Description:

In processing of hiring new full time person. In process of establishing collaboration with UofI ... Documents can only have one 'topic' No topic/subtopic ... – PowerPoint PPT presentation

Number of Views:114
Avg rating:3.0/5.0
Slides: 36
Provided by: bar5150
Category:
Tags: ilc | forum | license

less

Transcript and Presenter's Notes

Title: ILC Forum


1
ILC Forum
  • Controls
  • Margaret Votava
  • (To be temporarily replaced with Sharon Lackey in
    AD)

2
What are we working on - Globally
  • Produce RDR and now EDR at the end of 2009
  • or 2010 or 2011 depending on who you talk to
  • EDR requirements are not well defined
  • Manage/conduct Global RD plan in units called
    Work Packages. First draft done.
  • Collaboration primarily with ANL and to a lesser
    extent SLAC
  • Small FNAL effort for RDR/EDR.
  • Steve Wolbers (was Patty), Bakul Banerjee,
    Margaret Votava, Vince Pavlicek, Mark Bowden,
    Bill Haynes, Jim Patrick, Sharon Lackey
  • Weekly telecon meetings.
  • Consumes all FNAL FTEs paid for by the GDE
  • RDR done except
  • for technical notes that expand details
  • WBS type things like complete basis of estimate
  • Placeholder for other things like controls effort
    needed for instrumentation RD
  • Ron/Lucianos trip(s) to DESY and KEK for HOM BPM
    Testing
  • Charlie Briegels ATCA work for ATCA BPMs at NML

3
ATCA
  • Advanced Telecommunications Architecture
  • Emerging Standard for High Availability
    Architectures
  • One of the ILC Controls Challenges. Up time of
    99.999
  • Being really pushed by SLAC as part of the
    architecture for ILC controls.
  • Offers hot swap of boards, redundant power
    supplies and networking
  • Telecommunications gt digital.
  • No commercial analog boards
  • Commercial plug ATCA workshop as part of RT
    conference on Sunday April, 29th.
  • Hardware/software tutorials
  • Talks on User Experience and
  • 80 registration

4
ILC Overview from RDR
Middleware Services
User Displays
Front End
5
ILC Controls RD
  • High Availability
  • Evaluating ATCA as a standard outside of
    instrumentation
  • Diagnostic Interface Layer
  • Evaluation of high availability software
    techniques in all layers
  • Standards, standardization, quality assurance
  • Timing/feedback
  • Precision timing and RF phase distribution
  • Extensive reliance on automation and beam based
    feedback
  • Controls system studies
  • Conflict Avoidance
  • Fault detection and recovery
  • Scalability
  • RD needed to configure/control/monitor a
    control system as complex as the ILC.
  • Remote operations
  • Provide a framework which is supportive of remote
    operations RD such as role based access.

6
ILC Controls Work Packages
  • Encompasses FY08 and FY09 RD Funding
  • Not much. 5.6M in FY08. Includes salaries.
  • another 4M for SCRF, but this is really FNAL
    money
  • Given to ART Global systems leaders on Wednesday.
  • John Carwardine (ANL) and Ray Larsen (SLAC)
  • More than just controls. Includes
    instrumentation, alignment
  • Work Packages 1-2 page description
  • High Availability
  • Claude Saunders (ANL) Lead
  • Controls System Architecture
  • Claude Saunders (ANL) Lead
  • ATCA
  • Looking for FNAL work package leader Vince
    Pavlicek (FNAL) temp lead
  • SCRF
  • Margaret Votava (FNAL) Lead
  • FNAL contribute 12FTE annually
  • Management
  • EDR, requirements document, and L3 controls
    leader
  • Looking for Americas L3 Controls Leader

7
Commercial Break for Glossary
  • SMTF -gt ILCTA -gt SCRF
  • All are Fermilab centric, i.e., no other lab is
    building a facility called ILCTA
  • SMTF Superconducting Module Test Facility.
  • Initially just the work being done at A0
  • ILCTA ILC Test Accelerator
  • Includes all ILC test areas. A0 (prototype of NML
    and 3.9 GHz testing program), VTS_at_IB1, HTS_at_MDB,
    and NML
  • SCRF Superconducting RF
  • Renamed in light of DOE funding request. Didnt
    want it to be solely an ILC test facility but
    allow for all kinds of accelerator RD.
  • VTS Vertical Test Stand, VTF.
  • Just one for now, more are planned. Need new cryo
    system at IB1
  • HTS Horizontal Test Stand, HTF.
  • Just one for now, more are planned. Will need new
    klystron

8
More Glossary NML/CTF
  • NML SCRF test area with beam
  • DOE Review recommendation was to build a CTF
    (cryomodule test facility) with no beam. Similar
    to VTF/HTF, but for cryomodule.
  • FNAL still believes beam area critical.

