2DFIMDP
Concepts and Components
3DIVERSIFIED FARM INCOME AND MARKET DEVELOPMENT
PROJECT (DFIMDP)
World Bank (WB) Sector Investment and
Maintenance (SIM) Loan
Loan No. 7236-PH
Loan Signing Date
August 24, 2004 Loan Effectivity
Date October 29,
2004 Loan Completion Date
December 31, 2008 Loan Closing Date
June 30, 2009
4Background on the DFIMDP
1. DFIMDP is designed to rationalize, give
proper direction and set a time-bound
implementation plan.
2. It is a budget support loan that
i) assures the availability of resources
ii) help facilitate the change in public
expenditure system of the DA and
iii) is fiscally responsive
5Background on the DFIMDP
3. Expected outcomes
i) establishment of an up to date market
information system
ii) a more transparent and demand based system
for market investments
iii) streamlined and more effective regulatory
services
iv) greater emphasis on market factors in the
design and implementation of
research/training programs and
- v) better prioritization of budgetary resources
for DA core functions.
6 Overall Goal To stimulate rural growth and
farmer incomes by enhancing competitiveness of
Philippine agriculture and fisheries and
market-oriented private sector-led investment
- Objectives
- Transform the Department into a more service and
market-oriented agency - Arrest and reverse the declining competitiveness
of the agriculture and fisheries sector
- Focus Areas
- RFU-CAR (Benguet)
- RFU-6 (Iloilo and Capiz Coastal Zone)
- RFU-7 (Cebu and Negros Oriental)
- RFU-10 (Bukidnon)
7PROJECT COMPONENTS
- Component 1 (Part A) Market Development Services
- (AMAS, AFIS, BAS, NAFC, ITCAF)
- Component 2 (Part B) Market Development
Investments - (Regional Field Units)
- Component 3 (Part C) Quality Assurance Systems
Strengthening - (BAFPS, BPI, BAI, BFAR, NMIS, FPA)
- Component 4 (Part D) Market-related Technology
Development and Dissemination - (BAR, ATI, BPRE)
- Component 5 (Part E) Budget allocation and
Planning - and Project Management
- (PS, PRS, PDS, FMS, NAFC, FOS)
8PROJECT COMPONENTS
- Component 1 (Part A) Market Development Services
- Establishment and operation of the
Agriculture and Fisheries Market Information
Systems (AFMIS) and local market information
systems
- Strengthening the capacity of
the Agriculture Marketing
Assistance Service (AMAS) of DA
- Enhancement of DAs web sites and
improvement of the National Information
Network of DA,
9PROJECT COMPONENTS
- Component 2 (Part B) Market Development
Investments
- Provision of Sub-grants to eligible
Beneficiaries for the implementation of
market development Sub-projects in the
focus areas.
10PROJECT COMPONENTS
- Component 3 (Part C) Quality Assurance Systems
- Strenghtening
- Strengthening the capacity of DA in
increasing farmer access to certified seeds
and horticultural planting materials and in
effectively enforcing the Borrowers laws and
regulations governing intellectual property
rights.
11PROJECT COMPONENTS
- Component 3 (Part C) Quality Assurance Systems
- Strenghtening
- Strengthening the functions of DAs regulatory
agencies
- Strengthening the capacity of DA to operate
and maintain its laboratories and assisting
DA in (i) updating guidelines for
independent accreditation of public and
private laboratories and for private sector
participation in laboratories and
related services (ii) introducing commercial
practice in the management of its
laboratories (iii) developing financing
mechanisms to sustain the operations of
its laboratories and (iv) rehabilitating and
upgrading its laboratory buildings and
facilities
12PROJECT COMPONENTS
- Component 3 (Part C) Quality Assurance Systems
- Strenghtening
- Supporting DA in streamlining its quarantine
and inspection processes, including
(i) consolidating the quarantine and inspection
responsibilities (ii) upgrading the
quarantine and inspection facilities and
equipment and providing training to inspectors
at major ports (iii) developing quarantine
protocols designed to expedite the
imports and exports clearance process and
(iv) establishing a computerized database for
the quarantine service and linking
said database with the customs computer
system.
