Description:

Rates should be designed to recover not more than actual cost ... Hamster *Insufficient animal numbers to calculate accurate cost per animal. ... – PowerPoint PPT presentation

Number of Views:88
Avg rating:3.0/5.0
Slides: 14
Provided by: randal46
Category:
Tags: dar | analysis | cost | hamster | phase | study

less

Transcript and Presenter's Notes

Title: DAR Cost Analysis Study Phase II


1
DAR Cost Analysis Study - Phase II
  • Presented by Dr. Lyndon Goodly
  • August 1, 2, 3, 2005

2
OMB Circular A-21Section J.44 is applicable to
animal care facilities
  • Cost will be charged directly to users
  • Rates must be reviewed periodically
  • Rates should be designed to recover not more than
    actual cost
  • Rate schedule does not discriminate between
    federal and non-federal supported activities
  • Based on actual use of the services

3
Grants and Contracts - UIUC
  • Coordinate animal care rate calculations closely
    with the FA cost rate development
  • Conduct annual detailed cost analyses for animal
    care program
  • Include all of the costs of providing animal care
    services

4
Grants and Contracts -UIUC
  • DAR worked with Huron Consulting Group
  • Huron provided template for conducting cost
    analysis
  • Huron gave guidance during data collection
  • Huron reviewed procedures and results with DAR

5
Mechanics to Determine Per Diem Rates Based on
Huron Template
  • Determine Total Costs Associated w/ Program
  • Conduct time/motion study for three two week
    periods
  • Assign Salary costs based on percentage of staff
    time spent working with each species
  • Other costs allocated based on Total Cost Per
    Species
  • Total Species Costs / Total Animal Days
    Calculated PDR

6
Results of Cost Analysis
  • 100 Cost Recovery Analysis Rates excludes the
    following
  • Existing Major Equipment Replacement
  • Cage Washers 11
  • Autoclaves 8
  • Estimated replacement costs - 1,500,000
  • Equipment Needs for New Researchers
  • Cages
  • Racks

7
Total Cost Per Animal Per Day
8
Total Cost Per Animal Per Day
  • Insufficient animal numbers to calculate
    accurate cost per animal.

9
Current Per Diem Rates
10
Current Per Diem Rates at Other Institutions
11
Projected FY06 Revenues Expenditures
12
Next Steps
  • Present to VCR - Done
  • OVCR work with Campus Committee on Animal Care to
    determine new PDR - Ongoing
  • Receive input from Facility Advisory Committees -
    Ongoing
  • VCR set rates and timeline
  • Implement New Per Diem Rates
  • New cost analysis every other year

13
Dates of Time Motion Study
  • September 16, 2004 September 29, 2004
  • December 5, 2004 December 18, 2004
  • February 27, 2005 March 12, 2005
Write a Comment