9
SCRF Requests
  • Controls RD is focused in two areas
  • RD to create stable and robust controls system
    for SCRF RD program
  • RD for ILC Controls
  • DOE request address only the SCRF RD program
  • Want to make ourselves available for ILC Controls
    RD
  • Control system is recognized critical for ILC
    success
  • NML is strong site for controls RD
  • Running with ILC beam parameters
  • Conveniently located near institutions involved
    in global controls effort (ANL, FNAL)
  • Close collaborators with others (DESY, SLAC).
  • Not much recommended GDE funding in near term,
    but will come.

10
SCRF Control Goals
  • Provide an operationally stable system for the
    automatic procedures needed for cavity and
    cryomodule testing
  • Provide a consistent controls infrastructure for
    all the facilities VTS, HTS, NML.
  • VTS controls in the SNS package. Interface to
    common electronic logbook/data management
    systems.
  • Provide an infrastructure that can readily
    integrate components developed at collaborating
    institutions
  • Provide a work area conducive ILC Controls RD
  • These goals are not always compatible.
  • Balance needs to be found

11
SCRF Focus
  • Infrastructure support
  • Core controls system(s) support, development, and
    configuration management including code packaging
    and distribution
  • Controls systems include EPICS, DOOCS and
    diagnostic systems such as LabView and MatLab
  • Develop cavity data management system
  • Additional component support including system
    management, electronic logbook, cavity data
    management system
  • Test area specific
  • NML specific development
  • Develop timing and clock system that are required
    for first beam operation
  • Develop interfaces for new components for
    instrumentation and control
  • Develop controls interface for ATCA BPMs
  • Develop/configure NML application software
  • HTS/VTS ongoing support updating processes, and
    user interfaces as more experience with the
    cavities is gleaned.

12
Controls Resources Needed
  • Labor - 12 FTE annually
  • Infrastructure support
  • NML specific support
  • HTS/VTS support
  • Cavity Data Management Development (1 year only)
  • Details later
  • CD Ron, Luciano, Margaret, New Hire, Bakul, Rob
    Kutschke, Connie/Troy
  • AD Mike Kucera (SCRF Controls Deputy Head),
    Sharon Lackey (Head while Margaret gone), Dennis
    Nicklaus, Jerry Firebaugh, Jimmy Wu, Michele
    McCusker-Whiting
  • PPD Geoff Savage, Vladimir Sirotenko
  • UofI contract Micheal Davidsaver
  • MS 950K
  • Gigabit network infrastructure
  • RF interlocks
  • Event clock/timing system
  • Data acquisition and control (IOCs)
  • Local consoles, archiving, logbook..
  • Control room outfitting

13
Annual Labor Details
  • About 8.5 FTEs identified spread over 25 people
    in 4 divisions (bulk in AD and CD)
  • Connie/Troy starting sys admin support
  • In processing of hiring new full time person.
  • In process of establishing collaboration with UofI

14
NML MS Details
  • FY07 - 315K
  • 115 Crates and electronics - VME Crates,
    processors, cathode system interface, IOCs and
    hardware, digitizer boards, timing modules,
    controls interface to the safety system, CM1
    motor controls, UPS for some network switches and
    cryo consoles, and wireless network.
  • 52K Network switches
  • 45K RF interlock
  • 35K Control room outfitting
  • 23K Control room consoles a few machines
  • 20K Test system
  • 15K Event Clock System
  • Rest few commodity CPUs
  • FY08 - 468K
  • 150 RF Interlocks - CM1 and injector
  • 110K Crates and electronics - Interfaces for
    instrumentation and MPS
  • 80K miscellaneous
  • 62K Computing control room
  • 36K Software floating licenses
  • 20K Test Rack
  • Rest small networking and commodity computing
    purchases
  • FY09 - 162K

15
Cavity Data Management
  • Tracks all data about the cavity from processing
    through testing
  • Scope creep (explosion). First FNAL only -gt now
    worldwide. Cut back to North America.
  • EDMS issue, but has been in controls WBS
  • Team established last summer to evaluate
    alternatives, make recommendations, and develop
    system
  • Peter Kasper (lead), Jerzy Nogiec, Joe Ozelis,
    Jamie Blowers, Claude Saunders (ANL), Marc
    Paterno, Janice Nelson (SLAC)
  • Major options
  • DESY system data centric
  • JLAB system process centric
  • Commercial solution - costly
  • Roll our own
  • External requirements review last Friday
  • Went well report expected by Thursday
  • Included DESY and and JLAB
  • Proposal review to come shortly (couple of weeks)

16
Global Infrastructure
  • Establishing EPICS installation layout
  • Epics has its own build system that is different
    than the FNAL/CD standard way.
  • Primarily paths are hardcoded, not determined via
    environment variables. This has a large
    implication on build and distribution strategies.
  • Proposal next week
  • Naming convention for EPICS variables
  • Proposal in AD Doc database
  • http//beamdocs.fnal.gov/AD-public/DocDB/ShowDocum
    ent
  • Consistent for HINS and ILC
  • Make data transition between DOOCS and EPICS
    easier
  • ILC Official Document database
  • Not well configured yet (IMHO)
  • Documents can only have one topic
  • No topic/subtopic organization for ILCTA
  • Will get summer student to relocate things from
    the docdb demo/plone site to here.
  • System Management
  • Connie/Troy helping here (Thanks!)
  • Custom kernels, many behind AD firewall, in
    remote locations, etc.
  • CRL installed and in use

17
VTS
  • Not much to say
  • Controls system in LabView. Provided by JLab as
    part of MOU.
  • Needs to interface to CRL and cavity data
    management system.