13PROJECT COMPONENTS
- Component 4 (Part D) Market-related Technology
Development and Dissemination
- Strengthening the Competitive
Research Grant scheme, including (i)
provision of Competitive Research Grants to
Competitive Grant Beneficiaries for
market oriented agriculture technology
development and (ii) provision of training to
Competitive Research Grant
Beneficiaries in research formulation and market
related issues.
- Strengthening the primary role of the
Agricultural Training - Institute (ATI).
14PROJECT COMPONENTS
- Component 5 (Part E) Budget allocation and
- Planning and Project Management
- Strengthening the capacity of DA in planning
and prioritizing - budget resources in line with its core
functions and its Major - Final Outputs (MFOs).
- Supporting policy studies and advocacy actions
on issues, like (i) the need to reform
cabotage regulations (ii) reducing
transportation costs of collection and
distribution of agricultural products
and (iii) comparison of agricultural inputs
with those in other Asian countries.
- Strengthening the capacity of DA in managing,
monitoring and evaluating the Project.
15FINANCIAL PLAN (US Million)
16ELIGIBLE PROPONENTS OF INVESTMENT SUPPORT
17(No Transcript)
18(No Transcript)
19TYPES OF PROJECTS TO BE SUPPORTED BY THE DFIMDP
20(No Transcript)
21(No Transcript)
22(No Transcript)
23COST SHARING SCHEME FOR SUB-PROJECTS
24LGU Cost Sharing Schedule
The counterpart shall be based on the total cost
consisting of i) DED ii) Construction Cost and
iii) Mgt. Supervision
25Private Sector Cost Sharing Schedule
The cost-sharing arrangements for the Private
Sector groups shall be based on capitalization
and categorized as follows a) Micro P3.0M
below b) Small P3.0M to P15.0M c) Medium
P15.0M to P100.0M
26 I. Effectiveness of DFIMDP
Implementation in Region VI
27 1. Project System
- In order to ensure efficient and effective use of
resources, DFIMDP Operations Manual sets forth
the viability criteria for the appraisal of the
DFIMDP sub-projects to be funded. These are the
following - - market potential
- - technical feasibility
- - economic and financial viability
- - environmental soundness and,
- - social assessment
28VIABILITY CRITERIA FOR THE APPRAISAL OF DFIMDP
SUB-PROJECTS
29(No Transcript)
30(No Transcript)
31(No Transcript)
322. Amount/Level of Resources
vis-à-vis the Project Outputs
- DFIMDP is designed to rationalize, give proper
direction and set a time-bound implementation
plan. One of the expected outcomes of the project
is better prioritization of budgetary resources
in line with its core functions and its Major
Final Outputs (MFOs). With that, it is assured
that the resources invested in the project
justify the project outputs.
33- The project supports the government-wide
initiative on improvement of public expenditure
management, a process that seeks to improve
efficiencies in public resource allocation and
utilization, and better linkages between planning
and budgeting.
34- Before the sub-project is implemented, it has to
undergo review and evaluation by the DFIMDP
Regional Technical Secretariat (RTS) anchoring
appraisal of the projects on the viability
criteria prescribed by the Operations Manual. - If the project has met the criteria, then RTS
will recommend such project to the DFIMDP
Regional Project Advisory Board (RPAB) which in
turn will deliberate on the feasibility,
viability, doability, implementability and
cost-effectiveness of the project, also basing
its approval on the viability criteria for
appraisal of DFIMDP sub-projects.
35- If the project has met the criteria, then RTS
will recommend such project to the DFIMDP
Regional Project Advisory Board (RPAB) which in
turn will deliberate on the feasibility,
viability, doability, implementability and
cost-effectiveness of the project, also basing
its approval on the viability criteria for
appraisal of DFIMDP sub-projects. - Hence, it is assured that the amount/level of
resources spent justify the project output.
363. Delivery of Specific Outputs
- For the smooth implementation of DFIMDP
sub-projects and for clarity purposes as to who
are supposed to deliver specific outputs, the
following institutional arrangements were
prescribed by the Operations Manual
37INSTITUTIONAL ARRANGEMENTS
- I. Project Advisory Board (PAB)
- Provide policy direction and guidelines
- Recommend to ExeCom investments, fund
utilization and WFPs of IAs/Us.
