AXIS programme status - PowerPoint PPT Presentation

About This Presentation
Title:

AXIS programme status

Description:

IFCA to deliver to XID-DB: Reduced, wavelength and flux calibrated spectra: (object, object sky and error ... EPIC-pn exposure time 5 ks |b| 20 deg ... – PowerPoint PPT presentation

Number of Views:41
Avg rating:3.0/5.0
Slides: 13
Provided by: XavierB9
Category:
Tags: axis | epic | programme | status

less

Transcript and Presenter's Notes

Title: AXIS programme status


1
AXIS programme status
  • Data
  • Observations reduction
  • Archival/delivery to XID-DB
  • Science
  • Imaging programme
  • Spectroscopic ids
  • Public output
  • Future concerns

2
AXIS Observations
3
AXIS Data reduction status
4
AXIS archival and ingestion into XID-DB
  • Imaging data. IoA to deliver to XID-DB directly
  • Reduced images
  • Source lists
  • Ingestion files
  • Spectroscopic data. IFCA to deliver to XID-DB
  • Reduced, wavelength and flux calibrated spectra
    (object, objectsky and error arrays in
    FITS/ASCII format)
  • Calibration spectra (spectrophotometric
    standards)
  • Ingestion files

We have to make sure that the data becomes public
simultaneously with publications!
5
AXIS imaging programme
(includes M. Watsons PATT Imaging Programme R.
McMahons advance observations)
Optical INT/WFC Near IR INT/CIRSI
6
AXIS identifications(as of March 1, 2001)
Plus another gt 50 spectra (mostly
ALFOSC) awaiting reduction
7
AXIS bright sample
  • Selection
  • EPIC-pn exposure time gt 5 ks
  • bgt20 deg
  • 21 fields searched for sources with pn flux gt
    0.03 ct/s (10-13 erg cm-2 s-1)
  • 40 sources found
  • 13 identified
  • 25 Pending data reduction

8
AXIS galactic plane sample
  • 3 fields opened so far

9
AXIS medium sample
Opened so far
10
AXIS presentations
AXIS seminars
11
AXIS publications reports
12
Future concerns
  • On-the-fly WFC data reduction to feed WYFFOS
    spectroscopic run by end Jul 01 (r-band)
  • Allocated runs in semester 01B
  • WHT/WYFFOS 20 Oct-23 Oct 01 (D/G)
  • WHT/ISIS 23 Jan-25 Jan 02 (B)
  • INT/WFC 31 Dec 01 - 05 Jan 02 (B/G). CIRSI not
    available?
  • Galactic Plane survey problems lack of suitable
    fields
Write a Comment
User Comments (0)
About PowerShow.com