Title: Parallel Flow Visualization Data Requirements
1Parallel Flow Visualization Data Requirements
Jim Busbin Chairman, IDC Working Group
- NERC ORS Meeting
- Toronto, Ontario
- September 23-24, 2009
2Parallel Flow Visualization
- Presentation Topics
- Purpose
- Background
- Data Requirements
- Data Archive
- IDC Change Order 283, Revision 2
3Parallel Flow Visualization
4Parallel Flow VisualizationPurpose
- The Purpose Statement from the Parallel Flow
Visualization SAR states - The requested enhancements to the TLR procedure
in the Eastern Interconnection will improve the
wide-area view of Reliability Coordinators (RCs)
such that they better understand the current
operating state of the bulk electric system and
will result in the assignment of relief
obligations during periods of congestion that are
more representative of those actually
contributing to the congestion.
5Parallel Flow Visualization
6Parallel Flow VisualizationBackground
- May 6 NERC ORS Meeting in Indianapolis, IN.
- IDCWG was directed to
- Identify the minimum data set required to
achieve the required calculations by the
September 2009 ORS meeting - Identify the required changes to the IDC to
identify the GTL impacts - Recommend a vendor to perform the GTL
calculations for all EI RCs - Determine, in cooperation with the vendor, the
GTL calculation methodology - Identify to the ORS any additional items that
are required to incorporate GTL impacts - The IDCWG should target having proposed
recommendations to the ORS for the November
2009 meeting
7Parallel Flow VisualizationBackground
- IDCWG has discussed and identified requirements
to support Parallel Flow Visualization we
continue to evaluate these requirements - June 3-4 IDCWG Meeting
- Discussed charge given by ORS
- Initiated identification of requirements
- July 8-9 IDCWG Meeting
- Meeting held to discuss Parallel Flow
Visualization - Identification of requirements continued
- August 18-19 IDCWG Meeting
- OATI asked to revise Change Order 283 to include
requirements identified in July meeting this
modification will become Revision 2
8Parallel Flow Visualization
9Parallel Flow Visualization
- Data Requirements Introductory Notes
- Reference Generation-to-Load Reporting
Requirements whitepaper, January 2, 2009 - Generation-to-load flows will be calculated by
one vendor. Raw data used in the calculation
will be submitted to the vendor - Frequency of all data submission will be every
fifteen minutes unless otherwise noted by (?). - Data will be submitted to reflect current-hour
conditions and a projection of peak next hour
conditions. To be clear, each data submission
will contain data for the present hour and also
for the next hour
10Parallel Flow Visualization
- Data Requirements Categories
- Load and Losses
- Real Time Load Magnitude and Distribution
- Generation Output
- Real-Time Output vs. Static Values
- Flowgate Flows
- Provides Error Checking Capability
- Topology Updates
- Provides More Frequent Update of Topology and
- Additional Data
11Parallel Flow VisualizationData Requirements
- Load and Losses
- Total Real-Time BA Load
- Geographic Zones
- Conforming / Non-Conforming Zones
- Individual Bus Loads
- and Total for BA
- Real-Time Losses for Total BA
- Projection of Next Hour Total Peak BA Load
- Geographic Zones
- Conforming / Non-Conforming Zones
- Individual Bus Loads
- and Total for BA
- Projection of Next Hour Losses for Total BA
12Parallel Flow VisualizationData Requirements
- Generation Output
- Real-Time Generation Output
- Output for Each Generating Unit Shown in Model
- Net of Auxiliary Equipment / As Modeled
- Total Real-Time Generation Output for BA
- Projected Next Hour Generation Output
- Output for Each Generating Unit Shown in Model
- Projected Maximum Output of Unit in Next Hour
- Net of Auxiliary Equipment / As Modeled
- Total Projected Next-Hour Generation Output for
BA - Generating Unit Real-Time Upper and Lower Normal
Limits - Joint Ownership Identification ?
13Parallel Flow VisualizationData Requirements
- Flowgate Flows
- Actual real-time flow on each active flowgate
monitored element shown in the Book of Flowgates - Projection of next hour maximum flow on each
active flowgate monitored element shown in the
Book of Flowgates Projection of Next Hour Losses
for Total BA - Actual real-time flow on each active flowgate
contingency element shown in the Book of
Flowgates - Projection of next hour maximum flow on each
active flowgate contingency element shown in the
Book of Flowgates - Un-accounted for usage will be identified and
calculated as the difference between real time
flows and the summation of calculated tag
impacts, market flows and generation-to-load flows
14Parallel Flow VisualizationData Requirements
- Topology Updates
- Increase frequency of IDC update from SDX and
matrix calculation to every fifteen minutes - Outage updates submitted to SDX every fifteen
minutes
15Parallel Flow VisualizationData Requirements
- Additional Data
- Control Device Data Scheduled and Actual Flows,
Real-Time and Projected Next Hour - Phase shifting transformers
- DC lines
- Variable frequency transformers
- Dynamic Schedules Actual and projected
next-hour flows - Identification of pumped storage hydro units ?
16Parallel Flow VisualizationData Requirements
- Additional Data
- (NAESB / United States) Designated Network
Resource (DNR) generating units/plants - (NAESB / United States) DNR capacity
- (NAESB) Assignment of priorities for
generation-to-load (7-F versus 6-NN) - Net scheduled interchange
- Net actual interchange
- Individual actual tie-line flows
17Parallel Flow Visualization
18Parallel Flow VisualizationData Archive
- Impact archive will be added that saves
- Tag impacts
- Market flows
- Generation to load flows
- Un-accounted for usage
- Real-time flows by flowgate
- Archive to run around the clock not just when a
flowgate is in TLR - Suggest current calendar years and previous
years data be available on line - Suggest previous three years data be available
off-line
19Parallel Flow Visualization
- IDC Change Order 283,
- Revision 2
20Parallel Flow Visualization
Questions