- II. Technical Secretariat (TS)
- Provide coordination support for the technical
and financial management of the Project - Monitor and evaluate implementation activities
- Facilitate the conduct of Project Review
Missions.
- III. Regional PAB
- Approve proposed market investment sub-projects
- Recommend to PAB the regional WFPs.
- IV. Regional TS
- Review and recommend to RPAB proposed market
investment sub-projects - Monitor and evaluate implementation of
sub-projects.
384. Timeliness of the Delivery of Project Inputs
- In the delivery of project inputs, the agency is
guided by our Work and Financial Plan which
reflected the agencys programs, activities and
projects by Major Final Outputs (MFOs) with their
corresponding physical and financial targets
broken down by quarter. Also, we have a detailed
implementation plan reflecting the monthly
activities also with their respective physical
and financial targets.
39- Every month-end, we are submitting our Physical
and Financial Accomplishment Report and other
required reports to the Central Office and
oversight agencies which includes NEDA, hence,
performance could be assessed whether the
physical and financial targets have been met as
scheduled. - Every quarter, we are submitting our quarterly
financial monitoring report and other required
reports to the World Bank, NEDA and also other
oversight agencies.
40- In the national level, PAB meetings are being
held regularly to monitor the timely delivery of
inputs and discuss policy matters which affect
the speedy and smooth implementation of the
project. - Review Missions are being conducted by the World
Bank to review the performance of each
participating agency whether targets/outcomes
have been met/attained as expected.
415. Participation of Management
- The management is responsible for the review and
evaluation of the projects proposed by the
proponents renders technical assistance to the
project-beneficiaries reviews plans and
detailed engineering designs and bidding
documents submitted by the proponents, conducts
monitoring activities of the projects being
implemented by the proponents releases funds
based on work accomplishments on a progress
billing system.
426. Multiplier Effects
- The project has multiplier effects such as job
generation increased economic activities in the
locality where the project is located improved
standard of living of the residents in the
locality easy access to education and health
services increased real estate value helps
improve peace and order condition in some
localities where the project is located and more
projects are being implemented because of the
counterparting scheme.
43II. REPLICABILITY
441. Replicability of the Project Process
- The project process is contained in the DFIMDP
Operations Manual which serves as guide to the
users and implementers of the project for clarity
and uniformity in the implementation. - The DFIMDP project process may be applied to the
implementation of the regular projects of the
agency such as the identification of the projects
which should be need-based and demand-driven
which resulted from stakeholders consultation
and participative planning.
45- The preparation of the project proposal/
feasibility study is also being used by other
programs/projects of the agency. Funds will not
be released to the LGUs and private sector
proponents without their proposal and work and
financial plan - The cost-sharing arrangement is also being
applied to some programs/projects of the agency
such as the Corn Facility Program LGUs and
private sector are also required to put up their
counterpart. - Hence, the DFIMDP project process may be easily
replicated.
462. Replicability in Other Areas
- DFIMDP is being implemented nationwide.
Initially, there are only four focus regions,
CAR, DA RFU VI, VII, and X. Now, it covers all
other regions.
473. Creation of Interest
- The project created interest from other
institutions like the Non-Governmental
Organizations (NGOs), Peoples Organizaitons
(POs), Local Government Units (LGUs), and State
Universities and Colleges (SUCs). - Several proposals have been received from these
institutions/organizations for the availment of
projects under DFIMDP.
48III. Participation
491. Extent of Involvement of the
Stakeholders/Clients
- The stakeholders/clients have been largely
involved from the planning stage up to the
monitoring and evaluation phase of the project. - Call for proposals is being undertaken by the
agency for the proponents to submit their
proposal based on their needs and priorities.
50- Said proposals are being incorporated in the
Budget Proposal of the agency and the Work and
Financial Plan. These proposals should be in
consonance with the Ten-Point Legacy Agenda,
Medium-Term Philippine Development Plan,
Millenium Development Goals, priorities and
thrusts of the agency, and included in the Annual
Investment Plan.
