1ILC Forum
- Controls
- Margaret Votava
- (To be temporarily replaced with Sharon Lackey in
AD)
2What are we working on - Globally
- Produce RDR and now EDR at the end of 2009
- or 2010 or 2011 depending on who you talk to
- EDR requirements are not well defined
- Manage/conduct Global RD plan in units called
Work Packages. First draft done. - Collaboration primarily with ANL and to a lesser
extent SLAC - Small FNAL effort for RDR/EDR.
- Steve Wolbers (was Patty), Bakul Banerjee,
Margaret Votava, Vince Pavlicek, Mark Bowden,
Bill Haynes, Jim Patrick, Sharon Lackey - Weekly telecon meetings.
- Consumes all FNAL FTEs paid for by the GDE
- RDR done except
- for technical notes that expand details
- WBS type things like complete basis of estimate
- Placeholder for other things like controls effort
needed for instrumentation RD - Ron/Lucianos trip(s) to DESY and KEK for HOM BPM
Testing - Charlie Briegels ATCA work for ATCA BPMs at NML
3ATCA
- Advanced Telecommunications Architecture
- Emerging Standard for High Availability
Architectures - One of the ILC Controls Challenges. Up time of
99.999 - Being really pushed by SLAC as part of the
architecture for ILC controls. - Offers hot swap of boards, redundant power
supplies and networking - Telecommunications gt digital.
- No commercial analog boards
- Commercial plug ATCA workshop as part of RT
conference on Sunday April, 29th. - Hardware/software tutorials
- Talks on User Experience and
- 80 registration
4ILC Overview from RDR
Middleware Services
User Displays
Front End
5ILC Controls RD
- High Availability
- Evaluating ATCA as a standard outside of
instrumentation - Diagnostic Interface Layer
- Evaluation of high availability software
techniques in all layers - Standards, standardization, quality assurance
- Timing/feedback
- Precision timing and RF phase distribution
- Extensive reliance on automation and beam based
feedback - Controls system studies
- Conflict Avoidance
- Fault detection and recovery
- Scalability
- RD needed to configure/control/monitor a
control system as complex as the ILC. - Remote operations
- Provide a framework which is supportive of remote
operations RD such as role based access.
6ILC Controls Work Packages
- Encompasses FY08 and FY09 RD Funding
- Not much. 5.6M in FY08. Includes salaries.
- another 4M for SCRF, but this is really FNAL
money - Given to ART Global systems leaders on Wednesday.
- John Carwardine (ANL) and Ray Larsen (SLAC)
- More than just controls. Includes
instrumentation, alignment - Work Packages 1-2 page description
- High Availability
- Claude Saunders (ANL) Lead
- Controls System Architecture
- Claude Saunders (ANL) Lead
- ATCA
- Looking for FNAL work package leader Vince
Pavlicek (FNAL) temp lead - SCRF
- Margaret Votava (FNAL) Lead
- FNAL contribute 12FTE annually
- Management
- EDR, requirements document, and L3 controls
leader - Looking for Americas L3 Controls Leader
7Commercial Break for Glossary
- SMTF -gt ILCTA -gt SCRF
- All are Fermilab centric, i.e., no other lab is
building a facility called ILCTA - SMTF Superconducting Module Test Facility.
- Initially just the work being done at A0
- ILCTA ILC Test Accelerator
- Includes all ILC test areas. A0 (prototype of NML
and 3.9 GHz testing program), VTS_at_IB1, HTS_at_MDB,
and NML - SCRF Superconducting RF
- Renamed in light of DOE funding request. Didnt
want it to be solely an ILC test facility but
allow for all kinds of accelerator RD. - VTS Vertical Test Stand, VTF.
- Just one for now, more are planned. Need new cryo
system at IB1 - HTS Horizontal Test Stand, HTF.
- Just one for now, more are planned. Will need new
klystron
8More Glossary NML/CTF
- NML SCRF test area with beam
- DOE Review recommendation was to build a CTF
(cryomodule test facility) with no beam. Similar
to VTF/HTF, but for cryomodule. - FNAL still believes beam area critical.
9SCRF Requests
- Controls RD is focused in two areas
- RD to create stable and robust controls system
for SCRF RD program - RD for ILC Controls
- DOE request address only the SCRF RD program
- Want to make ourselves available for ILC Controls
RD - Control system is recognized critical for ILC
success - NML is strong site for controls RD
- Running with ILC beam parameters
- Conveniently located near institutions involved
in global controls effort (ANL, FNAL) - Close collaborators with others (DESY, SLAC).
