Multiservice Switching Forum Contribution - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

Multiservice Switching Forum Contribution

Description:

Title: Network Management issues for Interop2002. Source: Lulea ... Abstract: An outline of the requirements for management support for Interop2002 and beyond. ... – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 8
Provided by: avri
Category:

less

Transcript and Presenter's Notes

Title: Multiservice Switching Forum Contribution


1
  • Multiservice Switching Forum Contribution
  • Contribution Number msforum2002.035.1
  • Last Saved 10 February 2002
  • Working Group
  • Title Network Management issues for Interop2002
  • Source Lulea University of Technology BT
  • Avri Doria
  • Office 46 920 49 3030
  • Mobile 46 73 029 8019
  • Mobile 1 401 663 5024
  • avri_at_sm.luth.se
  • Abstract An outline of the requirements for
    management support for Interop2002 and beyond.
    This has been prepared to encourage discussions
    at the MSF TC meeting of Feb 2002

2
(No Transcript)
3
Competing Assumptions
  • The systems involved in the scenarios can be
    managed by the existing vendor management
    mechanisms
  • When these systems come to market there will be a
    coordinated way to manage multiservice/multivendor
    offerings.

4
Immediate Plans
  • Gap analysis on scenarios vis a vis management
    requirements
  • Assemble team to understand management of Interop
    2002 scenarios
  • Work directly with protocol specific WGs and with
    the Interop WG.
  • Assemble necessary existing components to effect
    management of Interop 2002

5
Protocols involved in Scenarios
  • H248/Megaco
  • BICC
  • SIP
  • SIP/t
  • SIGTRAN
  • ATM Bearers (AAL1,2)
  • RTP w/DTMF
  • RSVP-TE (MPLS)
  • VR
  • BGP/MPLS
  • MPLS DiffServ support

6
Management mechanisms?
  • XML
  • MIBs
  • List of mibs
  • Manual configuration of E-LSP and L-LSP
  • Other?

7
Longer Range Plans
  • Continued participation with Interop and other WG
    groups on management issues.
  • Explication and further development of management
    portion of architecture
  • Completion of requirements for MSS management
    systems
  • Cooperation/Liaison with other bodies to achieve
    the goals.
Write a Comment
User Comments (0)
About PowerShow.com