51- Procurement is being done by the project
proponents. - Implementation is also being undertaken by the
proponents. They undertake construction,
supervision, quality control and progress
monitoring. The agency provides only technical
assistance.
52- Progress monitoring is the responsibility of the
project proponent. - Project proponent conducts field inspection and
submits report to the DA RFU VI.
533. Feedback Mechanism
- Focused Group Discussions have been conducted to
identify the hindering factors which impede the
speedy implementation of the project, and
facilitating factors which expedite project
implementation. The activity was attended by the
project proponents represented by the Mayors and
other LGU officials, Coop Chairs and concerned
officials of the cooperative.
54- Performance Assessments have been conducted
regularly to assess the performance and to serve
as feedback mechanism. Participants to the
activity are Representatives of the LGUs, Office
of the Congressmen, private sector, DA RFU VI
Program Coordinators, Division Chiefs, Chiefs of
various operating units and all other concerned
officials.
55IV. Demand-Driven-ness
561. Development/Community Issues
- Some development/community issues which have been
responded to by the project are the following - - job generation
- - access to education and health
- - peace and order condition
- - poverty alleviation concerns
- - standard of living
- - good governance
572. Needs Assessment Process
- Sub-projects have been identified by the
proponents themselves based on their local needs
through stakeholders consultations, workshops,
surveys, etc. - Shown next slide is the conceptual framework for
sub-project selection.
58Conceptual Framework for Sub-Project Selection
593. Baseline Data
- Baseline data is being considered in project
design. The proponent is required to submit a
duly accomplished Baseline Information Sheet
which is one of the requirements attached to the
Project Proposal submitted by the proponent.
60- The Baseline Information Sheet contains the
- following major information
- - Proposed Sub-Project Title
- - Proponent
- - Basic Income Profile of the Sub-Project
Area - - Supply Information (on commodity focus of
the sub-project) -
-
61- - Market Information
- - Technical Description of Sub-Project
- - Financial Support
- - Socio-Economic Information Related to
Proposed Sub-Project
62V. Process Orientation
631. Project Documentation
- Reports are being submitted monthly to the DA
Central Office, NEDA, DBM and other oversight
agencies. - Quarterly Monitoring Reports are being submitted
to the World Bank and oversight agencies. - Accomplishments are included in the Annual Report
of the agency. - Review Missions are being conducted regularly by
the World Bank to assess the performance of each
participating agency. Aide Memoire is being
issued to document their observations and their
comments/ suggestions/ recommendations for
improvement in project implementation.
642. Advocacy Component/Activities
- Advocacy and Information Activities is included
as one of the major activities of DFIMDP. Every
year, funds are allocated for the purpose. - Advocacy and information activities involved the
tri-media, print, radio and TV. IEC materials
are being distributed press/photo releases are
being made radio programs are being conducted
also, School-on-the-Air is conducted and TV
programs are likewise conducted.
65- As part of the advocacy and information
activities, Barangay Agriculture Information
Centers (BAIC) are being assisted through the
provision of reading materials. - Briefings/orientations on DFIMDP Concepts and
Operations Manual are also conducted for the
information of the prospective proponents and the
public. -
663. Process Flow Chart/Manuals
- DFIMDP implementers are being guided in its
project implementation by the DFIMDP Manual of
Operations. - Some of the major contents of the manual are the
following institutional arrangements
conceptual framework for project selection
process flow chart for sub-project
identification, approval and implementation
viability criteria for the appraisal of
sub-projects eligible proponents of investment
support types of projects to be supported by
the DFIMDP cost-sharing arrangements, etc.
67- Reports are being prepared monthly and quarterly
and submitted to the DA Central Office, World
Bank, COA, NEDA, DBM and other oversight
agencies. - DA RFU VI has its own website and pertinent
information relative to DFIMDP could be found on
such website such as accomplishment reports, work
and financial plan, etc.
68- DFIMDP has available process flow chart for
sub-project identification, approval and
implementation. - Shown next slides is the process flow chart for
DFIMDP sub-project identification, approval and
implementation.