- Not much recommended GDE funding in near term,
but will come.
10SCRF Control Goals
- Provide an operationally stable system for the
automatic procedures needed for cavity and
cryomodule testing - Provide a consistent controls infrastructure for
all the facilities VTS, HTS, NML. - VTS controls in the SNS package. Interface to
common electronic logbook/data management
systems. - Provide an infrastructure that can readily
integrate components developed at collaborating
institutions - Provide a work area conducive ILC Controls RD
- These goals are not always compatible.
- Balance needs to be found
11SCRF Focus
- Infrastructure support
- Core controls system(s) support, development, and
configuration management including code packaging
and distribution - Controls systems include EPICS, DOOCS and
diagnostic systems such as LabView and MatLab - Develop cavity data management system
- Additional component support including system
management, electronic logbook, cavity data
management system - Test area specific
- NML specific development
- Develop timing and clock system that are required
for first beam operation - Develop interfaces for new components for
instrumentation and control - Develop controls interface for ATCA BPMs
- Develop/configure NML application software
- HTS/VTS ongoing support updating processes, and
user interfaces as more experience with the
cavities is gleaned.
12Controls Resources Needed
- Labor - 12 FTE annually
- Infrastructure support
- NML specific support
- HTS/VTS support
- Cavity Data Management Development (1 year only)
- Details later
- CD Ron, Luciano, Margaret, New Hire, Bakul, Rob
Kutschke, Connie/Troy - AD Mike Kucera (SCRF Controls Deputy Head),
Sharon Lackey (Head while Margaret gone), Dennis
Nicklaus, Jerry Firebaugh, Jimmy Wu, Michele
McCusker-Whiting - PPD Geoff Savage, Vladimir Sirotenko
- UofI contract Micheal Davidsaver
- MS 950K
- Gigabit network infrastructure
- RF interlocks
- Event clock/timing system
- Data acquisition and control (IOCs)
- Local consoles, archiving, logbook..
- Control room outfitting
13Annual Labor Details
- About 8.5 FTEs identified spread over 25 people
in 4 divisions (bulk in AD and CD) - Connie/Troy starting sys admin support
- In processing of hiring new full time person.
- In process of establishing collaboration with UofI
14NML MS Details
- FY07 - 315K
- 115 Crates and electronics - VME Crates,
processors, cathode system interface, IOCs and
hardware, digitizer boards, timing modules,
controls interface to the safety system, CM1
motor controls, UPS for some network switches and
cryo consoles, and wireless network. - 52K Network switches
- 45K RF interlock
- 35K Control room outfitting
- 23K Control room consoles a few machines
- 20K Test system
- 15K Event Clock System
- Rest few commodity CPUs
- FY08 - 468K
- 150 RF Interlocks - CM1 and injector
- 110K Crates and electronics - Interfaces for
instrumentation and MPS - 80K miscellaneous
- 62K Computing control room
- 36K Software floating licenses
- 20K Test Rack
- Rest small networking and commodity computing
purchases - FY09 - 162K
15Cavity Data Management
- Tracks all data about the cavity from processing
through testing - Scope creep (explosion). First FNAL only -gt now
worldwide. Cut back to North America. - EDMS issue, but has been in controls WBS
- Team established last summer to evaluate
alternatives, make recommendations, and develop
system - Peter Kasper (lead), Jerzy Nogiec, Joe Ozelis,
Jamie Blowers, Claude Saunders (ANL), Marc
Paterno, Janice Nelson (SLAC) - Major options
- DESY system data centric
- JLAB system process centric
- Commercial solution - costly
- Roll our own
- External requirements review last Friday
- Went well report expected by Thursday
- Included DESY and and JLAB
- Proposal review to come shortly (couple of weeks)
16Global Infrastructure
- Establishing EPICS installation layout
- Epics has its own build system that is different
than the FNAL/CD standard way. - Primarily paths are hardcoded, not determined via
environment variables. This has a large
implication on build and distribution strategies.
- Proposal next week
- Naming convention for EPICS variables
- Proposal in AD Doc database
- http//beamdocs.fnal.gov/AD-public/DocDB/ShowDocum
ent - Consistent for HINS and ILC
- Make data transition between DOOCS and EPICS
easier - ILC Official Document database
- Not well configured yet (IMHO)
- Documents can only have one topic
- No topic/subtopic organization for ILCTA
- Will get summer student to relocate things from
the docdb demo/plone site to here. - System Management
- Connie/Troy helping here (Thanks!)
