Indoor Air Quality and Construction - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

Indoor Air Quality and Construction

Description:

Prevent indoor air quality problems resulting ... CIR's (Credit Interpretation Request) ... Two Week Flush Out A project engineers dream come true, or is it? ... – PowerPoint PPT presentation

Number of Views:127
Avg rating:3.0/5.0
Slides: 14
Provided by: khos9
Category:

less

Transcript and Presenter's Notes

Title: Indoor Air Quality and Construction


1
Indoor Air Quality and Construction
  • Presented by
  • Kimberly Hosken

2
Indoor Environmental Quality
  • Prevent indoor air quality problems resulting
    from the construction process in order to help
    sustain the comfort and well-being of
    construction workers and building occupants.
  • Value added, soft dollar, marketing, market and
    leadership.

3
Seven LEED credits that impact the Contractor
  • Construction Indoor Air Quality
  • EQc3.1 During Construction
  • EQc3.2 After Construction/Prior to Occupancy
  • Low Emitting Materials
  • EQc4.1 Adhesives and Sealants
  • EQc4.2 Paints and Coatings
  • EQc4.3 Carpet
  • EQc4.4 Composite Wood
  • EQc5 Indoor Chemical and Pollution Source
    Control

4
EQc4.1 Adhesives and Sealants
  • Bidding What you need to know.
  • Buyout
  • Submittals
  • LEED Documentation
  • Why is this such a hassle?
  • Manage this on site, whats involved?

5
EQc4.2 Paints and Coatings
  • VOC Limits
  • Flat 50 g/l
  • Non Flat 150 g/l
  • CIRs (Credit Interpretation Request)
  • 12-22-03 The credit requirements and the green
    seal standard apply only to topcoat interior
    paint such as normally applied to walls.
  • 3-14 03 According to green seal primer is
    classified as a topcoat.
  • Document VOCs

6
EQc4.3 Carpet
  • Follow the specification
  • Document that you followed the specification.

7
EQc4.4 Composite Wood
  • Urea-Formaldehyde
  • Bid
  • Buyout
  • Build
  • Submittal
  • Effect on EQc3.2

8
EQc3.1 IAQ Plan During Construction
9
EQc3.2 IAQ After Construction Before Occupancy
  • Two Week Flush Out A project engineers dream
    come true, or is it?
  • Make sure its in the schedule

10
EQc3.2
  • 100 Outside Air
  • Can you do this?
  • What type of mechanical system do you have?
  • Are there other options?

11
EQc5 Indoor Chemical and Pollution Source Control
  • Entryway Grates
  • Deck to Deck partition with separate exhaust in
    areas of chemical use.
  • Copy machine rooms.
  • Drains plumbed for disposal of liquid waste.

12
Test Out
  • Air Quality Testing
  • Did you go for all 4 low VOC credits?
  • What about composite wood?
  • Cost
  • Timing
  • What if you fail?
  • Flush out anyway
  • Test again?

13
Have A Strategy
  • Dont resist that you are on a LEED project,
    embrace it, use it.
  • Dont overdue it. It isnt as hard as you might
    think.
  • Just buy into it, integrate it, and do the job.