69(No Transcript)
70(No Transcript)
71(No Transcript)
72VI. Originality
731. Uniqueness of the Project
- The special features of DFIMDP are the following
- - no additional budget
- - no additional project
- - individual agency/RFU budget
- - no additional manpower
- - only cash support is being provided by the
- World Bank
- The above special features make the project
unique and different from the other projects.
74- For the budget cover, approved budget by the
agency is being utilized involves only tagging
of market-oriented activities which consists of
the core or vital functions/ services of the
agency - Implemented with counterpart funds/equity from
the proponents in accordance with the prescribed
cost-sharing arrangements, hence, a pioneering
application of an existing technology.
752. Project Initiation
- DA Central Office initiated the project with DA
RFU VI as one of the focus regions. Other focus
regions are CAR, DA RFU VII and X.
763. Performance of DA RFU VI
- Implementation of DFIMDP in Region 6 is strong as
well as its financial management as highlighted
by the World Bank in its aide memoire for the
Review Mission conducted last February 4-8, 2008. - The first to implement and complete a sub-project
in the whole Philippines, i.e. the FMR
rehabilitation of Poblacion Tabuc-Pawa-Buntod
Road, Panay Capiz with total project cost of P5
million (LGU Counterpart - P3 million DA Grant -
P2 million).
77- DA RFU VI has also the highest disbursements
among the focus regions and also in terms of
program contract. - Shown next slides is the physical and financial
performance of DA RFU VI.
78DFIMDP IMPLEMENTATION IN REGION VI
79HIGHLIGHTS OF FINANCIAL ACCOMPLISHMENTAs of
September 30, 2008
- DFIMDP
- Summary of Allotment, Obligations and
Disbursements - As of September 30, 2008
- (P000)
- 2004
2005 2006 2007
2008 Total -
- Allotment 215.0 3,516.5
11,373.0 14,594.0 18,072.3
47,770.8 - Obligation 215.0 3,516.5
11,373.0 14,594.0 17,474.6
47,173.1 - Disbursements 215.0 3,205.1
9,593,8 10,610.1 9,565.7
33,189.7 - Total NCA Recd
- (LP)
20,713.4 - Total Program
- Contract 215.0 3,516.5
12,253.0 14,594.0 19,629.0
50,207.5 -
80Major Accomplishments as of September 30, 2008
- A. CY 2005 Program Contract
- 1. Rehabilitation of Poblacion Tabuc-Pawa
Buntod Road at Panay, Capiz (4.3 km.) 100
completed - DA Grant - P2 million (40)
- LGU Counterpart P3 million (60)
- Total - P5 million
-
81Farm to Market Road, Pan-ay, Capiz
82Results of the Intervention/Project Impact -
- - directly benefited 911 households
of - four barangays Poblacion Tabuc, Pawa,
- Buntod and Bonga with a population
of - more or less 4,000
- - increase in income of the farmers
- - reduction of postharvest losses
- - shortening of travel time
- - increase in production
-
83Results of the Intervention . . .
- - increase in the economic activities in
the community - - more concrete structures erected
- - increase in the real estate value
- - reduction in vehicle operating cost and
- transportation cost
- - accessibility of health and education
services - - generation of jobs from the project
- - easy marketing of the produce
84- 2. One (1) unit Mechanical Dryer already
procured and delivered to Zarraga Multi-Purpose
Cooperative, Zarraga, Iloilo - Total Project Cost P325,000
- DA Grant - P130,000 (40)
- Coop Counterpart- P195,000 (60)
85Zarraga Flatbed Dryer
86- Results of the Intervention/benefits derived from
the project - - being used primarily for the palay trading
business of the cooperative - - source of additional income of the
cooperative - - postharvest losses reduced by at least 5
thus generating higher income for the
farmer-members
87- 3. One (1) unit Flatbed Dryer already procured
and delivered to TQB Multi-Purpose Cooperative,
Maayon, Capiz - Total Project Cost P350,000
- DA Grant - P175,000 (50)
- Coop Counterpart- P175,000 (50)
88Maayon Flatbed Dryer
89- Results of the Intervention/benefits derived from
the project - - being used primarily for the palay/corn
trading business of the cooperative - - source of additional income of the
cooperative - - postharvest losses reduced by at least 5
thus generating higher income for the
farmer-members
90- 4. Improvement of FMR (wheelpath),
- Tubungan, Iloilo
- Brgy. Batga 50 m. 100 completed
- Brgy. Jona 100 m. 100 completed
- Brgy. Badiang B 50 m. 100 completed
- LGU Counterpart - P333,000 (50)
- DA Grant - 333,000 (50)
- Total Project Cost - P666,000
-
91Results of the Intervention/ Project Impact
- - increase in farmers income
- - reduction of postharvest losses by at
least 5 - - shortening of travel time
- - increase in production
- - increase in the economic activities in
the community -
92- - reduction in vehicle operating cost and
transportation cost - - accessibility of health and education
services - - generation of jobs from the project
- - far-flung barangays become easily
accessible - - helps in the improvement of peace and
order condition - - easy marketing of the produce
93Wheelpath, Tubungan, Iloilo
94- B. CY 2006 Program Contract
- 1. Construction of Packing House -(Capiz
Multi-Purpose Cooperative, Inc., Roxas City)
100 completed - Coop Counterpart - P750,000
(60) - DA Grant -
500,000 (40) - Total -
P1,250,000 -
- Cash equity provided by the Provincial
Government of Capiz amounting to P750,000.
