MuScat: plans and results - PowerPoint PPT Presentation

About This Presentation
Title:

MuScat: plans and results

Description:

Sci-Fi tracker. 512 fibres/orientation/plane, 3 planes. 3072 channels. Multiplex 256 fibres into 16 channel PMTs. R/O both ends of fibre, in 16 groups of 16 ... – PowerPoint PPT presentation

Number of Views:56
Avg rating:3.0/5.0
Slides: 28
Provided by: cap5
Learn more at: https://www.cap.bnl.gov
Category:
Tags: muscat | channel | fi | plans | results | sci

less

Transcript and Presenter's Notes

Title: MuScat: plans and results


1
MuScat plans and results
  • Birmingham University
  • BNL
  • BBC
  • CERN
  • GIRAG
  • Imperial College
  • Jefferson Lab

Oxford University RIKEN Rutherford Appleton
Laboratory Tohoku University TRIUMF University
California - LA
2
Status of MuScat (E875)
  • Reminder motivation
  • MuScat in 2000
  • Targets
  • Results
  • MuScat in 2003
  • Liquid Hydrogen target
  • Scintillating Fibre trackers
  • Conclusions

3
Multiple Scattering Data
  • No relevant data
  • Most relevant electron scattering in 1942!

Li
Be
Al
Moliere theory
4
Scattering Theory
  • Sufficient uncertainty
  • Good way to get started ? Should be
    measured

5
MuScat - 2000
Collimator
Targets
MINA - NaI
DLCs
Expansion volume
Shield
6
MuScat - 2000
7
Targets used in 2000
  • Solid targets mounted on a rotating wheel
  • Lithium x2
  • Beryllium x2
  • Aluminium All around 1 X0
  • Carbon
  • Polythene
  • Iron
  • LH2 - Was not included in engineering run
    Always planned for a second run

8
How did it go?
  • What went well?
  • Hardware installation, alignment
  • Data taking, beam
  • Particle ID
  • Position/angle resolution
  • Simulation/data agreement
  • What went badly?
  • Preparation of Li2 samples
  • Tails in distributions - high p?
  • Tracking Chamber systematic errors

Engineering Run
9
Particle ID
  • TOF from S1 w.r.t beam cycle
  • Cross-checked with calorimeter
  • p contamination in ms
  • small
  • measurable

Very nice
10
Chamber Efficiency
  • DLC Chamber efficiency not flat
  • Outside 10cm may be calibration?
  • Centre distorted
  • No perfect calibration found
  • Time dependent

Not so nice
11
Vacuum Distributions
  • Simulation matches data reasonably
  • Secondary sources are modelled

3cm
Not Even Preliminary
10cm
12
What was changed for Run II?
  • New beamline
  • Liquid Hydrogen target
  • The most important target (correct, Z1)
  • Required improved vacuum specs.
  • New Chambers
  • Scintillating Fibre detectors
  • Accurate, more efficient
  • Improved Collimator system
  • New active collimation
  • Tuning of passive collimator positions

Final Run
13
M20 Beamline
M20
M11
14
New Beamline
  • M11
  • Pion beamline
  • High momentum (450 MeV/c)
  • Narrow momentum bite (1)
  • Big background
  • M20
  • Quadrupole decay channel
  • Mainly surface muons
  • Forward muon decays 175 MeV/c
  • Not used for 20 years!

15
New Beamline
M11
16
MuScat Version 2
17
Liquid Hydrogen Target
  • Target volume made by TRIUMF group
  • Operated with liquid and empty separately to
    measure effect of walls
  • Two thicknesses of liquid Hydrogen used 10
    15cm
  • Improved vacuum required
  • New vessel used
  • Safety approval and operation walk in the park!

18
(No Transcript)
19
New Vessel
5 x 10-6 Torr!
20
Improved Collimation system
  • In 2000, tails from
  • Penetration of second collimator
  • Secondary sources, particularly intermediate
    disks
  • In 2003
  • Intermediate disks moved to ends
  • New disks, bigger aperture, active collimator
  • Additional lead and steel

21
Scintillating Fibre Tracker
  • 3 detectors, each 340mm square
  • x and y readout, 2 offset planes of 1mm fibres
    in each
  • 512 fibres/plane
  • 0.66mm pitch
  • in vacuum
  • L16 PMTs
  • sample/hold
  • worked well!

22
Sci-Fi tracker
  • 512 fibres/orientation/plane, 3 planes
  • ? 3072 channels
  • Multiplex 256 fibres into 16 channel PMTs.
  • R/O both ends of fibre, in 16 groups of 16
  • 1 end for group, other for fibre number
  • 24 PMTs to read all channels
  • Multiplexing flags multi-hit events

23
Data-taking in 2003
  • Setting up with beam started 25th April
  • Real data-taking with LH2 started 28th April
  • Finished 6th May 12M events with/without targets
  • Data taking with solid targets started 7th May
  • Finished 13th May Thick Li -
    6M Thin Li - 6M Thick Be -
    3M Thin Be - 3M Al - 3M C -
    2M Polythene - 2M Thick Fe -
    2M Thin Fe - 2M Empty - 5M

24
Results.
  • TOF
  • Beam momentum
  • TINA
  • Scattering..

25
Results.
26
Empty
Thin Li
Thick li
Thick Fe
27
Conclusions
  • MuScat engineering in 2000 run went well
  • Some lessons learned
  • Used for an improved version
  • 2003 Physics run all went very well
  • 46M events taken
  • LH2 as well as solid targets
  • First look at data very good
  • Analysis just starting
  • First results ENG meeting 9th July
  • Final results by end of year
Write a Comment
User Comments (0)
About PowerShow.com