horizontal injection trenches
- Evaluating methods of recirculating leachate
43NCLF Phase II 2001
44NCLF Phase II 2004
45- Leachate injection lines are installed in the
waste as the landfill is filled up.
46First Two Injection Lines
47Placing First Line in Trench
48(No Transcript)
49(No Transcript)
50Filling in Trench
51New Method for Installation Vibratory Plow
52Horizontal Injection Line Installation Progress
at Polk County NCLF
250
Existing Horizontal Leachate Injection Lines
230
210
Phase II
190
170
Lines Installed Fall/Winter 2003/04
150
Phase I
130
Present Waste Extent
110
2
3
4
5
6
7
8
1
53Horizontal Injection Line Installation Progress
at Polk County NCLF
LCS Trench Divide
2
3
4
5
6
7
8
Subcell 1
LCS Pipe
Installed Horizontal Leachate Injection Lines
Lines Installed Fall/Winter 2003/2004
Phase I
Present Waste Contours
54Status
- The bioreactor permit modification has been
prepared and submitted. - Leaching recirculation lines continue to be
installed. - Construction will begin by the end of the year on
leachate delivery system.
55Unlined Landfill Unit at NCLF
56NewLinedLandfill
OldExistingLandfill
57Potential NewLined Landfill Cells
Added Disposal Capacity 9 million tons At
current tipping fee 310 million
58To examine the suitability ofthe old landfill as
a foundationfor the new landfill, samples
ofwaste were collected using a3-ft bucket auger.
59(No Transcript)
60(No Transcript)
61Some of the waste was relatively decomposed
62Some of the waste was clearly not decomposed
63Green yard trash from 20-year old waste sample
64Samples were collected for characterization
65Samples were collected for characterization
66Samples were weighed
67A great number of samples were collected!
68- Many types of analyses will be conducted on the
samples. - Chemical parameters
- Moisture content
- Compressibility
- The device here was constructed for this project
to examine the stress-strain modulus of the
excavated waste samples.
69Exploring Crushed Glass as a Drainage Media