Title: Plant Layout and Material Handling Spring 2002


1
Facilities Design The Layout
  • Class 13
  • March 6, 2002

2
Todays Topics
  • Review quiz 12
  • Review Class Schedule
  • When is what due?
  • Class Lecture
  • Quiz 13

3
Quiz 12
  • Area Allocation
  • Questions?

4
Layout
  • Introduction
  • Plot Plan
  • Master Plan
  • Plant Layout Procedure
  • Evaluation

5
Layout Introduction
  • Complex results of data collection and analysis
  • Only as good as the supporting data
  • Visual presentation of data
  • Applies to plot plans and master plans
  • Your biggest selling tool

6
Plot Plan
  • Shows buildings, parking lots, and driveways
  • Start with layout of the property with lot lines.
  • Place access roads.
  • Sources of water, power, gas, and phones.

7
Plot Plan (Cont.)
  • 4.Place building with front facing road and long
    side facing road (for expansion to rear)
  • 5.Show shipping and receiving (expansion?)
  • 6.Connect receiving and shipping to main road.
  • 7.Show employee and public entrances.
  • 8.Provide parking for visitors and employees.

8
Example Plot Plan
Power Line
Shipping
Future Parking
Expansion
Receiving
100 X 200
Office
Parking
9
Plant Layout Methods
  • Template and tape technique
  • 3D models
  • CAD (more and more common)
  • 10X property than building

10
Master Plan
  • The finished product of facilities design project
  • Templates
  • CAD
  • Advanced Computer Systems

11
RP Example Master Plan
2D
3D with Pro-E
12
Rating of Layout Techniques
13
Plant Layout Procedure
  • Locate Exterior walls
  • Exterior doors, columns, and aisles
  • One department at a time
  • Equipment
  • Facilities
  • Consider flow at every step
  • Material space

14
Evaluation
  • Minimize distance traveled
  • Maximize space utilization
  • Machine utilization ratio
  • Control material handling costs
  • JIT ratios
  • From-to chart
  • Cost evaluation

15
Minimize Distance Traveled
  • How many feet traveled automatically?
  • Gravity movement is free power.

16
2. Maximize Space Utilization
  • Aisle space (Percent aisle space)
  • Cube utilization (Percent cube used)
  • Machine space utilization

17
3. Machine utilization ratio
  • Automatic loading can increase machine operation
    time

18
4. Control Material Handling Costs
  • Material handling ratios
  • Manual moves/operation

19
5. JIT Ratios
20
6. Flow Techniques
  • Strive for quantitative
  • String Diagram
  • Multi-column process charts
  • From to charts

21
String Diagram
If we jump a department, place the line above the
circles.
R
A
B
C
S
Backtracking, the line is drawn under the circles
RBACS

Flow lines between adjacent circles will be from
middle of circle to middle of circle
RBS
22
Multi-Column Process Chart
Remember
23
From-to Chart
24
7. Cost Evaluation Technique
  • Total project cost
  • Operation costs
  • Etc
  • ROI

25