SP2: IT Environment Adaptation and Tailoring. to 30. 24 ... SP 1 E-inclusion Knowledge Framework. Progress of the work ... D12: Assessing Standards delivered ... – PowerPoint PPT presentation

Number of Views:98
Avg rating:3.0/5.0
Slides: 15
Provided by: clara3
Category:
Tags: d12 | m14 | overview | project

less

Transcript and Presenter's Notes

Title: Overview of the Project


1
Overview of the Project Mrs. Anna
Assimakopoulos Director, EEF Consortium
meeting Florianopolis, November 17, 2004
2
WORKPROGRAM
SubProjects
SP3 Networked Demonstrators
28 months
From 9
to 36
Horizontal Activities
3
SP 1 E-inclusion Knowledge Framework Progress
of the work
  • Task 1.1 Conceptual Framework Done
  • Task 1.2 Target Group Surveys Requirements
    Done
  • Full presentation to be delivered by BF
  • Task 1.3 Evaluation and Assessment In progress
  • 1st Review meeting held in Athens on October 26
    at EEF office
  • Progress of the work presented to the evaluators
  • Review report to be circulated among the Partners
    and to be annexed to the next Progress Report to
    the EC

4
SP 1 E-inclusion Knowledge Framework Next steps
  • Evaluation of the System prototype via Internet
    (initial Evaluation Forum M22)
  • Continuous Conceptual Framework up-date
  • 2nd Review meeting in October 2005

5
SP 2 IT Environment Adaptation
Tailoring Progress of the work
  • Task 2.1 Functional Specifications In progress
  • Early System Prototype available
  • Deliverables postponed for 2 months
  • Presentation of the progress of the work and
    Early System Prototype to be delivered by the
    Technical Partners
  • Task 2.2 Core Technology Customization In
    progress
  • Presentation of the progress of the work by the
    Technical Partners
  • Task 2.3 System integration In progress
  • Presentation of the progress of the work by the
    Technical Partners
  • Task 2.4 System support enhancement Not
    applicable
  • Task 2.5 Standardization In progress
  • D12 Assessing Standards delivered
  • Presentation of the progress of the work by the
    Technical Partners

6
SP 2 IT Environment Adaptation Tailoring Next
steps
  • Finalization of the System and User Interfaces
    specification
  • Integration of the main modules and applications
    of the Link All platform, based on the functional
    requirements and on the available background
    tools
  • Deliverables due
  • D14 System Specification (M14)
  • D15 User Interfaces specification (M14)
  • D16 System Specification Validation (M14)
  • D17 Incorporating Standards (M14)
  • D21 System early prototype (M14)
  • D22 Environmental Business Planner (M21)
  • D23 User Interfaces User Access Management
    (M21)
  • D24 Content Valorisation Engine (M16)

7
SP 3 IT Networked Demonstrators Progress of the
work
  • Task 3.1 Content collection In progress
  • Presentation of the progress of the work to be
    delivered by EEF/BF
  • Micro finance analysis to be presented by COFAC
  • Task 3.2 Content editing not applicable
  • Task 3.3 Content hosting and diffusion not
    applicable
  • Task 3.4 System deployment In progress
  • First research related to the satellite issues
  • Conclusions to be presented by STAR/Technical
    manager
  • Task 3.5 System testing not applicable
  • Task 3.8 Operating the demonstrators not
    applicable

8
SP 3 IT Networked Demonstrators Progress of the
work con/ued
  • Task 3.6 Local communities organization In
    progress
  • Presentation of the progress of the work to be
    delivered by CDI
  • Presentation of the Demonstrators by GEDES/
    ICEPH/ FIESC/ MANOS/ ILAM/ GIT
  • Task 3.7 Local communities training In progress
  • Presentation of the methodology to be delivered
    by GEDES
  • Task 3.8 Operating the demonstrators not
    applicable

9
SP 3 IT Networked Demonstrators Next steps
  • Collection of the data on crafts, eco agro
    tourism, culture and micro financing (M18)
  • Collection of European Best Practices (M18)
  • Collection of Technical Data (M18)
  • Collection of best practices and tutorial data
    content (M20)
  • First draft of business plans for the local
    communities
  • Organization of a training methodology

10
HA 1 Project Management Progress of the work
  • Task HA1.1 Overall Administrative Management In
    progress
  • Task HA1.2 Latin American Administrative
    Management In progress
  • Task HA1.4 Local Project Management In progress
  • Presentation of the work to be delivered by EEF /
    FIESC
  • Task HA1.3 Expert Advisory Board In progress
  • All relevant progress reports and related
    deliverables duly sent to the members of the
    Expert Advisory Board
  • 1st Expert Advisory Board meeting to be held in
    Florianopolis on November 17, 2004
  • Task HA1.5 Management Support Infrastructure - In
    progress
  • Continuous input into the virtual collaboration
    space
  • Tool for running Virtual Conferences ready (D2
    delivered)

11
HA 1 Project Management Next steps
  • Next Man-month Project Reports in mid December
    2004

12
HA 2 Dissemination and Sustainability Progress
of the work
  • Task HA2.1 Dissemination In progress
  • Presentation of the work to be delivered by
    EEF/FIESC
  • Task HA2.2 Sustainability In progress
  • Presentation of the work to be delivered by ECEAT

13
HA 2 Dissemination and Sustainability Next steps
  • Pursuit of dissemination activities in EU and LA
  • Final version of the Dissemination Plan (M18)
  • Further contacts/research related to the Action
    Plan and the Sustainability Plan

14
CONCLUSIONS
  • Good collaboration among the Partners
  • Slight delays in a number of deliverables
    (postponed for 2 months)
  • High quality of the work achieved and the
    deliverables
  • Positive initial feedback from reviewers
  • Encouraging comments from the Project Officer
  • System Demo-an excellent starting point
  • Focus on system development, content, local
    communities organization and training plans
  • Focus on business framework
  • Lots of work ahead
  • CONTINUEMOS!