95Results of the Intervention/Benefits Derived from
the Project
- - increase in the income of the members
- - provision of jobs to the residents
- - reduction of postharvest losses
- - for quality control purposes of cutfoliage
being exported to Japan and other countries
96Packing house, Roxas City
97Washing Area, Packing house, Roxas City
98 Weighing of boxes containing cutfoliage for
export to Japan by Plant Quarantine Personnel at
the Packing House
99- 2. FMR Rehab (wheelpath), Tubungan,
- Iloilo
- Brgy. Lanag Norte - 90 m 100
- Brgy. Bikil-Molina 90 m 100
- Brgy. Ten. Benito 90 m - 100
- LGU Counterpart - P 500,000 (50)
- DA Grant - 500,000 (50)
- Total - P1,000,000
-
100Results of the Intervention/Project Impact
- - increase in farmers income
- - reduction of postharvest losses by at
least 5 - - shortening of travel time
- - increase in production
- - increase in the economic activities in
the community - - reduction in vehicle operating cost and
transportation cost -
101- - accessibility of health and education
services - - generation of jobs from the project
- - far-flung barangays become easily accessible
- - helps in the improvement of peace and order
condition - - easy marketing of the produce
102- 3. FMR Rehab, Sitio Utod, San Miguel,
- Dumalag, Capiz (1.1km) 100 completed
- LGU Counterpart - P1,218,000 (60)
- DA Grant - 812,000 (40)
- Total Project Cost - P2,030,000
-
103Results of the Intervention/Project Impact
- - increase in farmers income
- - reduction of postharvest losses by at
least 5 - - shortening of travel time
- - increase in production expansion of
- plantation/production areas
- - increase in the economic activities in the
community - - reduction in vehicle operating cost and
transportation - cost
- - accessibility of health and education
services - - generation of jobs from the project
- - serves as link to goal 1 areas
- - students need not take off their shoes
in going to school - - easy marketing of the produce
104- FMR Rehab, Pres. Roxas, Capiz
- (Cabug-Cabug (BOAK) Sitio Matinog-Brgy.
