Bioreactor Demonstration Project Update - PowerPoint PPT Presentation

1 / 69
About This Presentation
Title:

Bioreactor Demonstration Project Update

Description:

A gas-to-energy system has been installed at the site. Current Activities: ... Horizontal Injection Line Installation Progress at Polk County NCLF. Status ... – PowerPoint PPT presentation

Number of Views:110
Avg rating:3.0/5.0
Slides: 70
Provided by: pradee8
Category:

less

Transcript and Presenter's Notes

Title: Bioreactor Demonstration Project Update


1
Bioreactor Demonstration Project Update
  • May 14, 2004

2
Vertical Injection Well Clusters 134 wells in 45
clusters
3
Vertical Injection Well Clusters Leachate
Recirculation
4
Vertical Injection Well Clusters Leachate
Recirculation at present
5
Vertical Injection Well Clusters Leachate
Recirculation at present
Majority of leachate has been recirculated in
anaerobic zone
6
Leachate Recirculation
7
(No Transcript)
8
(No Transcript)
9
MTG Sensor Data
  • MTG sensor data being collected continuously
  • Data providing adequate knowledge about spatial
    moisture distribution
  • Moisture content (MC) value assessment
    methodology from MTG sensors being developed

10
Calibration Curve for MC
16.0 mS/cm in process
11
Moisture Content Plots
Data April 28, 2004
12
Differential MC Plots
Data April 04 Oct 03
13
Temperature Plots
Data April 28, 2004
14
Data Interpretation
  • MC plots made using 8.0 mS/cm calibration curve
  • Precise MC value can be evaluated after
    application of higher eC value
  • MC increased by approximately 10 (w/w) since
    beginning of injection using statistical average
  • This MC increase is equivalent to the addition of
    2.9 million gallons
  • Temperature has increased 0.5oC

15
New River Regional Landfill
Alachua CountySouthwest Landfill
Polk CountyNorth Central Landfill
16
ACSWL
  • Began receiving waste in the 1970s
  • A composite lined landfill unit was constructed
    in 1988
  • 27 acres, constructed in two phases
  • Disposed on the order of 300 tons per day of MSW
  • Closed in 1999

17
Research at ACSWL
  • Research has been ongoing at the site since 1988
  • Professor W. Lamar Miller
  • Funding by Alachua County Public Works
    Department, Florida Center for Solid and
    Hazardous Waste Management and US EPA
  • Research into leachate recirculation and
    accelerated waste stabilization began in 1990.

18
(No Transcript)
19
(No Transcript)
20
(No Transcript)
21
(No Transcript)
22
(No Transcript)
23
(No Transcript)
24
Horizontal Injection
  • Horizontal injection trenches were constructed in
    the northern half of the landfill beginning in
    1992.

25
(No Transcript)
26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
(No Transcript)
30
(No Transcript)
31
ACSWL Cross-Section Showing Injection Laterals
32
Pond System
HIL System
LeachateRecirculationResumes
Operating Years
33
Current Activities at the Site
  • No major leachate recirculation activities after
    1996.
  • Landfill was closed and capped in 1998/1999.
  • The system was recently modified to recirculate
    leachate underneath the cap.
  • A gas-to-energy system has been installed at the
    site.

34
(No Transcript)
35
(No Transcript)
36
(No Transcript)
37
Current Activities Recirculation Under the Cap
38
(No Transcript)
39
(No Transcript)
40
Gas is converted to green energy
41
Gas to Energy
  • Power generation system
  • Three CAT, 825 KW, 16-cylinder modified diesel
    engines
  • Take 45-58 CH4, and approx. 325 scfm each
  • Total maximum generation is 2.4 MW (approx.)
  • Gas Collection system
  • 40 Hp adjustable frequency drive(AFD) blowers,
    two in all
  • Blowers have 0.1 micron filters
  • Maximum 80 H2O vacuum per blower

42
Polk County North Central Landfill
  • Currently constructing and permitting a
    bioreactor
  • Installing horizontal injection trenches
  • Evaluating methods of recirculating leachate

43
NCLF Phase II 2001
44
NCLF Phase II 2004
45
  • Leachate injection lines are installed in the
    waste as the landfill is filled up.

46
First Two Injection Lines
47
Placing First Line in Trench
48
(No Transcript)
49
(No Transcript)
50
Filling in Trench
51
New Method for Installation Vibratory Plow
52
Horizontal Injection Line Installation Progress
at Polk County NCLF
250
Existing Horizontal Leachate Injection Lines
230
210
Phase II
190
170
Lines Installed Fall/Winter 2003/04
150
Phase I
130
Present Waste Extent
110
2
3
4
5
6
7
8
1
53
Horizontal Injection Line Installation Progress
at Polk County NCLF
LCS Trench Divide
2
3
4
5
6
7
8
Subcell 1
LCS Pipe
Installed Horizontal Leachate Injection Lines
Lines Installed Fall/Winter 2003/2004
Phase I
Present Waste Contours
54
Status
  • The bioreactor permit modification has been
    prepared and submitted.
  • Leaching recirculation lines continue to be
    installed.
  • Construction will begin by the end of the year on
    leachate delivery system.

55
Unlined Landfill Unit at NCLF
56
NewLinedLandfill
OldExistingLandfill
57
Potential NewLined Landfill Cells
Added Disposal Capacity 9 million tons At
current tipping fee 310 million
58
To examine the suitability ofthe old landfill as
a foundationfor the new landfill, samples
ofwaste were collected using a3-ft bucket auger.
59
(No Transcript)
60
(No Transcript)
61
Some of the waste was relatively decomposed
62
Some of the waste was clearly not decomposed
63
Green yard trash from 20-year old waste sample
64
Samples were collected for characterization
65
Samples were collected for characterization
66
Samples were weighed
67
A great number of samples were collected!
68
  • Many types of analyses will be conducted on the
    samples.
  • Chemical parameters
  • Moisture content
  • Compressibility
  • The device here was constructed for this project
    to examine the stress-strain modulus of the
    excavated waste samples.