PDAs - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

PDAs

Description:

Drywall. Paint. Wall Paper. L3Solutions, LLC. FloorCalc. Carpeting. Ceramic Tile ... A leading construction company in China. Initially purchased 30 HP iPAQs ... – PowerPoint PPT presentation

Number of Views:193
Avg rating:3.0/5.0
Slides: 21
Provided by: fees
Category:
Tags: chinese | drywall | pdas

less

Transcript and Presenter's Notes

Title: PDAs


1
PDAs Construction ManagementLearning to
Evaluate Applications for the Field
  • Scott Fee, Assistant Professor
  • Construction Management Program
  • Minnesota State University, Mankato

2
Construction Management A major, a discipline,
an industry
  • MSU Program
  • 200 majors 40 graduates/year
  • 90 Building Construction 50/50 Commercial
    Residential
  • Others ? road, utility, subs, sales, etc.
  • MSU CM Grads
  • Dont perform trade work
  • Are often several levels away from the field
  • Learning to assess technology vs. application
    training

3
Tools at our Disposal
  • 16 iPAQ Pocket PCs
  • Nearly one per student
  • Wireless card
  • Wireless access point in the classroom
  • UCompass Educator wireless site

4
Assignment
  • PDA Product Review Project Guidelines
  • Topic A digital tool for PDAs (software,
    accessory, website, electronic catalog,
    newsgroup, etc.) designed to improve scheduling,
    estimating, or project management in the
    construction industry
  • Guidelines for Report
  • The report will consist of your PowerPoint
    presentation and extensive notes for each slide.
  • Include a minimum of five (5) reference sources
    properly cited
  • one source must be a personal contact (interview,
    e-mail, etc.)
  • one source must be from a peer-reviewed JOURNAL
    (very different from a magazine)
  • one source must be from an unbiased website
    related to your topic
  • Submit a hard copy of ten (10) slides of content,
    not including title, summary and bibliography
  • Include a properly formatted bibliography (use
    APA Format from Publication Manual of the
    American Psychological Association)

5
Student ExamplesfromCM 414Advanced
Scheduling Estimating
6
On-Site Project Management
  • L3Solutions Asia Wireless
  • Presenters
  • David Assumpcao
  • Patrick Barnett

7
Background
  • Ultra thin and stylish
  • Easy to expand and customizable
  • 206 MHz Intel StrongARM Processor
  • 64MB of storage memory
  • Infrared port (IrDA) 115k
  • USB cradle interface

8
Background
  • iPAQ vs. Palm

9
L3Solutions, LLC
  • WallCalc
  • Drywall
  • Paint
  • Wall Paper

10
L3Solutions, LLC
  • FloorCalc
  • Carpeting
  • Ceramic Tile
  • Resilient Tile
  • Hardwood Flooring

11
L3Solutions, LLC
  • Disadvantages
  • No price to finish estimate
  • The two programs are not combined
  • Advantages
  • Easy to use
  • Good customization
  • Great take-off numbers

12
REALMobileConstruction
  • Developed for Pocket PC
  • Application suite with 8 modules
  • Site Investigation
  • Foundation
  • Labor Management
  • Defect Inspection
  • Building Maintenance
  • Safety Checking
  • Asset Management
  • Project Management

13
REALMobileConstruction
14
REALMobileConstruction
Case Study
  • A leading construction company in China
  • Initially purchased 30 HP iPAQs
  • Improves inspection process
  • Paperless solution
  • Saves time

15
REALMobileConstruction
  • Advantages
  • Reduces time spent on paperwork
  • Accurate generation of reports
  • Up-to-date info
  • Open platform
  • Environmentally friendly
  • Disadvantages
  • Must train employees
  • Updates are more critical
  • Dependent on network
  • User acceptance
  • Difficult to contact

16
MSU A Modern University
  • President Davenport has set the goal for MSU of
    becoming the Modern University
  • Dynamic
  • Innovative
  • Collaborative
  • Technological
  • The wireless PDA project supports, and is
    supported by, the concept of the Modern
    University. . .

17
Modern University DYNAMIC
  • Far beyond textbook learning
  • In step with a rapidly changing industry world
  • Requires students to think on their feet learn
    how to learn quickly
  • Untested, requiring flexibility problem-solving

18
Modern University INNOVATIVE
  • Different than other CM programs
  • Preparation for Fees 6-month Prediction
  • Preparation for career challenges success -
    critical and creative thinking

19
Modern University COLLABORATIVE
  • Not focused on skill-building (technical
    literacy), but decision-making
  • Forces students to ask questions to others
    outside the classroom
  • Teamwork training

20
Modern University TECHNOLOGICAL
  • the obvious they're PDAs and they're the latest
    in technology
  • the less-obvious technology is seldom a solution
    it is a tool to extend human abilities
  • Students must realize they are the solution the
    technology (hardware, software, etc.) simply
    assists them in implementing what their wet-ware
    has come up with

21
Summary
  • How We Used Them
  • Advanced Scheduling Estimating Course
  • Accessed MSU Nokia Wireless Network
  • Accessed UCompass Classroom Mgmt. Platform
  • Assessed applications accessories for the
    devices
  • What We Learned
  • Viewer v. Creator
  • Many apps available, but . . .
  • Many are only in Beta form and . . .
  • Only a fraction of the of Palm apps available
  • Students can assess limitations areas for
    improvement . . .
  • That may affect our industrys expectations in
    the field
  • High potential (in time)
  • Whats Next
  • Industry-led problem-solving
  • Upgrades notepads
Write a Comment
User Comments (0)
About PowerShow.com