Transcript and Presenter's Notes

Title: NAMAKWA WATER BOARD


1
NAMAKWA WATER BOARD
  • ANNUAL REPORT 2008

2
BACKGROUND
  • The Namakwa Water Board provides potable water to
    Nama Khoi Municipality De Beers Namaqualand
    Mines.
  • The area of responsibility included the towns of
    Steinkopf, Okiep, Concordia, Carolusberg,
    Nababeep, Springbok and the mining communities at
    the De Beers Namaqua mines
  • The area of responsibility is in the arid north
    western part of the Northern Cape were the Orange
    River is the only sustainable source of water.
  • Pumping water from the Orange River is costly
    because of distance and elevation to be pumped

3
ACHIEVEMENTS CHALLENGES
  • Challenges
  • -The Municipality do not have the capacity to
    take over the Water Board (Section 78
    investigation funded by DWAF).
  • The Board not able to pay creditors.
  • Various pipeline failures occurred due to age of
    infrastructure resulting in communities left
    without potable water. (Dec07 Concordia 4 days)
  • Achievements
  • Temporary appointment of consultants to perform
    managerial duties June08
  • Omissions reported by Auditors resolved
  • Involve various stakeholders in seeking
    resolution to financial crises of Board eg. DG
    ,Department of Water Affairs, MEC for Local
    Government Northern Cape Province, District
    municipality, Customers
  • Received operational grant from disaster fund
    (Namaqua District Municipality)

4
REPORT OF INDEPENDENT AUDITORS
  • Unqualified Opinion
  • In our opinion the financial statements present
    fairly, in all material respects, the financial
    position of the entity at 30 June 2008 and the
    results of its operations and cash flows for the
    year ended in accordance with IFRS.
  •  
  • Emphasis Of Matter
  • Without qualifying our opinion, we draw attention
    to note 11 to the financial statements which
    indicates the existence of a material uncertainty
    which may cast significant doubt on the entitys
    ability to continue as a going concern.
  • Report On Other Legal And Regulatory Requirements
  • In accordance with our responsibilities in terms
    of sections 44 (2) and 44 (3) of the Auditing
    Profession Act, we report that we have identified
    certain unlawful acts or omissions committed by
    persons responsible for the management of Namakwa
    Water Board which constitute reportable
    irregularities in terms of the Auditing
    Profession Act, and have reported such matters to
    the Independent Regulatory Board for Auditors.

5
PERFORMANCE SUMMARY
  • Board made a loss of R 17 mil 2008 vs. profit of
    R 2,6 mil 2007(R 12 mil remission of debt
    included in 2007)
  • Operating loss of R 1,4 mil 2008 profit of R
    3,9 mil 2007 mainly due to increase in salaries
    operational cost write down of debts asset
    scrapping
  • Debtors decreased by R 1,5 mil(R0,698 non
    recoverable written off)
  • Creditors Increased by R0,8 mil (Mainly Raw water
    purchased from Water Affairs)
  • Relook at accounting policy resulting in non Cash
    based funds written off to provide a more
    realistic view of entity.

6
FINANCIAL PERFORMANCE 2007/2008
INCOME STATEMENT FOR THE YEAR ENDED 30 JUNE
2008
7
STATEMENT OF FINANCIAL POSITION(BALANCE SHEET)
8
CASH GENERATED BY OPERATIONS
9
STRATEGIC PLAN 2009/2011
  • The strategic goal for the Board is to get out of
    its current cash flow crisis and to become self
    sustainable. This will be attain by
  • Secure short term financial assistance
  • Reduce cost of operations
  • Reach agreement with Municipality to take over
    distribution
  • Recovery of actual cost of service
  • Remission of Debt - Water Affairs loan
  • Reach agreement with DBSA for rescheduling of
    loan
  • Secure funding for urgent capital replacement

10
CAPITAL EXPENDITURE PRIORITIES 2009/2011
  • The Flocculation dosing pumps, Lime feeders and
    Chlorinators are all defect, which is directly
    impacting the quality of water and the health of
    operators.
  • Urgent replacement required of 26km section of
    the main pipeline between Vrieskloof and Okiep.
    The lining of the pipeline has broken up, causing
    corrosion and blockading of the pipeline and
    frequent pipeline failures, resulting in the
    community been left without potable water.
  • Replacement required of 9 km section of the
    pipeline between Okiep and Nababeep. The pipeline
    has reach the end of its economical life and
    leaks occur on the line. As this line is not
    accessible by road, maintenance cannot be carried
    out on the line.
  • Replacement required of 5 km section of the
    pipeline between Okiep and Carolusberg. The
    pipeline has reach the end of its economical life
    and leaks occur on the line.
  • Replacement required of 9 km section of the
    pipeline between Okiep and Concordia. The
    pipeline is use to pump water under high pressure
    and has reach the end of its economical life.
  • The Metering equipment to measure extraction and
    distribution needs to be replace as meters is not
    working. This is also necessary to determine
    water losses and leaks on pipelines.
  • The communication and telemetric control between
    reservoirs and pump stations which is needed to
    monitor reservoirs levels and communication
    between operators need to be replace or upgraded
    to ensure reservoirs levels are monitor
    accurately and pumps are activate in correct
    sequence to prevent pipeline burst.
  • Other short term replacement that needs to be
    made includes
  • The housing for operators have not been
    maintained properly and needs upgrading to
    repairs insure the availability of personnel.
  • Two vehicles for technical and repair personnel
    needs to be replaced urgently.
  • The Lifting equipment on the trucks used to
    transport pumps pipes need to be repaired as it
    not safe or effective currently.
  • Access roads especially for the Nababeep pipeline
    needs to be upgraded as the pipeline is not
    accessible for repairs.