L2 secondary path s 7'51031 - PowerPoint PPT Presentation

1 / 3
About This Presentation
Title:

L2 secondary path s 7'51031

Description:

L2 secondary path s _at_ 7.5 1031. TOTAL EXCL. INCLUSIVE ELECTRON: L2_CEM12_PT8 250nb 100nb ... steady, 50% overlap with L2_CEM16_PT8 (conservative) ... – PowerPoint PPT presentation

Number of Views:44
Avg rating:3.0/5.0
Slides: 4
Provided by: Ros5165
Category:
Tags: excl | path | secondary

less

Transcript and Presenter's Notes

Title: L2 secondary path s 7'51031


1
L2 secondary path s _at_ 7.51031


  • TOTAL EXCL.

  • INCLUSIVE ELECTRON L2_CEM12_PT8
    250nb 100nb
  • no growth factor,
  • steady, 50 overlap with L2_CEM16_PT8
    (conservative)
  • ELECTRONTRACK L2_CEM8_PT8_CES3__TRK8
    120nb 15nb
  • sTOT slowly rising
  • Major overlaps 75 L2_CEM8_PT8_CES3__TRK5_DPHI1
    0
  • 60 L2_CEM12_PT8
  • 40 L2_CEM16_PT8
  • BOTH REASONABLE REQUESTS

2
Whats next...
  • CMX4_CMX4
  • missing L1 bit CMX6_PT4 (or TWO_CMX1.5_PT2)
  • missing L2 diCMX code
  • Split L2_CMUP6_PT8
  • CMUP6_PT8__TRK8
  • CMUP6_PT12
  • need to write the L2 codes
  • x-section of both less than L2_CMUP6_PT8
  • requires more L2 trigger bits (should not be a
    problem)
  • can we have another muon stub threshold at L2?

3
Whats next...
  • L3 modification
  • introduce leptontrack (88GeV) inclusive
    lepton (12GeV)
  • reduces total number of paths to 14
  • maximize acceptance on dilepton events (IMU
    CMIO too)
  • current setup meant to simplify calibrations
  • What we can do
  • compute x-sections for all missing L1 L2
    primitives
  • estimate exclusive contributions as well
  • need to update our code to keep into account L2
    muons
  • time-scale reasonably in three weeks
Write a Comment
User Comments (0)
About PowerShow.com