Carmencita Road, Brgy. Cabug-Cabug) 100
completed - LGU Counterpart - P 996,000 (60)
- DA Grant - 664,000 (40)
- Total Project Cost P1,660,000
-
105Results of the Intervention/Project Impact
- - increase in farmers income
- - reduction of postharvest losses by at
least 5 - - shortening of travel time
- - increase in production expansion of
- plantation/production areas
- - increase in the economic activities in the
community - - reduction in vehicle operating cost and
transportation cost - - accessibility of health and education
services - - generation of jobs from the project
- - easy marketing of the produce
106Farm to Market Road, Pres. Roxas, Capiz
107- C. Program Contract CY 2007
- 1. Footpath Rehab Tigum-Lapayon,
- Pavia, Iloilo (2km) 100 completed
- LGU Counterpart P1,200,000
- DA Grant - 800,000
- Total Proj. Cost - P 2,000,000
-
108Results of the Intervention/Project Impact
- - increase in farmers income
- - reduction of postharvest losses by at
least 5 - - shortening of travel time
- - increase in production
- - increase in the economic activities in the
community - - reduction in vehicle operating cost
and transportation cost - - accessibility of health and education
services - - generation of jobs from the project
- - easy marketing of the produce
109Farm to Market Road, Tigum-Lapayon, Pavia, Iloilo
110- 2. One (1) unit Hauling Truck (San Enrique MPC,
San Enrique, Negros Occ.) 100 procured and
delivered - DA Grant - P250,450 (50)
- Coop Counterpart - P250,450 (50)
- Total - P500,900
111- Results of the interventions/benefits derived
from the project - - primarily utilized in the palay trading
business of the cooperative - - source of additional income for the
cooperative - - job generation
112Hauling Truck, San Enrique MPC, San Enrique,
Negros Occidental
113- 3. One (1) unit Hauling Truck for the Mambusao
Federation of Farmers Cooperative, Mambusao,
Capiz 100 procured and delivered - DA Grant - P175,000
- Coop Counterpart - P175,000
- Total - P350,000
114- Results of the intervention/benefits derived from
the project - - primarily utilized in the palay trading
business of the cooperative - - source of additional income for the
cooperative - - job generation
115 Hauling truck, Mambusao Federation of
Farmers Coop., Mambusao Capiz
116- D. CY 2008 Program Contract
- 1. One (1) unit Hauling Truck for the
Negrosanon Economic Development MPC 100
procured and delivered - DA Grant - P250,450 (50)
- Coop Counterpart - P250,450 (50)
- Total - P500,900
117- Results of the intervention/benefits derived from
the project - - primarily utilized in the palay trading
business of the cooperative - - source of additional income for the
cooperative - - job generation
118Hauling truck, NEED MPC, Sagay City
119Ongoing Projects
- Rehabilitation of FMR/Footpath at Brgy. Bandila
Toboso, Negros Occidental 20 completed - Construction of Bagsakan Center (Iloilo Mango
Growers Cooperative, Leganes, Iloilo) 84
completed
120Bagsakan Center, Leganes, Iloilo
121- Flatbed Dryer (Pototan Seed Growers Cooperative,
Pototan, Iloilo) for delivery this October,
2008.
122- Small Farm Reservoir (SFR), Bingawan, Iloilo
50 completed (56 units completed out of 100
units)
123Small Farm Reservoir, Bingawan, Iloilo
124Support Activities in Furtherance of the Market
Development Investments Component
- 1. Procurement Sem-Workshop (2 batches, Iloilo
and Negros Occ.) was conducted to equip the
proponents BAC members, BAC Technical Working
Group, procurement officers and other personnel
involved in procurement with the necessary skills
and knowledge in procurement and to update them
of the amendments/latest issuances relative to
procurement matters.
125- 2. Quarterly Performance Assessment (1st
2nd quarters) was conducted with participants
representing all divisions/ sectors in order
to apprise all implementers and key players of
the status of fund utilization vis-à-vis physical
accomplishment and for purposes of transparency
served as feedback mechanism for the
management so that it could act immediately
on the problems/issues presented.
126- 3. Project visitation of RPAB members last
February, 2008 in the following project sites - Roxas City Packing House (Capiz Multi-Purpose
Coop, Inc.) - Panay, Capiz FMR Rehab
-
127- 4. Provincial Planning and Budget Consultations
were conducted by province (6 batches) to call
for proposals for CY 2009 and to brief them of
the agricultural situationer of DA RFU VI
including DFIMDP attended by the LGUs, Office
of the Congressmen, and private sector.
128- 5. Conduct of a briefing on the major programs
and projects of the DA attended by the
representatives of the Congressmen, LGUs, private
sectors, and other stakeholders for the purpose
of fostering stronger partnership with the
abovementioned stakeholders for a speedier and
successful project implementation.
129- 6. Sharing of RFU VI Good Practices in project
implementation done last February, 2008 during
the Year-End Performance Review of the
Locally-Funded Projects in Dipolog City, and in
some other Mindanao regions such as Region IX,
XI, XII, and XIII in compliance with the
recommendation of the NEDA and the WB.
