Description:

Preemption Authority. Must attempt to site through state processes ... For Western Interconnection only FERC preemption vastly expanded: ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 18
Provided by: dougl7
Category:

less

Transcript and Presenter's Notes

Title: WREZ and UREZ Transmission


1
WREZ and UREZ Transmission
  • Doug Larson
  • Executive Director
  • Western Interstate Energy Board
  • July 16, 2009

2
Outline of Presentation
  • Overview of WREZ project
  • WREZ Phase 2 (conceptual transmission plans)
  • Proposed transmission projects
  • Historical transmission flows and schedules
  • Federal activities
  • Suggestions

3
WREZ Project Phases
  • Phase 1
  • Identify developable renewable energy zones
  • Develop renewable resource supply curves for each
    zone
  • Phase 2
  • Develop model to estimate delivered price of
    power from renewable energy zones to load centers
  • Develop conceptual transmission plans
  • Phase 3
  • Foster coordinated renewable resource acquisition
    by utilities
  • Phase 4
  • Facilitate interstate transmission for renewables

4
WREZ Hubs
5
WREZ and UREZ Areas
6
WECC Study Request
  • Request 1 Near-Term Analysis RPS
    Requirements (Reference Case)
  • Request 2 Near-Term Analysis 25 Renewables
    for CO2 Targets
  • Request 3 Long-Term Analysis 33 Renewables
  • Request 4 Transmission superhighway overlay

7
WREZ Delivered Cost Model
http//www.westgov.org/wga/initiatives/wrez/gtm/mo
del.htm
8
Major Transmission Projects
9
Major Transmission Proposals and WREZ Hubs
10
Transmission Paths
11
Percent of Time Flows and Schedules Above 75 of
Paths Capacity
12
Federal Activities
  • DOI renewables initiatives
  • Litigation on Section 368 energy corridors across
    federal lands
  • Pending legislation

13
DOI Solar Initiative
  • June 20 announcement
  • Interior Department targeting 24 federal land
    tracts in six Western States for evaluation for
    solar generation
  • Up to 100,000 MW of potential generation
  • Evaluation to be completed in late 2010
  • Areas under evaluation

14
(No Transcript)
15
(No Transcript)
16
Suggestions (1)
  • Compare delivered price of power from Utah hubs
    and other hubs
  • Use the WREZ model and test sensitivities to
    changes in assumptions
  • Participate in future WREZ model webinar to see
    what LSEs (including Pacificorp) are finding
  • Require comparison as part of IRPs
  • Examine potential collector system in Utah REZs

17
Suggestions (2)
  • Evaluate effects of mega projects on flows in
    Utah
  • Right sizing of new transmission
  • Would mega projects create new opportunites for
    counterflows?
  • How would configuration of mega projects affect
    Utah access to lower costs renewables
  • Examine ways to lower integration costs
  • Ability to mix renewables from diverse locations
  • Complementary generation and storage
Write a Comment
User Comments (0)
About PowerShow.com