Title: Cross border redispatching


1
Cross border redispatching
  • Central West Electricity Regional Energy Market
  • Mini Forum
  • Alain Marien
  • 20th of June 2006

2
Plan
  • Goal
  • Regulatory context
  • Experience
  • Issues to be tackled

3
Goal
  • Option 1 Guarantee the firmness of already
    allocated transmission rights?
  • Option 2 Allocate more transmission rights?

4
Regulatory context
  • Directive 2003/54/EC Article 11, related to
    dispatching and balancing, 2
  • The dispatching of generating installations and
    the use of interconnectors shall take into
    account the economic precedence of electricity
    from available generating installations or
    interconnector transfers and the technical
    constraints on the system.

5
Regulatory Context (2)
  • Regulation EC 1228/2003 article 6.2
  • Article 6.2 Transaction curtailment procedures
    shall only be used in emergency situations where
    the transmission system operator must act in an
    expeditious manner and redispatching or
    countertrading is not possible.
  • Article 6.3 The maximum capacity of the
    interconnections and/or the transmission networks
    affecting cross-border flows shall be made
    available to market participants, complying with
    safety standards of secure network operation.

6
Regulatory context (3)
  • New Congestion Management Guidelines
  • 1.3. Where scheduled commercial transactions are
    not compatible with secure network operation,
    Curative redispatching or countertrading shall be
    envisaged in case lower cost measures cannot be
    applied.
  • 1.8. When balancing the network inside the
    control area through redispatching, the TSO
    shall take into account the effect of these
    measures on neighbouring control areas.
  • 2.5. The access rights for long- and medium-term
    allocations shall be firm transmission capacity
    rights.
  • 3.5. With a view to promoting fair and efficient
    competition and crossborder trade, coordination
    between TSOs within the regions shall
    include, in particular (h) Accounting and
    settlement of congestion management actions.

7
Experience
  • In the Central West region
  • Bilateral agreements between TSOs on the
    triggering of cross border redispatching case by
    case cost settlement
  • TSOs of the region are working on an Inter TSO
    agreement
  • Nordel
  • Congestion management market splitting
    countertrade
  • Proposal for a limited increase of (preventive)
    countertrade
  • Objective increase capacity and reduce periods
    with price difference between zones
  • Can be inefficient
  • Increased risk of abuse of market power
  • PJM
  • Optimised bid based nodal real-time redispatch

8
Issues to be tackled
  • Goal to guarantee or maximise the capacity?
  • Criteria
  • Non discrimination same mechanism for internal
    and cross border redispatching,
  • Economic efficiency (regional)
  • Mechanism
  • Principle for the determination of the action to
    be taken ex. choice of the generation units to
    redispatch
  • Remuneration of the service bid based system?
  • Interaction with balancing?
  • Costs allocation mechanism between TSOs or
    directly on market actors? Zonal or nodal
    approach?

9
Issues to be tackled (2)
  • Harmonisation
  • Dispatch nominations /re-dispatch sequence in
    the different countries
  • Role of the TSO in real time
  • Market power issues
  • Risk of manipulation
  • Legal issues
  • Role of the TSOs?

10
Discussion
  • Current regional initiative?
  • Future development
  • Priority given to this issue?
  • Goal?
  • Timing?

11
Cross border redispatching
  • Thank you for your attention!