AIDA Front end electronics - PowerPoint PPT Presentation

About This Presentation
Title:

AIDA Front end electronics

Description:

Investigating Buffer and FADC PCB layout. Checking detector ... Specification for utility interface - Metronome. Power supply (50W) options 12v distribution ... – PowerPoint PPT presentation

Number of Views:53
Avg rating:3.0/5.0
Slides: 9
Provided by: www2P3
Category:

less

Transcript and Presenter's Notes

Title: AIDA Front end electronics


1
AIDA Front end electronics
  • Report May 2008
  • Progress
  • Data compression
  • Plan for prototype delivery

2
Progress
  • Investigating Buffer and FADC PCB layout
  • Checking detector connection board routing.
  • Specification for utility interface - Metronome
  • Power supply (50W) options 12v distribution
  • FADC interface DDR to parallel conversion

3
Compression
  • Max data rate for FEE Gbit link 60MB/sec.
  • Waveforms are the major contributor to this
    demand.
  • Compress the waveforms as they are transferred
    between memories in the FPGA

4
Compression for AIDA
Compared lossless methods. 8 sample data sets, 3
types. Each file 128MBytes, compressed in 2000
word chunks.
  • Low noise
  • Noisy
  • Periodic

5
Compression for AIDA
  • Several techniques looked at.
  • Varying results, all data dependent.
  • Home-grown method as good as others for this
    data.
  • Knowledge of data format/structure.

6
Compression for AIDA
  • MinimumOffset (MO), Data Dictionary (DD), No
    Compression (NC).
  • MO usually best, DD best for noisy data.
    Sometimes NC best.
  • All improved when bit-packed.
  • Recommend MinimumOffset with fallback to No
    Compression

7
Milestones for Prototype FEE delivery
  • Complete Specification
  • 1st July 2008 gt low risk
  • Complete Schematic and PCB layout
  • 1st Aug 2008. gt medium risk
  • Deliver 6 FEE cards ( 6 weeks )
  • 15th Sept 2008 gt low risk
  • Complete Prototype VHDL
  • 1st November 2008 gt Medium risk
  • Commission FEE cards
  • 1st December 2008 gt High risk
  • Design ASIC Mezzanine
  • 1st Aug 2008. gt medium risk
  • Deliver 6 ASIC Mezzanines
  • 15th Sept 2008 gt low risk
  • Complete Kapton board
  • 1st Nov 2008 gt low risk

8
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com