Title: Project Managers Report
1Project Managers Report
- David Britton 12/Jan/2005
2Overview
- Resources
- Project Maps
- Tier-1 Hardware
3GridPP1 Financial Summary
Balance of 3.6m attributed to GridPP2
To be confirmed by PPARC
Dissemination officer Grant
Planned.
56,283 EDG cost claim 18,349 (Est.)
Manchester. 25,000 (Est.) Bristol.
4GridPP1 Financial Summary
No significant changes to categories FY03
hardware spend slipped to FY04
5GridPP2 Financial Summary
Total includes 102,077 carried forward from
GridPP1. Funds are fully allocated.
6GridPP1 Effort Summary
Approximately 38.7 FTE/year funded in GridPP1 and
approximately 48.2 FTE/year effort reported
against deliverables.
7GridPP2 Effort Summary
Note-1 Not possible to estimate Note-2 May fall
once Tier-2 posts are in place expected about
4. Note-3 Reduced from 3.6 in previous
planning. Note-4 Dissemination officer and
Production Manager.
62.5 FTE/year (c.f. GridPP1 38.7). Tier-2
hardware posts currently being filled.
8Travel Budget
9Overview
- Resources
- Project Maps
- Tier-1 Hardware
10GridPP1 Final ProjectMap
11GridPP2 ProjectMap
12GridPP2 ProjectMap
253 Milestones, 112 Monitoring Metrics at
present. Work to be done LCG area to be
defined. Production Grid details refined. Some
metrics are not yet finalised. Specific risks
and dependencies to be included.
13Risk Register
Currently using GridPP1 Register. 13 Changes
made 2 Risks added 5 risks reduced
5 risks increased 1 adjusted 2 previously
High risks were reduced. R10_GridPP
(S.linux) R14_LCG (Stability) 1 risk
elevated to High. R32_INF (Security)
14Tier-1 Hardware
- The issues here are
- The fair allocation of Tier-1 hardware
- International MOUs and other less formal
commitments - The Disk-CPU balance and the real cost of Tape
- The absolute scale.
Enter the Spreadsheet
15Tier-1 Hardware
? Table of MO Authors. ? Future information
sketchy. ?To preserve unitarity ought to ?
be an FTE count ? to come from groups not
experiments.
16Tier-1 Hardware
Table of Splits CPU/Disk/Tape ratio. Future
information is sketchy.
17Tier-1 Hardware
- Table of Strategic Weights.
- Movement of MO authors.
- Future stategic importance.
- Other factors?
- Clearly controversial
- requesting input.
18Tier-1 Hardware
Output guidelines for the User Board
within which to perform actual allocation. Output
guidelines within which international MOUs can
be discussed. Note current lack of information on
absolute scale.
19Tier-1 Hardware
We would like the CBs input to this Hardware
allocation process. A breakdown from each
institute of estimated MO FTE/experiment for
2005 to 2008 would significantly reduce the
current influence of the strategic
weights. Ideally, we would like the blessing of
the CB for this approach and then, with some
added assessment of the actual scale of the
hardware, present to PPARC for consideration in
the context of both the international MOUs
(BaBar, LHC, etc) and for post-GridPP planning.