Title: SOURCE REDUCTION TEAM


1
SOURCE REDUCTION TEAM
  • PROGRESS REPORT
  • February 23, 2000

2
SOURCE REDUCTION TEAM MEMBERS
  • Bill Vondersmith, P2AD Co-Chair
  • Mike Bien, Ft. Gordon Co Chair
  • Nelson Rivera, Moody AFB
  • Roger Cannon, Robins AFB
  • Randy Jones, Ft. Stewart
  • Robb Truver, USMC Depot
  • Linda Willis, Lockheed Martin

3
SOURCE REDUCTION ISSUES
  • Survey to identify assessment candidates
  • DoD funding for demonstration projects
  • Conduct joint equipment evaluation
  • Address NESHAPS
  • Affirmative procurement/green products
  • Results based budgeting

4
ADDRESSINGSOURCE REDUCTION ISSUES
  • Survey Top 3 candidates were vehicle
    maintenance, painting, and solvent cleaning
  • Performed vehicle maintenance assessment at Ft.
    Gordon Draft report completed
  • DoD funding for demonstration projects - Future
  • Joint equipment evaluations - Future
  • Address NESHAPS - Future
  • Affirmative procurement - Part of assessments
  • Results based budgeting ABC to justify
    economics

5
SOURCE REDUCTION TEAMINITIAL MISSION
  • Identify P2 opportunities at DoD facilities
  • Conducted survey
  • Select a project at one facility implement a
    solution
  • Vehicle maintenance _at_ Ft. Gordon
  • Disseminate details of solution to partnership
  • Assessment Report Draft completed

6
SOURCE REDUCTION TEAMVEHICLE MAINTENANCE
ASSESSMENT FT. GORDON
  • SAMPLE OF P2 OPPORTUNITIES
  • Closed Loop Re-refined Oil Program
  • Potential 6,000/yr. Waste disposal savings
  • No capital expenditure
  • Install boiler to burn used oil for domestic hot
    water
  • Estimated savings 9,821/yr. With 1.3 yr. Payback
  • Labor to operate the boiler not included
  • On-site antifreeze recycling
  • Est. savings - 5,483 with 2.7 yr. Payback
  • Equipment has been purchased

7
SOURCE REDUCTION TEAMVEHICLE MAINTENANCE
ASSESSMENT FT. GORDON
  • SAMPLE OPPORTUNITIES (continued)
  • Shop Rag Reuse Program
  • Estimated savings 2,158/yr.
  • No capital expenditure

8
SOURCE REDUCTION TEAMVEHICLE MAINTENANCE
ASSESSMENT FT. GORDON
  • P2 IMPROVEMENTS IN USE
  • Pulse charging system reduces sulfation of
    battery plates
  • Purchased in 1998 has saved over 62,000
  • Cost 5,000
  • Parts cleaners with a self-renewable
    bioremediation aqueous cleaning system
  • Non-hazardous
  • Eliminates disposal of spent solvent
  • Closed loop paint gun cleaner
  • Reduces solvent usage hazardous waste

9
SOURCE REDUCTION TEAMVEHICLE MAINTENANCE
ASSESSMENT FT. GORDON
  • P2 IMPROVEMENTS IN USE (continued)
  • HVLP paint guns
  • Saves paint reduces paint waste improved
    transfer efficiency
  • Peelable coating in paint booths
  • Eliminates solvents to clean paint booth
  • Reduces labor

10
SOURCE REDUCTION TEAMNEED FOR CHANGE
  • Performing Assessment with SRT Not Efficient
  • Data gathering at facility by on-site contact
  • Travel logistics to get all members on-site
  • Difficult to involve all team members
  • Need to Address Other Issues
  • Research waste reduction methods technologies
  • Document waste reduction improvements
  • Locate funding for pilot projects
  • Coordinate pilot projects document results

11
SOURCE REDUCTION TEAMNEED FOR CHANGE
  • Better Use of Team Resources
  • Diversify team activities
  • Increase team involvement
  • Increase flow of information to partnership
  • Provide a wide range of information

12
SOURCE REDUCTION TEAMREORGANIZATION
  • Waste Reduction Assessments
  • Cross-functional team to be provided by facility
  • SRT member to facilitate the assessment team
  • SRT to identify assessment activity needs
  • SRT to prepare a guide for conducting assessment
  • Waste Reduction Best Practices
  • Research best practices by activity/process
  • Identify facilities applying best practices
  • Verify and document applications

13
SOURCE REDUCTION TEAMREORGANIZATION
  • Funding For Demonstration Pilot Projects
  • Research funding sources
  • Identify projects
  • Solicit facilities for projects
  • Coordinate projects and document
  • Provide results to the Tech Transfer Team
  • Share results with partnership

14
SOURCE REDUCTION TEAMREORGANIZATION
  • Develop Handbook of Best Practices
  • Cross reference by activity where used
  • Provide User and vendor information and contacts
Write a Comment