Feasibility Study: Manufacturing CompetenciesSkills Assessment Instrument - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

Feasibility Study: Manufacturing CompetenciesSkills Assessment Instrument

Description:

(1) assess a job seeker's ability to perform the technical skills needed to ... the job posting would help the Workforce Center identify candidates to fill those jobs ... – PowerPoint PPT presentation

Number of Views:78
Avg rating:3.0/5.0
Slides: 18
Provided by: marcco
Category:

less

Transcript and Presenter's Notes

Title: Feasibility Study: Manufacturing CompetenciesSkills Assessment Instrument


1
Feasibility StudyManufacturing
Competencies/Skills Assessment Instrument
  • Project Report
  • November 21, 2002

2
Project Goal
  • To determine whether or not a pilot project
    could create an on-line interactive manufacturing
    competencies/skills assessment instrument for
    individual clients of Colorado Workforce Centers.
    The proposed instrument would
  • (1) assess a job seekers ability to perform the
    technical skills needed to successfully carry out
    a job within the manufacturing sector
  • (2) to identify skill needs so that job seekers
    can participate in appropriate training programs
    to prepare for meaningful employment in the State
    of Colorado.

3
Project Methodology
  • Became familiar with the operations at the
    Tri-County Workforce Center
  • Interviewed local manufacturing companies
  • Reviewed manufacturing skill sets
  • Reviewed and evaluated existing assessment
    instruments
  • Interviewed national assessment development
    experts

4
Finding 1
  • A job request form which specifically identifies
    skills and work environment for the job posting
    would help the Workforce Center identify
    candidates to fill those jobs

5
Finding 2
  • Use of standard screening tools at workforce
    centers would encourage employers to use the
    centers for their employment needs

6
Finding 3
  • Job applicants need to be aware of the
    environmental conditions associated with
    manufacturing jobs

7
Finding 4
  • A customized list of manufacturing skills and
    competencies developed and validated with
    manufacturing companies in the State of Colorado
    can be developed for a screening tool.

8
Finding 5
  • A list of environmental factors associated with
    manufacturing jobs developed and validated with
    manufacturing companies in Colorado is needed for
    use in a screening tool.

9
Finding 6
  • None of the assessment instruments available
    measure a candidates ability to perform skills
    required for manufacturing jobs

10
Finding 7
  • Although an assessment tool is cost-prohibitive
    for a pilot study, a screening tool would improve
    the selectivity for job applicants on a
    cost-effective basis

11
Conclusion
  • There is a need for a system that would better
    match job-applicants with job openings
  • Such a system would be best implemented through
    the referral process at the workforce centers
  • Such a system would be best if used in
    conjunction with existing aptitude/ability
    assessments such as WorkKeys

12
Proposed Pilot Project
  • Develop a competency/skill based screening tool
    for use at the Tri-County Workforce Center which
    would
  • Allow companies to efficiently identify skill
    needs for a job opening
  • Allow workforce centers to screen candidates
    based on these skills to make accurate referrals
    and training needs assessments

13
Pilot Project Outline
  • Develop a competency/environmental condition
    job-request form
  • Develop a screening tool
  • Implement WorkKeys
  • Determine national best practices

14
Twelve Month Project Timeline
  • First Quarter
  • Validate competencies/skills
  • Format job-request checklist
  • Begin administering WorkKeys
  • Initiate national study of manufacturing skill
    assessment practices

15
Twelve Month Project Timeline
  • Second Quarter
  • Develop screening methodologies to determine a
    job-seekers
  • Experience performing identified skills
  • Comfort working under identified environmental
    conditions

16
Twelve Month Project Timeline
  • Third Quarter
  • Test the job-request form and screening tool at
    the Tri-County Workforce Center

17
Twelve Month Project Timeline
  • Fourth Quarter
  • Evaluate pilot project through interviews and
    surveys of reprehensive job seekers,
    manufacturers, and workforce center staff
  • Develop report for best practices in
    manufacturing assessments and referral processes
Write a Comment
User Comments (0)
About PowerShow.com