Duke Energy Carolinas Quarterly Stakeholder Meeting - PowerPoint PPT Presentation

About This Presentation
Title:

Duke Energy Carolinas Quarterly Stakeholder Meeting

Description:

Daylight Savings Time Change. Designated Network Resources ... 'How-to' presentation for tagging across the Daylight Saving Time conversion. 4 ... – PowerPoint PPT presentation

Number of Views:190
Avg rating:3.0/5.0
Slides: 18
Provided by: netw152
Category:

less

Transcript and Presenter's Notes

Title: Duke Energy Carolinas Quarterly Stakeholder Meeting


1
Duke Energy CarolinasQuarterly Stakeholder
Meeting
  • Independent Entity Services
  • Tuesday, October 21, 2008
  • 200 to 300 p.m. ET

2
Agenda
  • Daylight Savings Time Change
  • Designated Network Resources
  • Transmission Service Annulments - Business
    Practice Recommendation
  • Stakeholder Questions and Comments

2
3
Daylight Savings Time Change
  • Duke Operates in Eastern Time (ET)
  • Tutorials/Users Guides on OATI Sites
  • TSR / On OASIS, under Help see the Table of
    Contents
  • DST Cutover Document
  • Tagging / On ETS, under HELP see
    Forms/Documentation
  • "How-to" presentation for tagging across the
    Daylight Saving Time conversion

4
Daylight Savings Time Change
  • To Create a TSR that Crosses the Fall Change (Two
    Options)
  • Option A
  • Start your Reservation in EDT 11-02-08 0000
  • End Reservation on or after 0200 on 11-03-08
  • (OASIS will default to in EST)
  • Option B
  • Create your TSR with a 25hr Profile
  • Start 11-02-08 and end 11-03-08
  • (OASIS will default with 2 HE 0200 one in ED
    one in ES)

5
Example TSR Option A
6
Example TSR Option B
7
Daylight Savings Time Change
  • To Create a Tag that Crosses the Fall Change
  • Fall Time Change creates a 25hr day
  • One Tag or Two Tags
  • Suggest Create Two Tags
  • One in Eastern Daylight Time
  • Begin with the hours 0000 through 0200 ED
  • One in Eastern Standard Time
  • Change the default TZ to ES
  • Misc / Misc User Options
  • Or within the tag change the TZ at the top of
    your tag to ES
  • Continue For the Hours 0100 through 0000 (2400)ES
  • Verify your tags by re-checking them in both ED
    and ES time.
  • Verify Profile Total
  • Verify Hours with respect to Standard and
    Daylight Time

8
Daylight Savings Time Change
  • Using Daylight Time Submitting One Tag
  • To use this option, user must set time to ED
  • Misc / Misc User Options
  • Begin _at_ 0000 on 11-02-08 through 0100 on
    11-03-08
  • Enter Tag Delayed
  • Change the default TZ to ES
  • Misc / Misc User Options
  • Reopen Tag
  • In Eastern Standard verify the end to be 0000 on
    11-03-08 (Note Start time will show 2300
    11-01-08 ES)
  • Revert your TZ back to ED
  • Re-open the Tag in Daylight time verify the hours
    and Profile are accurate.
  • In Eastern Daylight verify the end to be 0100
    on 11-03-08 (Note Start time will show 0000
    11-01-08 ED)
  • Submit your Tag
  • Verify your tags by re-checking them in both ED
    and ES time.
  • Verify Profile Total
  • Verify Hours with respect to Standard and
    Daylight Time

9
Designated/Undesignating Network Resources
  • Revised On System and Off System DNR Forms
  • FERC Order 890B Requirements
  • CFR 37.6 (Total Installed Capacity, Electrical
    Location, and Geographical Location)
  • Information Required Consistent with OATT 29.2
    and 30.3
  • Improved How to Guide / Instruction
  • Ease of Use
  • Forms Consolidated
  • On Off System / One Form

10
Designated Network Resources
  • OASIS Business Practices/Section 2ii-Pending
    Changes/Item (c)
  • http//www.oatioasis.com/DUK/DUKdocs/Designation_o
    f_Network_Resource_Request_Form.doc
  • October 27th Implementing New Form

11
Designation Form
12
Undesignation of DNRs
  • OASIS Business Practices/Section 2ii-Pending
    Changes/Item (c)
  • http//www.oatioasis.com/DUK/DUKdocs/Undesignation
    _of_Network_Resource_Request_Form.doc
  • October 27th Implementing New Form

13
Undesignation Form
14
Transmission Service Annulments
  • Planned Business Practice Change
  • Doesn't change current situations where
    Annulments are granted
  • Provides Audit Trail for both the Customer and
    Provider
  • Documents actual TSR requested for Annulment
  • Recommended Business Practice See Appendix A
  • Require an e-mail requesting the Annulment
  • Please Annul PtP / Non-Designated Network
    Select One TSR Enter TSR , due to Enter
    Reason. This reservation has been replaced by
    TSR Enter Replacement TSR .
  • I confirm that this reservation is NOT scheduled
    or upon granting the annulment, the TAG will be
    Terminated, Withdrawn, Canceled, or adjusted to
    0.

15
IE Proposed Next Steps
  • Proposed Next Quarterly Stakeholder Meeting
  • Tuesday, January 20, 2008 2 p.m. to 3 p.m. ET
  • Known Topics
  • Resale
  • Transfers
  • More on Network Service
  • Customer Suggested Topics?
  • This is the forum for discussing customer survey
    topics and emergent topics (Upcoming changes,
    stakeholder input)

15
16
Questions / Feedback?
16
17
Appendix A
Write a Comment
User Comments (0)
About PowerShow.com