18
MDB Controls Overview
Electronic Logbook (CRL)
Data Management


LabView App (Diagnostics)
MatLab App (Diagnostics)
EPICS APP (State Machine)
EPICS APP (Archiving)
1G Ethernet
19
HTF/CC2
  • Primarily EPICS, but LLRF in DOOCS
  • Todo list
  • LLRF Controller is SPARC board. Its old and
    problematic. Working on replacing it with an X86
    running Linux.
  • Still includes ACNET for RF interface
  • New interlock crates with additional digitizers
    will fix this
  • Want to Alarm/Archive in EPICS
  • Get Doocs2Epics interface running.
  • Upgrade DOOCS Driver with new server (firmware
    has changed)
  • Automation, Automation, Automation
  • Dennis Nicklaus away at LHC for summer May -gt
    September.
  • Documentation

20
MDB with Electronics
21
MDB Cryo - EPICS
22
More MDB Cryo - EPICS
23
CRL at MDB
24
A0
  • Prototype of many pieces of equipment moving to
    NML
  • Photoinjector
  • OTR devices
  • BPMs
  • Strictly DOOCS
  • Many devices came from DESY
  • New beamline to be installed for this summer
  • PhD student working on thesis
  • Personnel Overloaded
  • Getting contract help from UofI
  • Start of possible collaboration with UofI on
    controls
  • Todo List
  • New equipment for testing
  • Replace old parts all cobbled together
  • Performance issues
  • Automation, automation, automation
  • Documentation

25
A0 Layout
26
DOOCS Display of A0
27
Overall NML Status
  • Lower priority than other ILCTA areas
    (HTF/VTS/A0)
  • gt suffers in schedule delay because personnel
    often the same.
  • Instrumentation effort has discovered that Ron
    (and Luciano) are great at integration.
  • ILCTA controls effort estimated at 12 FTEs. Jan
    efforts reports show 3.5 and February 3.1.
  • UofC magnets moved, building cleaned and painted
  • Beam line chalked in on the floor
  • Control room ceiling being retiled, carpeting
    scheduled. CPUs about ready to order
  • Building big enough for 1-2 cryomodule (8
    cavities).
  • 1 ILC RF station has 3 cryomodules
  • First arrivals unclear
  • CC2 Move from MDB
  • Photocathode prep and injection system from INFN
    in the fall
  • 1st cryomodule

28
NML Controls Work
  • Weekly status meetings
  • Monthly report (all of ILC controls activity)
  • Requirements document started
  • MS Project Plan started
  • Control room outfitting in progress, equipment
    being ordered
  • Cosylab Epics embedded IOC ordered and tested.
  • Cryo components being brought online
  • Would like website to help document

29
NML Beam Instrumentation
beam trans.
bunch compressor
booster cavities1 2
doublet
triplet
quads
dipole
doublet
RF-gun
3.9 Ghz cav
C
PS
O
O
F
O
O
O
O
O
T
S
S
B
O
C
B
Y
T
B
O
Y
O
S
O
S
T
S
Y
S
S
O
T
T
P
T
S
O
low energy injector dump
ILC Module 1
doublet
doublet
dipole
beam-line for advanced beam instrumentation, e.g.
EOS, Laser-wire, OTRI, cavity BPMs,
HOM couplers
S
O
B
T
O
S
O
S
S
high energy intensity dump
B
C
T
O
Beam current / bunch charge (Ttoroid) Time-of-fl
ight or beam phase monitor Synchrotron light
bunch length monitor BPM (Bbutton, Sstripline,
Ccavity, PSperp. stripline) Screen monitor
(YYaG, OOTR, CCTR, Sslit, FF-cup)
dog leg test beam-line (TBD)
S
T
triplet
S
S
dipole
30
NML Controls Overview
Electronic Logbook (CRL)
Data Management

1G Ethernet
31
NML Before
32
NML Now
33
NML Cryo -EPICS
34
More NML Cryo
35
Light Reading
  • Rob Kutschkes cartoon view of accelerators.
  • http//docdb.fnal.gov/ILC-public/DocDB/ShowDocumen
    t?docid392
  • Workpackage list
  • Not yet in a database ?.
  • Monthly Status
  • http//docdb.fnal.gov/ILC-public/DocDB/ShowDocumen
    t?docid401
  • http//docdb.fnal.gov/ILC-public/DocDB/ShowDocumen
    t?docid390
Write a Comment