Title: Improving Regional Signal Operations
1Improving Regional Signal Operations
ITE New Mexico Section November 2, 2006
2Regional Setting
- Reno/Sparks metro area population401,000 / 120
sq. mi. - Growth rate 4
- Three signal operating agencies
- Reno, Spark, Washoe County
- RTC does not own/operate signals
- 340 signalized intersections
- Systems
- Multisonics VMS
- Eagle ACTRA
3Study Area
Downtown Reno Detail
4Background
- National Traffic Signal Report Card D !
- Last regional signal re-timing effort 1999
- 4 population growth 30 increase in
population - 8-10 traffic growth 70-100 increase in
traffic volumes - Resources declining
5Project Goals
- Provide real improvements
- 10 to 40 less delay, stops
- Observe and fine-tune in the street
- Expand staff capabilities
- Knowledge
- Efficiency
- Inform the public about signal operations
- Build relationship
- Develop model for regional traffic operations
- Regional cooperation
6Scope of Work
- Task 1. Project Management
- Task 2. Data Collection Operations Review
- Task 3. Development of Synchro Model
- Task 4. Signal Timing Analysis
- Task 5. Identify Signal Improvements to Meeting
Regional LOS - Task 6. Before After Studies
- Task 7. Plan for Arterial Automatic Traffic
Recorders - Task 8. Arterial Communication Master Plan
- Task 9. Training
- Task 10. Public Outreach
- Task 11. University Partnership
- Task 12. Project Summary Report
- Task 13. Design of Signal Improvements (OPTIONAL)
- Task 14. System Planning (OPTIONAL)
7Task 2. Data Collection Operations Review
- Stakeholders to Identify Study Intersections
- Field Observations - Review of existing
operations - Existing Recent Counts Compiled and Reviewed
- ADT Counts
- At critical locations in 15-minute increments
- Used to study peaking characteristics
- Identify peak periods for turning movement counts
- Turning Movement Counts
- At 150 study intersections
- 3 peak periods AM, midday, and PM peak (2-hours
per peak) in 15-minute increments
8Virginia Street Between 7th 6th Street Sat
Sun ADT
9Virginia Street Between 7th 6th Street Monday
ADT
10Virginia Street Between 7th 6th Street
Tuesday Thursday Average ADT
11Virginia Street Between 7th 6th Street Friday
Average ADT
12Virginia Street Between 7th 6th Street 7-Day
ADT
13Task 3. Development of Synchro Model
- Develop a Single Regional Synchro Model
- Model Developed Based On
- Previous models developed by MMA
- Current agency specific models
- Utilize UNR Student intern to build model
- Develop 3 to 10 Sub-Regional Models
- Procure an Upgrade to RTCs Current
Synchro/SimTraffic Software
14Task 4. Signal Timing Analysis
- Analysis of Existing Timing Parameters
- Vehicle clearance times
- Pedestrian clearance times
- Review Actuated Controller Settings
- Develop Coordination Strategy
- Time of day operation
- Traffic responsive
- Groupings
- Outline Deployment Schedule (avoid construction
projects, special events, etc) - Deploy and Fine-Tune Coordinated Timing Plans
15Task 5. Improvements Needed to Meet Regional
Level of Service (LOS)
- Evaluate LOS - Synchro
- Develop Recommendations to Improve Intersections
- Geometric enhancements (i.e. striping, etc.)
- Operational improvements (i.e. addition of
left-turn treatments, detection enhancements,
etc.) - ITS deployment (i.e. CCTV, etc)
16Intersection Improvements
17Task 6. Before After Studies
- Drive in Traffic
- Use GPS Technology to Collect Data
- Calculate Average Speed and Delays
- Before Study Just Prior to Signal Timing
Improvements - After Study Settling-In Period
18Before-after results
- Pyramid Highway
-
- McCarran SW
19Task 9. Training
- Three ½-Day Seminars
- Topics Developed by Steering Committee
- Potential Topics
- Advanced coordination main street gapout,
permissive windows, etc - Methodology for travel time and delay studies
- Transit signal priority technology,
implementation, and integration into existing
signal coordination - Technology overview and assessment comm
technologies, central system selection, ITS
device assessment - Maintenance operations standard practices
20Task 10. Public Outreach
- Providing Information
- Three Public Information Sessions (meetings)
- Printed Newsletter (every two months)
- Website Hosted by RTC on Signal Operations and
Timing - Moderate an E-mail Discussion Group (TBD)
- Document Signal Operation Complaints
- Develop Consistent Process
- Respond to All Complaints
- Development of Presentation Materials
- Community/Neighborhood Advisory Boards
- Agency Advisory Committees
- Professional Conferences
21Task 10. Internal Outreach
- Traffic roundtable
- Troubleshooters Anonymous
- Discussion of controller parameters
- Signal operations philosophy
- Discussion list for Reno
- Techs, foreman, supervisor, DPW, consultant, RTC
22Traffic roundtable agenda
- Introductions
- Safe Routes to School Pilot Project for Mendive
MS (Sparks) - Accident reconstruction using GPS in Sparks
- Regional Traffic Guidelines (RTC)
- Website
- Standard intersection and roundabout layout
- Signal turn-on procedure
- Status of Significant Projects (RTC and Others)
- Maintenance of signal interconnect on projects
(RTC) - Traffic Consultant Shortlist (RTC-Jim Poston)
- Loops vs. Camera-preference (Reno)
- UNR Research Services (RTC-Jim Poston)
- Left turn control guidelines
- Flashing yellow arrow status
- I-580/US-395 Ramp Meters - Status (NDOT)
23Troubleshooters Anonymous Agenda
- Video issues
- Webcams - City of Reno
- Maintenance of interconnect during construction
- SPUI signal control
- Traffic Signal Operations Specialist
certification - Demo-TESCO Traffic Battery Backup System
24Task 11. University Partnership
- Group Discussions
- Operating Agencies, RTC, UNR
- Goal Solidify Partnership withUNR in Traffic
Operations. - Research
- Internships
- Guest Speakers for University Classes
- Continuing Education Topics
- Cooperation with UNR on Research Projects
- Diamond Interchange Operation
- Left-Turn Treatments
25Future action items
- Annual retiming project
- Annual count program
- Turning movement counts
- ADTs
- Classification
- Shared operations center (physical or virtual)
26Questions?
JPoston_at_RTCwashoe.com (775) 332-2139