Impact of the Ontario Drinking Water Regulations on Private Laboratories - PowerPoint PPT Presentation

1 / 27
About This Presentation
Title:

Impact of the Ontario Drinking Water Regulations on Private Laboratories

Description:

Initially Reg 459 505. Replaced by Reg 170 Treated and ... How onerous will it become? How high will E&O costs go? Future Challenges. Uneducated Customers ... – PowerPoint PPT presentation

Number of Views:33
Avg rating:3.0/5.0
Slides: 28
Provided by: barrylo
Category:

less

Transcript and Presenter's Notes

Title: Impact of the Ontario Drinking Water Regulations on Private Laboratories


1
Impact of the Ontario DrinkingWater Regulations
on Private Laboratories
  • Barry Loescher, PhD
  • President CCIL

2
Background
  • Post Walkerton
  • Walkerton Inquiry
  • Exonerated Private Labs
  • Acknowledged CAEAL accreditation
  • Castigated Government

3
Background
  • Government Reaction
  • Safe Drinking Water Act
  • Associated Regulations
  • Investigations
  • Lab Licensing

4
Background
  • Regulations
  • Initially Reg 459 505
  • Replaced by Reg 170 Treated and Distributed
    Drinking Water
  • Schedules 22, 23 and 24
  • Reregistration
  • Reg 169 Engineers Reports Raw Water
  • Ontario Drinking Water Standards Tables 1-4
  • Reg 248 Sampling Protocol Document

5
Requirements
  • Notification of Exceedences
  • Verbal Written required,
  • MoH
  • MoE
  • Waterworks
  • Immediate

6
Requirements
  • Reporting
  • MOE requires all data be reported into their data
    base
  • Within 14 days of report

7
Requirements
  • Accreditation
  • Precondition for analysis
  • Audit reports are public domain

8
Initial Status / Impacts
  • Unclear Requirements
  • Rapidly Drafted Legislation
  • What microbiology methods are acceptable?
  • What chemistry methods are acceptable?
  • What is a Drinking Water Sample?

9
Initial Status / Impacts
  • Handholding Required
  • Confused uneducated customers
  • Uneducated MoE MoH field staff
  • The labs have to get it right

10
Initial Status / Impacts
  • I E Investigations
  • Intimidating approach
  • Substantial Fines
  • Out of Proportion

11
Initial Status / Impacts
  • Increased Administration
  • Hours / Notification
  • Frustration / Inaccessibility
  • Completing Customer Paperwork
  • Unfriendly Reporting Website

12
Initial Status / Impacts
  • Lab Licensing
  • Application
  • Fees
  • Inspection

13
Current Status / Impacts
  • 32 Accredited, Licensed Private Labs
  • Readily handling the workload
  • 3184 waterworks (May 10 2004)
  • Prepared for increased of users
  • 15000 - 30000 waterworks 2005 - 2009

14
Current Status / Impacts
  • Improvements in Place
  • Clarity of application
  • Methods Manual
  • Approval Scheme
  • Notifications easier
  • MOH more accessible
  • 3 call limit
  • DWWS website improved

15
Current Status / Impacts
  • Improvements in Place
  • Change Notice period shortened
  • Lab Inspectors a major improvement over IEB
    police
  • Drinking Water Advisory Committee
  • Our input Considered

16
Current Status / Impacts
  • Improvements in Place
  • Good CAEAL audit report process
  • After Corrective Actions complete / accepted
  • Lab reviews before release to ensure accuracy

17
Current Status / Impacts
  • Greatly Increased Administration
  • Drinking Water Characterization Form
  • Waterworks Category
  • Drinking Water System Profile
  • Waterworks
  • Notification of Lab Services
  • Written Authorization to Subcontract
  • Sampling Documentation

18
Current Status / Impacts
  • Immediate Notification of Exceedences
  • Tracking system
  • Drinking Water Samples uniquely identified
  • Analyst reports to supervisor who reviews and
    validates
  • PM notifies, calls and faxes

19
Current Status / Impacts
  • LIABILITY
  • Up to 6 million / occurrence
  • Zero tolerance
  • Escalating E O costs
  • Labs and Waterworks owners
  • Agents of the Crown exempted

20
Future Challenges
  • We are operating in an evolving environment
  • We Need to Know the Rules of the Game
  • Prior knowledge of significant changes
  • Ongoing interpretation
  • Workload Planning

21
Future Challenges
  • LIABILITY
  • How onerous will it become?
  • How high will EO costs go?

22
Future Challenges
  • Uneducated Customers
  • Broad range of sophistication
  • OCWA
  • Joes Campground
  • Cant notify or upload without appropriate
    information

23
Future Challenges
  • Uneducated Customers
  • MOE approach
  • Waterworks responsibility
  • Reality
  • The lab does it
  • Handholding required

24
Future Challenges
  • MOE LSB has become an Ally
  • Subject to the same evolving landscape
  • Special thanks to
  • Cammy Mack
  • Dan Toner
  • John Lynch
  • Greatly improved communication
  • We appreciate your efforts

25
Future Challenges
  • MOE LSB has become an Ally
  • Doesnt mean we wont continue to present our
    case strongly for Continuous Improvement

26
Conclusion
  • The Private Labs are providing
  • Prompt and accurate data
  • Excellent value
  • Proactive service

27
Conclusion
  • Were all a lot better at it now .
Write a Comment
User Comments (0)
About PowerShow.com