E AMDAR Report 6th WMO AMDAR Panel Meeting - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

E AMDAR Report 6th WMO AMDAR Panel Meeting

Description:

New Programme Manager: Ture Hovberg. 3. E-AMDAR - Programme Plan 2003-2006 ... EUCOS High Frequency Trials: 1st HF Trial 5th March to 15th April 2003 ... – PowerPoint PPT presentation

Number of Views:49
Avg rating:3.0/5.0
Slides: 13
Provided by: tureho
Category:
Tags: 6th | amdar | wmo | meeting | panel | report | trials

less

Transcript and Presenter's Notes

Title: E AMDAR Report 6th WMO AMDAR Panel Meeting


1
E- AMDAR Report6th WMO AMDAR Panel Meeting
  • Ture Hovberg - E-AMDAR Programme Manager

2
E-AMDAR - an integrated component of EUCOS
  • E-AMDAR became a fully integrated component of
    the EUCOS Operational Programme on the 1st
    January 2003 and the programme management
    responsibilities were moved from Met Office to
    SMHI
  • New Programme Manager Ture Hovberg

3
E-AMDAR - Programme Plan 2003-2006
  • Detailed in the Fleet Configuration Plan 2003
  • Key objectives 2003
  • According to EUCOS requirements maximum of 3
    hourly data (other frequencies on national
    request)
  • Maximum use of all data optimization systems in
    order to lower operating costs and maintain year
    2002 levels of data coverage
  • Procure additional data over global data sparse
    areas aim to contribute 5 of funds to data
    outside the EUCOS area
  • Streamline communications systems to enable
    savings on communication cost
  • En route optimization

4
EUMETNET AMDAR System
5
E-AMDAR - Recruitment of new airlines
  • Old list of contacted airlines
  • Malev
  • Lauda
  • Finnair
  • GB Airways
  • New list of contacted airlines
  • EasyJet
  • Monarch
  • FlyBe
  • Virgin Atlantic
  • British Midland
  • Aer Lingus
  • UPS
  • Not yet contacted but of interest
  • Braathens
  • Icelandair
  • LTU

6
E-AMDAR - Contribution to special observing
periods and campaigns
  • EUCOS High Frequency Trials
  • 1st HF Trial 5th March to 15th April 2003
  • 2nd HF Trial 20th August to 20th September 2003
  • North Atlantic - Thorpex Region Campaign (NA
    TReC)
  • Now running - 15th October to 12th December 2003

7
E-AMDAR Network Development
8
E-AMDAR Network Performance
9
E-AMDAR contribution to WWW
  • Three days were used for analysis prior, during
    and after the second EUCOS HF Trial (18th Aug
    30th Sep 2003).
  • (EUCOS area is defined as 10N 90N and 70W
    40E)

10
E-AMDAR contribution to WWW
  • EUCOS / WWW coverage the 5th Oct 2003

11
E-AMDAR contribution to WWW
  • 5th Oct 2003 - detail

12
End of Presentation