130- 7. Conduct of Regional Agri-Fair in Bacolod City
this October with the theme, Better Harvest and
Market Access The Challenge to Food
Sufficiency, hosted by the Province of Negros
Occidental and highlighted by the awarding of the
Agri-Achievers of Negros Occidental.
131- 8. Entry of DA RFU VI (Ivan Jun Suoribio) to the
National Poster Making Contest was adjudged 1st
place in connection with the celebration of the
World Food Day with the theme World Food
Security The challenges to climate change and
bioenergy. information activities being funded
by DFIMDP.
132VII. Recognition/Commendation Received
133Awards/Recognition/Commendation Received
- Implementation of DFIMDP in Region 6 is strong as
well as its financial management as highlighted
by the World Bank in its aide memoire for the
Review Mission conducted last February 4-8, 2008. - The first to implement and complete a sub-project
in the whole Philippines, i.e. the FMR
rehabilitation of Poblacion Tabuc-Pawa-Buntod
Road, Panay Capiz with total project cost of P5
million (LGU Counterpart - P3 million DA Grant -
P2 million).
134- DA RFU VI has also the highest disbursements
among the focus regions and also in terms of
program contract.
135Good Practices of DA RFU VI
- 1. Strong linkage and coordination, harmonious
relationship and collaborative efforts among the
private sector, peoples organizations and the
LGUs which result to effective and efficient
implementation of the projects - Clear delineation of the roles and
responsibilities of each party as set forth in
the Operations Manual, the Memorandum of
Agreement and other project documents.
136- 2. Cost-effective inasmuch as the cost per unit
is lower than what is being provided in the
Operations Manual for instance, the Manual
provides that for Farm-to-Market Road
rehabilitation (sand and gravelling), the cost
per kilometer is P2 million but the actual
project cost is below P2 million per kilometer. - Expected outcomes should be met by concerned
parties.
137- 3. Projects are being identified by the
proponents themselves through consultations,
dialogues, assemblies, fora and other means. - Participative planning is being employed by the
proponents to come up with a need-based project
based on their local needs and priorities as
shown in the conceptual framework for project
identification and selection.
138- 4. Replicability - projects can be easily
implemented in other areas/conditions such as
farm-to-market roads, bagsakan centers, trading
posts, packing house, and others - Implemented on a cost-sharing arrangement with
the proponent, hence, less cost on the part of
the government and results to more projects for
implementation due to additional funds coming
from the proponents.
139- 5. Transparent in project implementation
information on project implementation widely
disseminated - Project implementation results are being
submitted to concerned authorities like NEDA,
World Bank, DA Central Office, COA and other
agencies - Involvement of all the key players even in the
planning stage of the project for implementation - Information dissemination are being undertaken
like the conduct of briefings, orientation,
consultations, workshops, focused group
discussions and other means to widely disseminate
information - Operations Manual serves as guide to users to
expedite project implementation and for purposes
of clarity and uniformity in project
implementation. -
-
140- 6. Participative planning/public consultations
are being conducted with the Local Government
Units, private sector, peoples organizations
like cooperatives and other key stakeholders
participating in such activities. - Focused Group Discussions are also being
conducted to serve as feedback mechanism and to
identify the hindering and facilitation factors
which affect the success/failure of project
implementation - Performance Reviews/Assessments/Financial
Analysis/Review Missions being conducted to
assess the project performance and to institute
corrective/remedial measures to address
immediately the issues/concerns/ problems in
project implementation - Project visits being undertaken to monitor actual
physical performance and evaluation of the
project impact.
141- Project is very unique no additional budget
from the government, no additional manpower, no
additional compensation only cash support is
being provided by the World Bank. - For the budget cover, approved budget by the
agency is being utilized involves only tagging
of market-oriented activities which consists of
the core or vital functions/ services of the
agency - Implemented with counterpart funds/equity from
the proponents in accordance with the prescribed
cost-sharing arrangements, hence, a pioneering
application of an existing technology.
142 END OF PRESENTATION MARAMING SALAMAT!!!
Lets start the open forum.
and discussion.