- Custom kernels, many behind AD firewall, in
remote locations, etc. - CRL installed and in use
17VTS
- Not much to say
- Controls system in LabView. Provided by JLab as
part of MOU. - Needs to interface to CRL and cavity data
management system.
18MDB Controls Overview
Electronic Logbook (CRL)
Data Management
LabView App (Diagnostics)
MatLab App (Diagnostics)
EPICS APP (State Machine)
EPICS APP (Archiving)
1G Ethernet
19HTF/CC2
- Primarily EPICS, but LLRF in DOOCS
- Todo list
- LLRF Controller is SPARC board. Its old and
problematic. Working on replacing it with an X86
running Linux. - Still includes ACNET for RF interface
- New interlock crates with additional digitizers
will fix this - Want to Alarm/Archive in EPICS
- Get Doocs2Epics interface running.
- Upgrade DOOCS Driver with new server (firmware
has changed) - Automation, Automation, Automation
- Dennis Nicklaus away at LHC for summer May -gt
September. - Documentation
20MDB with Electronics
21MDB Cryo - EPICS
22More MDB Cryo - EPICS
23CRL at MDB
24A0
- Prototype of many pieces of equipment moving to
NML - Photoinjector
- OTR devices
- BPMs
- Strictly DOOCS
- Many devices came from DESY
- New beamline to be installed for this summer
- PhD student working on thesis
- Personnel Overloaded
- Getting contract help from UofI
- Start of possible collaboration with UofI on
controls - Todo List
- New equipment for testing
- Replace old parts all cobbled together
- Performance issues
- Automation, automation, automation
- Documentation
25A0 Layout
26DOOCS Display of A0
27Overall NML Status
- Lower priority than other ILCTA areas
(HTF/VTS/A0) - gt suffers in schedule delay because personnel
often the same. - Instrumentation effort has discovered that Ron
(and Luciano) are great at integration. - ILCTA controls effort estimated at 12 FTEs. Jan
efforts reports show 3.5 and February 3.1. - UofC magnets moved, building cleaned and painted
- Beam line chalked in on the floor
- Control room ceiling being retiled, carpeting
scheduled. CPUs about ready to order - Building big enough for 1-2 cryomodule (8
cavities). - 1 ILC RF station has 3 cryomodules
- First arrivals unclear
- CC2 Move from MDB
- Photocathode prep and injection system from INFN
in the fall - 1st cryomodule
28NML Controls Work
- Weekly status meetings
- Monthly report (all of ILC controls activity)
- Requirements document started
- MS Project Plan started
- Control room outfitting in progress, equipment
being ordered - Cosylab Epics embedded IOC ordered and tested.
- Cryo components being brought online
- Would like website to help document
29NML Beam Instrumentation
beam trans.
bunch compressor
booster cavities1 2
doublet
triplet
quads
dipole
doublet
RF-gun
3.9 Ghz cav
C
PS
O
O
F
O
O
O
O
O
T
S
S
B
O
C
B
Y
T
B
O
Y
O
S
O
S
T
S
Y
S
S
O
T
T
P
T
S
O
low energy injector dump
ILC Module 1
doublet
doublet
dipole
beam-line for advanced beam instrumentation, e.g.
EOS, Laser-wire, OTRI, cavity BPMs,
HOM couplers
S
O
B
T
O
S
O
S
S
high energy intensity dump
B
C
T
O
Beam current / bunch charge (Ttoroid) Time-of-fl
ight or beam phase monitor Synchrotron light
bunch length monitor BPM (Bbutton, Sstripline,
Ccavity, PSperp. stripline) Screen monitor
(YYaG, OOTR, CCTR, Sslit, FF-cup)
dog leg test beam-line (TBD)
S
T
triplet
S
S
dipole
30NML Controls Overview
Electronic Logbook (CRL)
Data Management
1G Ethernet
31NML Before
32NML Now
33NML Cryo -EPICS
34More NML Cryo
35Light Reading
- Rob Kutschkes cartoon view of accelerators.
- http//docdb.fnal.gov/ILC-public/DocDB/ShowDocumen
t?docid392 - Workpackage list
- Not yet in a database ?.
- Monthly Status
- http//docdb.fnal.gov/ILC-public/DocDB/ShowDocumen
t?docid401 - http//docdb.fnal.gov/ILC-public/DocDB/ShowDocumen
t?docid390